Cable Tie with High Quality and Releasable Price
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1000 Pieces m
- Supply Capability:
- 100000 Bags per Week m/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Material;Nylon 66, 94V-2 certificated by UL.Heat-resisting,Acid & erosion control, insulate well and not apt to age.
Operating temperature;-35 Degree to 85 Degree.
Color;Natural(or white, standard color),UV black and other colors are available as requested.
Size as Following:
ITEM.NO. | L | W(mm) | MAX.BUNDLE DIA.(mm) | TENSILE STRENGTH | ||
INCH | MM | LBS | KGS | |||
S-200RT | 8″ | 200 | 7.5 | 45 | 50 | 20 |
S-250RT | 10″ | 250 | 7.5 | 45 | 50 | 20 |
S-300RT | 12″ | 300 | 7.5 | 45 | 50 | 20 |
S-350RT-2 | 135/8″ | 350 | 8 | 45 | 50 | 22 |
S-400RT-2 | 15 3/4" | 400 | 8 | 105 | 50 | 22 |
S-450RT-2 | 17 3/4″ | 450 | 8 | 130 | 50 | 22 |
S-500RT-2 | 1911/16″ | 500 | 9 | 150 | 65 | 30 |
S-550RT-2 | 2111/16″ | 550 | 9 | 160 | 65 | 30 |
S-100RT-3 | 4″ | 100 | 2.5 | 22 | 18 | 8 |
S-145RT-3 | 6″ | 150 | 2.5 | 35 | 18 | 8 |
S-150RT-3 | 6″ | 150 | 3.5 | 35 | 40 | 18 |
S-300RT-4 | 11 5/8″ | 300 | 12.7 | 82 | 250 | 114 |
S-400RT-4 | 15 3/4" | 400 | 12.7 | 105 | 250 | 114 |
S-450RT-4 | 17 3/4" | 450 | 9 | 118 | 175 | 80 |
S-550RT-4 | 21 3/4″ | 550 | 9 | 160 | 175 | 80 |
S-780RT-4 | 3011/16″ | 780 | 12.7 | 230 | 250 | 114 |
- Q: Air source heat pump water heater how to install
- according to the TV remote control to the source of the source key;
- Q: How to properly remove air conditioning in the absence of electricity
- Installed with a line, dark with a line tube. Ming with the trunks more beautiful.
- Q: The role of cable connector box classification installation requirements
- Although electricity and power generation are all power lines, they can be seen as two different systems. Therefore, when laying the cable, if the laying of the cable from the same bridge, the partition will be separated from the cable for future maintenance and maintenance. The The requirements of the partition depends on the depth of your bridge, the partition placed in the bridge, the bridge as high or slightly lower, if higher than the frame of the frame, affecting the beautiful, detailed provisions There is no ready-made plaintext.
- Q: Ordinary air conditioning louvers, one square meter of louver aluminum consumption is good?
- Tray cable tray, it has a light weight, load, handsome in appearance, simple structure, easy installation, it is suitable for power cable installation, but also for the control cable laying Cascade cable bridge, suitable for general straight light cable laying, especially for high and low power cable laying
- Q: Dual-value capacitor asynchronous motor starting up the speed is high and low What is the reason, the motor rotation just to the high speed suddenly down again more
- My professional is to do this, but depends on your TV there is no audio output, it is very simple to use two sets of lines, do not control what is HDMI or color or video, respectively, connected to the TV. And then use the TV AV / TV to choose just like the protection of the pole pole pepper locust Ge Wei Gonglian, if the TV sound to the sound, first look at the TV output. If there is connected to the amplifier. Not on the set-top box assigned to the amplifier "answer is completed
- Q: How to connect the high voltage distribution cabinet twice
- . because the PVC trunking itself is very light, and easy to cut, so in addition to bulk cutting generally do not need mechanical cutting. . no pvc trunking 45 degrees angle of special tools, only do it yourself.
- Q: What are the maintenance knowledge of the manipulator?
- 2: Robot cycle The robot manipulates the work by listening to any abnormal sound, such as howling, clicking, etc
- Q: Whether the wire entry and exit distribution box should be reserved length
- If the cable, the current should be appropriate to reduce, take 6-7A more appropriate. Total power 1300-1500W.
- Q: Elevator monitoring video line tied to the accompanying cable which side is good? How to determine which side of the cable is strong, there are different elevator brand approach is not the same? Such as Otis Elevator and Mitsubishi Elevator. Question added: online There are articles on both sides is not the same, while the high voltage interference is also large, but did not say how to identify more
- Part of the construction process requirements for reference Metal Trunking Wiring Installation Construction Technology 1 Scope This process standard applies to the installation of metal trunking wiring in buildings
- Q: How does the geothermal switch above the sensor line pick up?
- Can be removed after the general two sets of lines, a group of power lines, but the notebook screen power cord and desktop is not the same, usually 12v high pressure package, so you have to prepare 12v transformer power supply to it, the other line is the signal Line, and see a few cores, y should be able to add a conversion port into hdml line. But now based on the display price is not expensive, there is a risk of modification, personally feel that little, if the host is broken, the display intact, it is better to put Taobao, sell, sell money to buy a new desktop!
1. Manufacturer Overview
Location | Zhejiang, China |
Year Established | 2009 |
Annual Output Value | Below US$1 Million |
Main Markets | North America South America Eastern Europe Oceania Mid East Eastern Asia Western Europe |
Company Certifications | ISO 9001:2000 |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | ningbo,shanghai |
Export Percentage | 81% - 90% |
No.of Employees in Trade Department | 3-5 People |
Language Spoken: | English, Chinese |
b) Factory Information | |
Factory Size: | 3,000-5,000 square meters |
No. of Production Lines | 5 |
Contract Manufacturing | OEM Service Offered Buyer Label Offered |
Product Price Range | High and/or Average |
Send your message to us
Cable Tie with High Quality and Releasable Price
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1000 Pieces m
- Supply Capability:
- 100000 Bags per Week m/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches