Wire Collect Cable Ties
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1000 Pieces pc
- Supply Capability:
- 50000 Pieces per Day pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1.L-preformed tie shape helps strapped object closer attach to fixing point, minimizing the space taken.
2.Outside serrated design ensures not causing damages to the bundle surface, especially in vibration environments.
3.Low insertion force is required.
4.Extra extended pawl helps release the ties quicker and easier while operating in restricted space of automobile.
5.Releasable design is ideal for the occasion where reinstallation is required.
6.Added width of cable tie offered a more secure fixing that the firm fasten is asked for.
7.Special specifications supplied by customers' order.
8.Material: Polyamide 6,6, UL94 V2
9.Color: Black
- Q: The role of cable connector box classification installation requirements
- Should be the power cable and weak cable directly on the side, the middle partition separated. Standard: JB / T-2000 Standard Name: Electric Control Power Distribution Cable Tray Standard Status: Current Implementation Date: 2000-12-1 Issuing Department: National Electrical Appliances Accessories Standard Committee Content: This standard provides for electric control distribution The definition of cable bridge, model code, requirements, test methods, inspection rules, signs, transport and storage. Source:
- Q: I got the machine, and then removed, there is a section of the tube was bent, and that position really need to fold before, because there is a turn, but now that place too hard, and completely unreasonable that he is normal Of the time, because the demolition of a little time will be folded, do not know that they may be deliberately? And then to add money, encounter this situation usually how to do more
- Single-core cable line grounding line commonly used grounding 1. shield one end directly grounded, the other end through the protective layer to protect the ground: When the line length of 500 --- 700m and below, the shield can be used directly to one end of the ground (cable terminal Position ground), the other end through the protective cover to ground. 2. shield the midpoint of the ground: When the line length of 1000 ---- 1400m, the use of midpoint grounding. in the middle of the line position, the shield directly grounded, the cable ends of the shield through the protective cover to ground. The middle ground is usually required to install a straight connector. Install an insulated connector at the midpoint of the line. The insulated connector disconnects the cable shield, and the shield is grounded through the protective cover, and the two cables are shielded and grounded directly. 3. Shielded cross-connect cable lines are very long (1000 --- 1400m above), you can use shield cross-connect. This method is divided into three equal parts of the length of the three or three times the number of segments, each section between the installation of insulation joints, insulation joints between the three-phase shield with a coaxial cable, cross-linked box for transposition, cross The interconnection box is provided with a set of protective protector, and the two sets of insulated connectors are arranged on the line.
- Q: Ordinary air conditioning louvers, one square meter of louver aluminum consumption is good?
- High-performance capture cards typically have a composite video interface and an S-Video interface
- Q: How about the vertical installation of the bridge, cable, What fixed? It is best to look at the fixed pieces of pictures, thank you more
- The building has a dedicated atlas, and you can view the local. The vertically mounted bridge, the large cable in the bridge has a dedicated fixed clip (usually installed in advance), small cable can be directly tied, and the vertical installation of the bridge is also dedicated (Internal for a fixed cross).
- Q: Gehua cable TV antenna, that is, home that root plug set-top box behind the TV antenna is particularly long, I put the coil up with a cable fixed a bit, will not affect the TV signal? More
- Do you mean that the satellite signal is received by the audio and video cable connected to the TV? Then you only need to press the TV on the AV / TV to switch the TV to the normal AV signal channel can be used to change the satellite receiver or to buy a universal remote control board can be a
- Q: The elevator has 23 floors. But I have not installed before. I would like to ask how to install. How does the video line go? Thank you more
- Wire selection of the best, the best use of elevator dedicated line or 8 minutes signal line, many people think that the reason why the main purpose of this wire is anti-interference, in fact, there is an important reason is that the wire often in motion, What is the core? The installation of dedicated elevator cameras often have openings, a lot of people are very difficult things Oh, and some high-end elevator openings are not good, the material is very hard, and often there are several layers of material, the hole size to master, small We can expand, big on the trouble; pay attention to anti-interference. When the elevator starts, the surge is very scary. And the camera is not much relationship, and your construction level and the relationship between the wire; installation time and the elevator workers must be, this is still more dangerous. Not only the construction workers are dangerous, there may be endangering others. There was a building in the elevator monitoring, elevator workers to stop the elevator, the construction staff in the work, but do not know why, the top of the elevator door opened, there is a buddy did not see, directly into the elevator inside, Empty; with the cable that deal with the best, and the old elevator more exchanges about. Remember not to take the elevator from the top of the elevator overhaul the power supply, infuriated infinity. Do not waste the wire bar. There is a small skill of negotiation. Elevator inside the monitoring is difficult to effect, and must be clear in advance and Party A, do not let Party have a high expectations, this small area of ??the screen feeling certainly no outdoor large area of ??the effect of space to be faster.
- Q: Dual-value capacitor asynchronous motor starting up the speed is high and low What is the reason, the motor rotation just to the high speed suddenly down again more
- My professional is to do this, but depends on your TV there is no audio output, it is very simple to use two sets of lines, do not control what is HDMI or color or video, respectively, connected to the TV. And then use the TV AV / TV to choose just like the protection of the pole pole pepper locust Ge Wei Gonglian, if the TV sound to the sound, first look at the TV output. If there is connected to the amplifier. Not on the set-top box assigned to the amplifier "answer is completed
- Q: What are the maintenance knowledge of the manipulator?
- 2: Robot cycle The robot manipulates the work by listening to any abnormal sound, such as howling, clicking, etc
- Q: The use of composite heat - shrink tape
- one end of the heat shrink tape adhesive surface heating, according to 1/2 lap winding shrinkage, while the side of the heating side of the heating shrinkage; or winding finished and then the overall heating shrinkage (note the heating , the beginning of the winding, the front should be overlapping two layers; you can use the fire (or electric gun) for heating, to the edge of the plastic surface can be exposed; contraction of the same side of the winding two layers, with a tie or wire fixed; After the completion of the tie or wire can be removed Long garden of the world
- Q: Will the power cord wiring with what is called, how the insulation effect
- There is no difference between BTTZ25 square can only do single core
1. Manufacturer Overview
Location | Taiwan |
Year Established | 1976 |
Annual Output Value | |
Main Markets | North America South America Eastern Europe Southeast Asia Africa Oceania Mid East Eastern Asia Western Europe Central America Northern Europe Southern Europe South Asia Domestic Market |
Company Certifications | ISO 9001:2008;ISO 14001:2004;ISO/TS 16949 |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | Laem Chebang/Thailand,Bangkok/Thailand,Donnguan/China |
Export Percentage | 91% - 100% |
No.of Employees in Trade Department | 21-50 People |
Language Spoken: | English, Chinese, Spanish, Japanese |
b) Factory Information | |
Factory Size: | |
No. of Production Lines | Above 10 |
Contract Manufacturing | OEM Service Offered Design Service Offered Buyer Label Offered |
Product Price Range | High and/or Average |
Send your message to us
Wire Collect Cable Ties
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1000 Pieces pc
- Supply Capability:
- 50000 Pieces per Day pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords