Duty Cable Ties
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 2000 Pieces pc
- Supply Capability:
- 60000 Pieces per Day pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Detailed Product Description
1.UL, GL, ABS, Lloyd's Register approved product.
2.Min. loop tensile strength:114kg (250 lbs)
3.High tensile strength cable ties.
4.Extra heavy duty ties for application where higher tensile strength is required.
5.One-piece construction for consistent performance and reliability.
6.Lowest threading force of any one-piece cable tie in the industry.
7.Recognition/ certification: UL, ABS, Lloyd's Register, GL
8.RoHS compliant. Halogen free material.
9.Material: Polyamide 6,6, UL94 V2
10.Color: All colors are available
- Q: What is the belt that is bound to the motorcycle line?
- Color voltage use red + 5V motherboard circuit, memory module power supply, optical drive, hard drive and other equipment power supply yellow +12 VCPU, graphics power supply; for the standard drive circuit power supply, such as optical drive, hard drive motor orange + 3
- Q: How to properly remove air conditioning in the absence of electricity
- 1. Fluoride: then the external machine of the high-pressure valve (thin tube) with a hexagonal wrench, closed, about 1-2 minutes after the closure of low-pressure pipe (thick tube). 2. Remove the pipe: with a movable wrench to high and low pressure pipe copper screw unscrewed. 3. Remove the internal and external cables. Open a plastic cover outside the machine, cable terminal can be seen, with a screwdriver screw off, remove the cable. (Do the mark, so as to avoid the next installation to line) 4. The machine (hang up) off, attached to the pipeline out. (Note: If you do not install a long time, also need to transport, it is best to tie in the pipeline on the cable removed, find the pipe and the machine's connecting nut, with two wrenches, And then the pipe plate is good) 5. Remove the wall of the machine hanging plate. (Hang up) 6. Remove the external machine, with two wrenches, the external machine 4 feet screw off, if the rust die also use the grinding machine to wear off the foot screw
- Q: The role of cable connector box classification installation requirements
- Although electricity and power generation are all power lines, they can be seen as two different systems. Therefore, when laying the cable, if the laying of the cable from the same bridge, the partition will be separated from the cable for future maintenance and maintenance. The The requirements of the partition depends on the depth of your bridge, the partition placed in the bridge, the bridge as high or slightly lower, if higher than the frame of the frame, affecting the beautiful, detailed provisions There is no ready-made plaintext.
- Q: We bought the elevator dedicated cable, with video power wire, the customers say that they have done before the tie tie is not broken, is the elevator installation problem or they require bundled copper wire should not be used To tie There are several elevators that are now under the copper wire cut off more
- With a multimeter (or shake the table) to measure the insulation, not more than 0.5M Europe on nothing, as long as the insulation of the wire enough, PVC pipe is not used to waterproof, it is used to prevent mechanical trauma, even if not irrigation, buried A long time the tube also has water vapor, is inevitable, nothing!
- Q: How about the vertical installation of the bridge, cable, What fixed? It is best to look at the fixed pieces of pictures, thank you more
- There should be a fixed cable in the bridge cable, you can directly with the cable tie to the top. Cable bridge: cable bridge is divided into slot, tray and ladder-type, mesh and other structures, by the bracket, arm and installation of accessories and other components. The inner frame of the building can be set up independently or attached to various structures and corridors. It should be characterized by simple structure, beautiful appearance, flexible configuration and convenient maintenance. All parts are galvanized. , Installed in the building outside the bridge, if it is in the vicinity of the sea or belong to the corrosion area, the material must have anti-corrosion, moisture resistance.
- Q: Dual-value capacitor asynchronous motor starting up the speed is high and low What is the reason, the motor rotation just to the high speed suddenly down again more
- My professional is to do this, but depends on your TV there is no audio output, it is very simple to use two sets of lines, do not control what is HDMI or color or video, respectively, connected to the TV. And then use the TV AV / TV to choose just like the protection of the pole pole pepper locust Ge Wei Gonglian, if the TV sound to the sound, first look at the TV output. If there is connected to the amplifier. Not on the set-top box assigned to the amplifier "answer is completed
- Q: What are the maintenance knowledge of the manipulator?
- 2: Robot cycle The robot manipulates the work by listening to any abnormal sound, such as howling, clicking, etc
- Q: What equipment does fiber engineering need? What are the brands?
- WDZ-Low Smoke Halogen-free Flame Retardant Cable WDZN-Low Smoke Halogen Free Flame Retardant Cables,
- Q: The use of composite heat - shrink tape
- Composite insulation heat shrink tape (cable repair heat shrink zone) Operating Instructions
- Q: The police station asked to install a small hotel to monitor the camera, do not know how to choose the camera, you need to prepare what materials, cost about how much money?
- Fart, 1500 can buy a ghost, depends on how much you do, most of the door in the door line. All the lines in the room are going. Then in the way to determine the line pipe. Usually a group of air conditioning in the living room line. A group of green rooms. Kitchen a group of green. Bathroom a group of green. So the pipe is more. There are also money to do the hair, there are more money. The key is your own quality requirements. And I'm talking about spending the least reasonable way. How much pipe you can do to the number, about 5000 or so, the material.
1. Manufacturer Overview
Location | Taiwan |
Year Established | 1976 |
Annual Output Value | |
Main Markets | North America South America Eastern Europe Southeast Asia Africa Oceania Mid East Eastern Asia Western Europe Central America Northern Europe Southern Europe South Asia Domestic Market |
Company Certifications | ISO 9001:2008;ISO 14001:2004;ISO/TS 16949 |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | Laem Chebang/Thailand,Bangkok/Thailand,Donnguan/China |
Export Percentage | 91% - 100% |
No.of Employees in Trade Department | 21-50 People |
Language Spoken: | English, Chinese, Spanish, Japanese |
b) Factory Information | |
Factory Size: | |
No. of Production Lines | Above 10 |
Contract Manufacturing | OEM Service Offered Design Service Offered Buyer Label Offered |
Product Price Range | High and/or Average |
Send your message to us
Duty Cable Ties
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 2000 Pieces pc
- Supply Capability:
- 60000 Pieces per Day pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords