• Cuplock Scaffold Parts china supplier Rizhao Factory System 1
  • Cuplock Scaffold Parts china supplier Rizhao Factory System 2
  • Cuplock Scaffold Parts china supplier Rizhao Factory System 3
  • Cuplock Scaffold Parts china supplier Rizhao Factory System 4
  • Cuplock Scaffold Parts china supplier Rizhao Factory System 5
  • Cuplock Scaffold Parts china supplier Rizhao Factory System 6
Cuplock Scaffold Parts china supplier Rizhao Factory

Cuplock Scaffold Parts china supplier Rizhao Factory

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1000 pc
Supply Capability:
1000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 Cuplock Scaffold Parts china supplier Rizhao Factory

 

1)Material: Q345 

2)Surface treatment: hot dip galvanized 

3)Tube size: 48.3mm *3.25mm

4)manufacturer

 

 

Feature of Cuplock Scaffolding:

 

 

1)Highest quality -never use any equipment that is damaged or deteriorated in any way

2)Safety -inspect all equipment before using

3)Competitive price - factory suppler direct

4)We have strong engineering team that can give best solution for your project

5)Cutting -Edge product development

 

Consult your scaffolding supplier when in doubt-scaffolding is his business .Never take chances

Our firm belief that our customer's success are the only guarantee of our success .


 

 

 

Name

 

    Cuplock Scaffold Parts china supplier Rizhao Factory

Place of Origin

Shandong, China

Main Material

Q345

Surface Treatment

Electric Galvanized, Hot Dip Galvanized, Painted.

Certificate

EN74

Service

OEM Service available

MOQ

1000pcs

Payment

L/C,T/T

Delivery Time

About 20-30 days after confirmation

Packing

In bulk or steel pallet or as your request

Production capability

15 containers/month

 

 





OEM severice avalible

1)our ability to customized production to meet customer's specifications and requirements

2)our focus on building deep long-lasting relationship with our customers 

3)our commitment to meet customers needs  

Quality comes first ,customers are the highest ,operate with honest



Quality Control

Recognizing that quality control is a key factor that determines success in overseas markets, our factory uses state-of-the-art facilities to ensure products meet the standards in the United States and European countries.

All products are manufactured under stringent in - house quality control plansAll products strict quality inspection, all the raw materials are inspected before use, the product must be tested before leaving the factory.


Packing 


In steel pallet



Q: Erection of scaffolding accessories
Scaffolding is the door frame, a cross support, connecting rods, hanging button scaffold or horizontal frame, etc. the basic structure of the lock arm, and then set the horizontal reinforcing bar, scissors, sweeping rod, sealing rod, bracket and the base, and the use of a standard wall connecting piece is connected with the main structure of the building standard steel pipe scaffold. Steel pipe scaffold can not only be used as an external scaffold, but also can be used as scaffolding or full scaffolding.
Q: How to calculate the rental price of portal scaffolding
Under normal circumstances, the small local rental price: 2.5-3.0 yuan / set / day
Q: Mobile scaffolding accessories prices
The price of each region is different, are you renting or buying?
Q: Want to rent the scaffolding in the county, you need to cast how much money
Look what you want to do. Store rent is not.
Q: So I had a scaffold/industrial done about 10 weeks ago, and its been infected at the top hole only for about 3/4 weeks. It has like a little bubble near the hole and sometimes its filled with pus a little bit and sometimes its not. Well I went the doctors about 2 weeks ago and he prescribed me a weeks worth of antibiotics as well as anti-septic cream. So I took the pills for a week and it was clearing up, I was also applying the cream twice a day. But then yesterday I noticed the lump has gotten a little bit bigger. I don't know what to do, should I take it out? But I really don't want to. And plus the doc said to wait up to 3 weeks and if nothings changed to go back and take it out. If I continue to use the cream, will it eventually go? Thanks :)
If so, its hypertrohic scarring, a common occurence in cartilaginous piercings caused by too much jewelry movement/improperly fitted jewelry. It can be treated by applying tea tree oil to the bump once or twice a day.
Q: Find the demolishing scheme of scaffold
Removal methodThe development of the demolition plan, the program should include the removal of the steps and methods, safety measures, etc.. Demolition order should be observed from top to bottom, the first after the demolition, after taking the first demolition principle. That is, first remove the railings, scaffolding, scissors support, diagonal bracing, and then small beams, large cross bars, vertical poles, etc., and according to the principle of one step clear in order to be prohibited from top to bottom at the same time the demolition work. Remove the shelf of the high-altitude personnel should wear safety helmet, safety belt, wear soft shoes on the shelf, at the same time, around the railing or set up a warning sign and a special command, in order to avoid casualties.
Q: would a scaffold piercing look gay on a guy?
Not gay at all. Plenty of guys have it done.
Q: i had my scaffold piercing done in the summer holidays and wen i went back to school (currently in my last year) they told me to take it out so i had to go back to the piercer. They changed the bar to two clear retainers in the holes so they wouldn't heal, now it hurts all the time and is red with a bubble on the top of my ear, any suggestions as to what i should do? :/
regularly clean it with salty lukewarm water and cover it up with tape
Q: why scaffold need for inspected within the preceding 7 days and after adverse weather condition?
It is a work safety issue. Past experience has shown that scaffolding sometimes gets modified by unqualified people (or weather) resulting in injury or death.
Q: Who knows how much the amount of the main material used to take one square metre of conventional double row scaffolding (within 12 meters). For example, how many kilograms of steel pipe, the number of fasteners. The content of the quota is low, I am also very confused, to the completion of the work of the scaffolding rental fees. Very urgent, I hope to know the user to answer. Accident report
The following is a quote fragment: who knows how to use a square meter of the main raw material of double row scaffolding

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords