Marker Ties
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 2000 Pieces pc
- Supply Capability:
- 60000 Pieces per Day pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
#UL, GL, ABS, Lloyd's Register approved product.
#Min. loop tensile strength:114kg (250 lbs)
#High tensile strength cable ties.
#Extra heavy duty ties for application where higher tensile strength is required.
#One-piece construction for consistent performance and reliability.
#Lowest threading force of any one-piece cable tie in the industry.
#Recognition/ certification: UL, ABS, Lloyd's Register, GL
#RoHS compliant. Halogen free material.
#Material: Polyamide 6,6, UL94 V2
#Color: All colors are available
- Q: In the elevator, on the installation of video lines and telephone lines to go and installation tutorials?
- Hello, thank you for choosing HP products. Trouble you to provide specific models I can help you lack of reminders of the United States to find you hope that the above reply can help you.
- Q: How to properly remove air conditioning in the absence of electricity
- 1. Fluoride: then the external machine of the high-pressure valve (thin tube) with a hexagonal wrench, closed, about 1-2 minutes after the closure of low-pressure pipe (thick tube). 2. Remove the pipe: with a movable wrench to high and low pressure pipe copper screw unscrewed. 3. Remove the internal and external cables. Open a plastic cover outside the machine, cable terminal can be seen, with a screwdriver screw off, remove the cable. (Do the mark, so as to avoid the next installation to line) 4. The machine (hang up) off, attached to the pipeline out. (Note: If you do not install a long time, also need to transport, it is best to tie in the pipeline on the cable removed, find the pipe and the machine's connecting nut, with two wrenches, And then the pipe plate is good) 5. Remove the wall of the machine hanging plate. (Hang up) 6. Remove the external machine, with two wrenches, the external machine 4 feet screw off, if the rust die also use the grinding machine to wear off the foot screw
- Q: The role of cable connector box classification installation requirements
- Although electricity and power generation are all power lines, they can be seen as two different systems. Therefore, when laying the cable, if the laying of the cable from the same bridge, the partition will be separated from the cable for future maintenance and maintenance. The The requirements of the partition depends on the depth of your bridge, the partition placed in the bridge, the bridge as high or slightly lower, if higher than the frame of the frame, affecting the beautiful, detailed provisions There is no ready-made plaintext.
- Q: Gehua cable TV antenna, that is, home that root plug set-top box behind the TV antenna is particularly long, I put the coil up with a cable fixed a bit, will not affect the TV signal? More
- To see if it is load-bearing walls, if it is load-bearing walls, is not allowed to tick the embedded pipe, if it is filled wall, there is no relationship, the general trunking for the diameter of 15-40mm, wall thickness of 100-240mm; problem. Usually in the good after 7 days can be a good.
- Q: The use of composite heat - shrink tape
- one end of the heat shrink tape adhesive surface heating, according to 1/2 lap winding shrinkage, while the side of the heating side of the heating shrinkage; or winding finished and then the overall heating shrinkage (note the heating , the beginning of the winding, the front should be overlapping two layers; you can use the fire (or electric gun) for heating, to the edge of the plastic surface can be exposed; contraction of the same side of the winding two layers, with a tie or wire fixed; After the completion of the tie or wire can be removed Long garden of the world
- Q: Elevator monitoring video line tied to the accompanying cable which side is good? How to determine which side of the cable is strong, there are different elevator brand approach is not the same? Such as Otis Elevator and Mitsubishi Elevator. Question added: online There are articles on both sides is not the same, while the high voltage interference is also large, but did not say how to identify more
- You do with the shielded cable to do the video line, do the corresponding grounding, should not have much interference.
- Q: Fiber optic cable line card number of stars
- Thousands of generations refers to the experience of a long time
- Q: Will the power cord wiring with what is called, how the insulation effect
- One is four 50 flat one is a 4 * 50
- Q: Hello, may I ask, what norms do you have on the shelf?
- Look at the cable diameter, casing diameter to take the cable diameter of 1.5 times it This is not a certain rule, but 1.5 times in many reference books are mentioned.
- Q: The police station asked to install a small hotel to monitor the camera, do not know how to choose the camera, you need to prepare what materials, cost about how much money?
- Choose the general in the camera probably more than 100 dollars can be materials: camera, cable, tape, hammer, transmitter, pliers, hard disk recorders general hard disk recorders 500 dollars labor costs according to the number of installed the number of different cameras!
1. Manufacturer Overview
Location | Taiwan |
Year Established | 1976 |
Annual Output Value | |
Main Markets | North America South America Eastern Europe Southeast Asia Africa Oceania Mid East Eastern Asia Western Europe Central America Northern Europe Southern Europe South Asia Domestic Market |
Company Certifications | ISO 9001:2008;ISO 14001:2004;ISO/TS 16949 |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | Laem Chebang/Thailand,Bangkok/Thailand,Donnguan/China |
Export Percentage | 91% - 100% |
No.of Employees in Trade Department | 21-50 People |
Language Spoken: | English, Chinese, Spanish, Japanese |
b) Factory Information | |
Factory Size: | |
No. of Production Lines | Above 10 |
Contract Manufacturing | OEM Service Offered Design Service Offered Buyer Label Offered |
Product Price Range | High and/or Average |
Send your message to us
Marker Ties
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 2000 Pieces pc
- Supply Capability:
- 60000 Pieces per Day pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords