Cable Tie with High Quality and Releasable Price
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1000 Pieces m
- Supply Capability:
- 100000 Bags per Week m/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Material;Nylon 66, 94V-2 certificated by UL.Heat-resisting,Acid & erosion control, insulate well and not apt to age.
Operating temperature;-35 Degree to 85 Degree.
Color;Natural(or white, standard color),UV black and other colors are available as requested.
Size as Following:
ITEM.NO. | L | W(mm) | MAX.BUNDLE DIA.(mm) | TENSILE STRENGTH | ||
INCH | MM | LBS | KGS | |||
S-200RT | 8″ | 200 | 7.5 | 45 | 50 | 20 |
S-250RT | 10″ | 250 | 7.5 | 45 | 50 | 20 |
S-300RT | 12″ | 300 | 7.5 | 45 | 50 | 20 |
S-350RT-2 | 135/8″ | 350 | 8 | 45 | 50 | 22 |
S-400RT-2 | 15 3/4" | 400 | 8 | 105 | 50 | 22 |
S-450RT-2 | 17 3/4″ | 450 | 8 | 130 | 50 | 22 |
S-500RT-2 | 1911/16″ | 500 | 9 | 150 | 65 | 30 |
S-550RT-2 | 2111/16″ | 550 | 9 | 160 | 65 | 30 |
S-100RT-3 | 4″ | 100 | 2.5 | 22 | 18 | 8 |
S-145RT-3 | 6″ | 150 | 2.5 | 35 | 18 | 8 |
S-150RT-3 | 6″ | 150 | 3.5 | 35 | 40 | 18 |
S-300RT-4 | 11 5/8″ | 300 | 12.7 | 82 | 250 | 114 |
S-400RT-4 | 15 3/4" | 400 | 12.7 | 105 | 250 | 114 |
S-450RT-4 | 17 3/4" | 450 | 9 | 118 | 175 | 80 |
S-550RT-4 | 21 3/4″ | 550 | 9 | 160 | 175 | 80 |
S-780RT-4 | 3011/16″ | 780 | 12.7 | 230 | 250 | 114 |
- Q: The role of cable connector box classification installation requirements
- Although electricity and power generation are all power lines, they can be seen as two different systems. Therefore, when laying the cable, if the laying of the cable from the same bridge, the partition will be separated from the cable for future maintenance and maintenance. The The requirements of the partition depends on the depth of your bridge, the partition placed in the bridge, the bridge as high or slightly lower, if higher than the frame of the frame, affecting the beautiful, detailed provisions There is no ready-made plaintext.
- Q: Computer behind the wire is messy, what way to change the neat little Such as
- Plus a separate graphics card. Must be dual interface that kind of discrete graphics. In this way, the computer watching movies, television can also see. But installed, you need to set up. Or is the connection to support Cao Cao Yu 丨 good check pupil intestinal traps. Because now a lot of digital TV can plug the cable to watch the movie. this is okay too
- Q: I got the machine, and then removed, there is a section of the tube was bent, and that position really need to fold before, because there is a turn, but now that place too hard, and completely unreasonable that he is normal Of the time, because the demolition of a little time will be folded, do not know that they may be deliberately? And then to add money, encounter this situation usually how to do more
- Single-core cable line grounding line commonly used grounding 1. shield one end directly grounded, the other end through the protective layer to protect the ground: When the line length of 500 --- 700m and below, the shield can be used directly to one end of the ground (cable terminal Position ground), the other end through the protective cover to ground. 2. shield the midpoint of the ground: When the line length of 1000 ---- 1400m, the use of midpoint grounding. in the middle of the line position, the shield directly grounded, the cable ends of the shield through the protective cover to ground. The middle ground is usually required to install a straight connector. Install an insulated connector at the midpoint of the line. The insulated connector disconnects the cable shield, and the shield is grounded through the protective cover, and the two cables are shielded and grounded directly. 3. Shielded cross-connect cable lines are very long (1000 --- 1400m above), you can use shield cross-connect. This method is divided into three equal parts of the length of the three or three times the number of segments, each section between the installation of insulation joints, insulation joints between the three-phase shield with a coaxial cable, cross-linked box for transposition, cross The interconnection box is provided with a set of protective protector, and the two sets of insulated connectors are arranged on the line.
