Marker Ties
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 2000 Pieces pc
- Supply Capability:
- 60000 Pieces per Day pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
#UL, GL, ABS, Lloyd's Register approved product.
#Min. loop tensile strength:114kg (250 lbs)
#High tensile strength cable ties.
#Extra heavy duty ties for application where higher tensile strength is required.
#One-piece construction for consistent performance and reliability.
#Lowest threading force of any one-piece cable tie in the industry.
#Recognition/ certification: UL, ABS, Lloyd's Register, GL
#RoHS compliant. Halogen free material.
#Material: Polyamide 6,6, UL94 V2
#Color: All colors are available
- Q: Air source heat pump water heater how to install
- according to the TV remote control to the source of the source key;
- Q: How to properly remove air conditioning in the absence of electricity
- 1. Fluoride: then the external machine of the high-pressure valve (thin tube) with a hexagonal wrench, closed, about 1-2 minutes after the closure of low-pressure pipe (thick tube). 2. Remove the pipe: with a movable wrench to high and low pressure pipe copper screw unscrewed. 3. Remove the internal and external cables. Open a plastic cover outside the machine, cable terminal can be seen, with a screwdriver screw off, remove the cable. (Do the mark, so as to avoid the next installation to line) 4. The machine (hang up) off, attached to the pipeline out. (Note: If you do not install a long time, also need to transport, it is best to tie in the pipeline on the cable removed, find the pipe and the machine's connecting nut, with two wrenches, And then the pipe plate is good) 5. Remove the wall of the machine hanging plate. (Hang up) 6. Remove the external machine, with two wrenches, the external machine 4 feet screw off, if the rust die also use the grinding machine to wear off the foot screw
- Q: How can the tape of this tie open? I cut it with scissors
- The general practice is to use flat steel in the bridge through the long ground. Reason: According to the requirements of the specification, the bridge is not less than two points and the ground connection reliable connection, in order to ensure the reliability of grounding, the conventional practice is to lay a long flat steel in the bridge. This requirement is regardless of the ordinary bridge or fire distribution with the fire bridge, are required to do. Supplementary reference: For example, "Code for construction and acceptance of grounding installations for electrical installations" GB-2006 Section 3.4.6: Laying of copper wires along the cable tray, galvanized flat steel and the use of metal structures along the bridge, such as When installing the metal components for the bracket as the grounding line, the cable bridge shall be grounded in accordance with the following provisions: 1 When the total length of the cable bridge is not more than 30m, it shall not be less than 2 connected with the grounding trunk. When the total length is more than 30m, Every 20m ~ 30m increase with the grounding point of the connection point; 3 cable bridge starting and end ends should be connected with the grounding network.
- Q: We bought the elevator dedicated cable, with video power wire, the customers say that they have done before the tie tie is not broken, is the elevator installation problem or they require bundled copper wire should not be used To tie There are several elevators that are now under the copper wire cut off more
- With a multimeter (or shake the table) to measure the insulation, not more than 0.5M Europe on nothing, as long as the insulation of the wire enough, PVC pipe is not used to waterproof, it is used to prevent mechanical trauma, even if not irrigation, buried A long time the tube also has water vapor, is inevitable, nothing!
- Q: Dual-value capacitor asynchronous motor starting up the speed is high and low What is the reason, the motor rotation just to the high speed suddenly down again more
- Generally strong electric wire is multiplied by the number of roots, such as BV-3 * 2.5 is required to multiply by . weak is almost no multiplication, such as RVS-2 * 1.5 is twisted pair does not need to multiply 2 of the two.
- Q: What are the precautions for using the cable mesh and how to use it?
- Cauldron but can not legitimate. Generally behind the TV has more than 2 way video / audio input interface, connected set-top boxes all the way, all the way to pick you up before a big pot on the line, but the cauldron to close the program Most digital intoxicated Fung-Holland Bong phthalocyanine Siegesbeckiae solitary ax Gurkha TV inside all included, did not make much sense
- Q: Elevator monitoring video line tied to the accompanying cable which side is good? How to determine which side of the cable is strong, there are different elevator brand approach is not the same? Such as Otis Elevator and Mitsubishi Elevator. Question added: online There are articles on both sides is not the same, while the high voltage interference is also large, but did not say how to identify more
- Part of the construction process requirements for reference Metal Trunking Wiring Installation Construction Technology 1 Scope This process standard applies to the installation of metal trunking wiring in buildings
- Q: Fiber optic cable line card number of stars
- Thousands of generations refers to the experience of a long time
- Q: Will the power cord wiring with what is called, how the insulation effect
- One is four 50 flat one is a 4 * 50
- Q: The police station asked to install a small hotel to monitor the camera, do not know how to choose the camera, you need to prepare what materials, cost about how much money?
- Fart, 1500 can buy a ghost, depends on how much you do, most of the door in the door line. All the lines in the room are going. Then in the way to determine the line pipe. Usually a group of air conditioning in the living room line. A group of green rooms. Kitchen a group of green. Bathroom a group of green. So the pipe is more. There are also money to do the hair, there are more money. The key is your own quality requirements. And I'm talking about spending the least reasonable way. How much pipe you can do to the number, about 5000 or so, the material.
1. Manufacturer Overview
Location | Taiwan |
Year Established | 1976 |
Annual Output Value | |
Main Markets | North America South America Eastern Europe Southeast Asia Africa Oceania Mid East Eastern Asia Western Europe Central America Northern Europe Southern Europe South Asia Domestic Market |
Company Certifications | ISO 9001:2008;ISO 14001:2004;ISO/TS 16949 |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | Laem Chebang/Thailand,Bangkok/Thailand,Donnguan/China |
Export Percentage | 91% - 100% |
No.of Employees in Trade Department | 21-50 People |
Language Spoken: | English, Chinese, Spanish, Japanese |
b) Factory Information | |
Factory Size: | |
No. of Production Lines | Above 10 |
Contract Manufacturing | OEM Service Offered Design Service Offered Buyer Label Offered |
Product Price Range | High and/or Average |
Send your message to us
Marker Ties
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 2000 Pieces pc
- Supply Capability:
- 60000 Pieces per Day pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords