• Dooer Frame Scaffolding  with Different Color System 1
  • Dooer Frame Scaffolding  with Different Color System 2
Dooer Frame Scaffolding  with Different Color

Dooer Frame Scaffolding with Different Color

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
10000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Painted H Frame Scaffolding Size Hight quality


1.Description 

As a high quality range of Scaffolding Frames-Standard H Frame is being offered to the clients in different specifications. These products have rigid welded frame of horizontal and vertical pipes. These pipes are interconnected by scissor type cross bracings by the help of pins and spring clips.

  

2. Main Features of Frame Scaffolding

1) light duty, easy to erect and walk through, wide appciations for both inside and outside constructions.

2) A complete set of  frame system scaffolding  usually include 2 pcs of H frames ,2 pairs of cross braces and 4 pcs of joint pins.

3) for inside concrete supporting which can be used with the U Jack to supporting the concrete slab.

4) a type of mobile scaffolding that you can install caster wheels at the bottom of frame scaffold ,then frame scaffolding is moveable.

5) can be used for the building decoration which is the light duty scaffolding, it is more easier for moving.

6) dip painted which means that the inside of the frame scaffolding can be painted to against anti-rustiness


3.Product pictures: 


Dooer Frame Scaffolding  with Different Color

Dooer Frame Scaffolding  with Different Color

4.Product Description

Dooer Frame Scaffolding  with Different Color

 

 5.   Packaging & Delivery

Packaging Detail:

Frame system scaffolding package in the container, or according to your requested

Delivery Detail:


10-15 days after deposit received.


 

Q: What are the dangers of scaffolding
(5) the improper operation of the accident collision accident, etc.)Analysis of the main reasons two accidents:1) whole frame dumping, vertical collapse or local collapse frameStructural defects: the structure of the lack of the necessary structural members, not in accordance with the provisions of the number and requirements of the erection of the wall, etc.;In the process of using the arbitrary demolition essential bars and even wall pieces etc.;
Q: How to set up the temporary structure of the external structure of the balcony on the two structure
Main projectCast - in - place main beam, board, column, stair - prefabricated board is installed - brick wall - door window hole is reserved, water and electricity Guan Xianyu is buried.
Q: Calculation method of complete scaffold
No matter where we are, we all have time to go with us. It's an eternal departure
Q: Scaffolding installation process, construction preparation
Construction preparation(1): steel pipe should be consistent with current national standard "carbon structural steel" (GB/T700) regulations Q235- grade steel; new steel pipe should be the product quality certificate; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth, pipe diameter deviation not more than -0.5mm, the wall thickness deviation not greater than -0.5mm, cutting slope deviation not greater than 1.7mm, the steel surface should be brushed with antirust paint; old steel corrosion depth not greater than 0.5mm, more than the prescribed steel shall not be used.(2): buckle made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; old buckle inspect before use, shall not have cracks, deformation, bolt appear smooth silk must be replaced; new and old fastener must brush good antirust paint.(3) foot board: the use of 4m long wooden foot board; foot width of not less than 200mm, the thickness is not less than 50mm, both ends should be set with a diameter of 4mm galvanized steel hoop two; rotten feet can not be used.(4) safety net, paint.(5) after the inspection and acceptance of the above parts have been classified and piled up in a neat and orderly manner, no water can be accumulated.2, scaffolding erection and removal(1) scaffold erection
Q: Fastener type steel pipe scaffold composed of two components? What are the roles?
2.1 divide the material according to the bar1) single specification steel pipe scaffold. It only uses a steel pipe specifications, such as steel tubular scaffolding, welded steel pipe using only 48 * 3.5.2) a variety of specifications of steel pipe scaffolding. The utility model is composed of two or more steel pipes of different specifications, such as a door type scaffold.3) steel tubular scaffolding. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding and so on.
Q: Im 18 years old and maleI have 4 piercings. On my left I have my lobe and a double helix (a type of cartilage piercing). On my right I have a scaffold/industrial. I know I want another piercing on my right ear, but cant decide what to get. Any input is greatly appreciated.
conch would look great and not make it look to cluttered go for it :)
Q: For indoor use of mobile scaffolding safety construction plan! Four support points with four pulleys with brake!The construction scheme of scaffolding safety belt for indoor high Jiqiu braking pulley, for about 12 meters of buildings, indoor emergency please heroes!
Wall point setWhen the height is not less than 6.0m, you must set the uniform distribution of wall, its setting should meet the following requirements:Door type steel pipe scaffold: when height is less than or equal to 20m, less than 50m2 of a wall, and even the vertical spacing wall point should be less than or equal to 6m; when the frame of high >20m, not less than 30 M2 a point, and even the vertical spacing wall point should be less than 4m.The other floor (or bottom bracket) scaffolding frame: when high than 20m, a point of not less than 40m2, and even the vertical spacing wall point should be less than or equal to 6m; when the high frame >20m, a point of not less than 30m2, and even the vertical spacing wall point should be less than 4m.The free height of the upper wall of the scaffold is not more than 6m.
Q: 21M high full scaffold erection scheme
dismantle4.1 the accurate preparation before dismantling the scaffold shall comply with the following requirements:1 should be a comprehensive inspection of the scaffold fastener connection, even wall pieces, support system is in line with the requirements of the structure;
Q: Any advise on nerves? I have 11 piercings but I'm still terrified of needles! Any tips on keeping my cool?
Tip: don't have it done.
Q: Specific requirements, the civil code is what ah! Thank you very much, I am lack of this kind of information, I hope you can tell me which of the following
The surface of the steel pipe shall be smooth and free of cracks, scars, delamination, dislocation, hard bending, burrs, indentation and deep scratches.The outer diameter of steel pipe 48mm allowable deviation is 0.5mm; the thickness of the wall 3.5mm allowable deviation of.0.5mm; steel pipe surface cutting oblique deviation 1.7mm;Dressing should be checked once a year. When the examination, should be in serious pipe corrosion in the selected three roots in each part of the serious corrosion of transverse sampling inspection, the outer surface of the steel pipe corrosion depth allowable deviation is less than 0.5mm, more than the provisions shall not be used.All new and old steel pipes must be painted with anti rust paint.