- Q: Ordinary air conditioning louvers, one square meter of louver aluminum consumption is good?
- Tray cable tray, it has a light weight, load, handsome in appearance, simple structure, easy installation, it is suitable for power cable installation, but also for the control cable laying Cascade cable bridge, suitable for general straight light cable laying, especially for high and low power cable laying
- Q: The elevator has 23 floors. But I have not installed before. I would like to ask how to install. How does the video line go? Thank you more
- Must be looking for maintenance elevators are under the staff communication, because we are not on the elevator car roof are right. Let them cooperate. And then to the top of the elevator to make a hole on it. Elevator top 220 power supply! It is best not to take, the elevator power failure will be invalid, how to see someone in the elevator did not. Signal line extension of this cable with cable tie, must be shielded, there are lifts are dedicated. Ordinary signal lines can also be used with soft!
- Q: Five ridge hoarding locusts on the high-chu chu chu chu floor layer. Two elevators tied side by side, to cloth video cable, how cloth ah? The The Online to say with the network cable, there is a direct use of coaxial video! I would like to ask how to use coaxial video cable cloth? The Will there be a reserved interface on the car? Or need to take electric drill to play the outer hole, the video line into the box to go inside? The High phone, detailed words ah! The The Thank you! The More
- With real estate license, household ID card, you can come to the cable TV business hall to go directly
- Q: What are the maintenance knowledge of the manipulator?
- 1: rails and bearings to keep all the shafts at the guide and bearing cleaning and good lubrication performance
- Q: What are the precautions for using the cable mesh and how to use it?
- No instructions are clearly stated or allowed. In the "Code for Design of Electric Power Cables" (GB-2007), the provisions of 5.1.3 stipulate that if the number of cables in the same channel is large, if the laying of the multi-layer bracket on the same side, the following provisions shall be met: High to low power cables, strong to weak control and signal cables, communication cables "top to bottom" in the order. When the horizontal channel contains more than 35kV high-voltage cable, or to meet the introduction of the cabinet tray to meet the requirements of the bend radius requirements, should be "bottom-up" in order. In the same project or the cable channel extends to different projects, should be arranged in the same order. 2 bracket space by the channel space constraints, 35kV and below the adjacent voltage level power cables can be arranged in the same layer of support, 1kV and below the power cable can also be with the strong control and signal cable configuration in the same layer of the bracket. 3 The work of the same important circuit and the backup cable should be arranged on the different layers of the brackets. It is possible to note that it is restricted by passage space from section 2. If you really want to lay together, it should be noted that 10kV cable can not use single-core cable, you need to use three-core cable.
- Q: Whether the wire entry and exit distribution box should be reserved length
- If the cable, the current should be appropriate to reduce, take 6-7A more appropriate. Total power 1300-1500W.
- Q: Will the power cord wiring with what is called, how the insulation effect
- One is four 50 flat one is a 4 * 50
1. Manufacturer Overview
Location | Zhejiang, China |
Year Established | 2009 |
Annual Output Value | Below US$1 Million |
Main Markets | North America South America Eastern Europe Oceania Mid East Eastern Asia Western Europe |
Company Certifications | ISO 9001:2000 |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | ningbo,shanghai |
Export Percentage | 81% - 90% |
No.of Employees in Trade Department | 3-5 People |
Language Spoken: | English, Chinese |
b) Factory Information | |
Factory Size: | 3,000-5,000 square meters |
No. of Production Lines | 5 |
Contract Manufacturing | OEM Service Offered Buyer Label Offered |
Product Price Range | High and/or Average |
Send your message to us
Cable Tie with High Quality and Releasable Price
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1000 Pieces m
- Supply Capability:
- 100000 Bags per Week m/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches