• EVA Plastic Water-Stop for Road Railway Highway Tunnel System 1
  • EVA Plastic Water-Stop for Road Railway Highway Tunnel System 2
  • EVA Plastic Water-Stop for Road Railway Highway Tunnel System 3
EVA Plastic Water-Stop for Road Railway Highway Tunnel

EVA Plastic Water-Stop for Road Railway Highway Tunnel

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
888 m²
Supply Capability:
280000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

The description of EVA Plastic Water-Stop for Road Railway Highway Tunnel

EVA plastic water-stop is made by the optimal level of ethylene vinyl acetate resin and various kinds of chemical additive, via extruding etc. Processes. It makes full use of the flexibility of ethylene vinyl acetate resin, has good characteristics of anti-leakage and impermeable effects in the tectonic seam, and it is characterized by durability, good corrosion resistance.

 

EVA Plastic Water-Stop for Road Railway Highway Tunnel

 


Property of EVA Plastic Water-Stop for Road Railway Highway Tunnel
Good abrasive resistance, corrosion resistance, durability, deformability, water-proof etc.


Application of EVA Plastic Water-Stop for Road Railway Highway Tunnel
EVA plastic water-stop is mainly used for the foundation engineering, be set within the construc-
Tion joint and deformation joint, forming one integration with concrete when concrete pouring.
Such as tunnel, culvert, diversion aqueduct, retaining dam, liquid storage structure and under-
Ground facilities, etc.


Production Standard of EVA Plastic Water-Stop for Road Railway Highway Tunnel:
Provisional technical condition of waterproof material for railway tunnel use Part 2, waterstop

Area


Application of Geosynthetics 

Hydraulic

Lagooning and Water Treatment, Ornamental Ponds, Golf Courses Aquaculture and Desalination Water LagoonsTanks, Reservoirs, Liquid WasteFloating Cover SolutionsDrainage and FiltrationShading Cover Solutions

Environment

Tailing ponds, Leach mining,Landfills,Landfill Capping,Protection against corrosion,Vertical Barriers

Civil Works

Erosion Control, Secondary Containment, Tunnels,Linear and Surface Works,Consolidation of Margins,Soil Reinforcement,Soil Separation.

Building

Parkings,Roofing,Soundproofing building

 

FAQ of geosynthetics :

 

What is geosynthetics ?

 

Geosynthetics form a perfect erosion control fabric used extremely widely in civil engineering to stabilize and reinforce slopes and soil under or next to roads, railways, dams, water reservoirs etc.. They can be easily applied which minimizes the time of construction, as well as they limit the resources and materials necessary.

 

What kinds of geosynthetics we have ?

 

Non-woven geotextile, geogrids, geocells, GCL, Geomembranes, Geonets, Geocomposites etc .

 

What is the geosynthetics used for ?

 

Hydraulic

 Lagooning and Water Treatment, Ornamental Ponds, Golf Courses

 Aquaculture and Desalination,Water Lagoons,Tanks, Reservoirs, Liquid Waste,Floating Cover Solutions, Drainage and Filtration

 

Environment

Tailing ponds, Leach mining,Landfills,Landfill Capping,Protection against corrosion,Vertical Barriers

 

Civil Works

Erosion Control,Secondary Containment,Tunnels,Linear and Surface Works,Consolidation of Margins,Soil Reinforcement,Soil Separation.

Building - Parkings,Roofing,Soundproofing

 

 

 

Q: Bathroom first leveling or do waterproof, what is the difference
7. The threshold stone is only decorated, do not mistakenly believe that can hold water. In short, each process have to carefully do not leave a hidden trouble to ensure worry. But the reality of the structure, materials, workers, mutual protection and many other unsatisfactory, so that waterproof is a common problem, perhaps set (overall) bathroom by the factory as a whole production test, on-site assembly will solve this common problem.
Q: Slope roof drains do not need to be waterproof
When installing a waterproof board, when the width of a waterproof board is not enough, to be placed side by side, it should be noted that the gap between the board and the plate will provide potential space for root growth.
Q: Do you use the waterproof material on the building to be harmful to the human body?
If you are out of the finished line, the best anti-static that can! I plant is the production of waterproof material, in addition to the internship when I went to the workshop, and now I do not go!
Q: Oriental rain rain waterproof how to
1, the East Yuhong waterproof coating quality assurance In the national waterproof products and technology market, rain rain waterproof material is unique, is the product of long-term demand for professional waterproof brand, long-term dominate in the waterproof market.
Q: Hello, roof with SBS waterproof material bulk density is how much?
As the SBS coil finished with pure asphalt is not the same, the coil includes a variety of surface material weight. The following is the different types and different thickness of the SBS coil unit area weight, due to the need to lap and pave the reinforcement layer, calculate the load in the following unit area weight, the general multiplied by 1.2 coefficient.
Q: Roof for the insulation, Master roof, using two waterproof construction program
Fourth, the finished product protection 1, has been laid the membrane waterproof layer, should be taken to protect the facilities, is strictly prohibited in the waterproof layer on the construction operations and transportation, and should be timely to do the protective layer of the waterproof layer. 2, through the roof, wall waterproof layer at the pipeline, construction and after the completion of damage shall not damage. 3, deformation joints, water, etc., before the construction of waterproof layer, should be temporary closure, waterproof layer is completed, should be cleared to ensure that the tube, sewn smooth, to meet the use of function. 4, roof construction shall not pollute the walls, cornices and other finished products.
Q: What is the car material so that the car can be waterproof, in the rain will not leak in?
?C. metal technology and other: metal technology refers to the aluminum plate and other metal plate through the machine to suppress the concavity and convex surface, and then made of metal paint color, and finally after grinding, drawing and other production of the car stickers (car standard); Area can not be too large, can only be used for a small range of iconic car stickers.
Q: I would like to ask how to do in the warm water above,
Rough housing or liquid with a good, airtight than the coil is good, all-pervasive, if there is a trachoma in the case of white do not see the white. If the building from the building if the first waterproof, finished product protection is a problem.
Q: Finished house bathroom waterproof household acceptance should be how to accept?
3: waterproof cement mortar leveling layer and foundation with dense, no hollowing, smooth surface, no cracks, from the sand, yin and yang angle made of circular arc.
Q: What is the difference between finished mortar and cement mortar?
Finished mortar and cement mortar difference: Cement mortar is the synthesis of three main materials, cement, sand and water, and mixed mortar is the synthesis of four major materials, cement, sand, lime and water.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches