• Door Frame Scaffolding with Different Color System 1
  • Door Frame Scaffolding with Different Color System 2
  • Door Frame Scaffolding with Different Color System 3
  • Door Frame Scaffolding with Different Color System 4
  • Door Frame Scaffolding with Different Color System 5
  • Door Frame Scaffolding with Different Color System 6
Door Frame Scaffolding with Different Color

Door Frame Scaffolding with Different Color

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
10000 kg
Supply Capability:
10000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Structure of H Frame ScaffoldingDescription 

As a high quality range of Scaffolding Frames-Standard H Frame is being offered to the clients in different specifications. These products have rigid welded frame of horizontal and vertical pipes. Further, these pipes are interconnected by scissor type cross bracings by the help of pins and spring clips.

 

Packaging & Delivery

Packaging Detail:

Frame system scaffolding package in the container, or according to your requested

Delivery Detail:

after deposit 10-15 days

 

2. Main Features of Frame Scaffolding

1) Frame system scaffolding is light duty, easy to erect and walk through, wide appciations for both inside and outside constructions.

2)A complete set of  frame system scaffolding  usually include 2 pcs of H frames ,2 pairs of cross braces and 4 pcs of joint pins.

3) Frame system scaffolding  is for inside concrete supporting which can be used with the U Jack to supporting the concrete slab.

3.Frame Scaffolding product pictures:

 

Door Frame Scaffolding with Different ColorDoor Frame Scaffolding with Different ColorDoor Frame Scaffolding with Different Color

 

 5.FAQ

 

Presented like a shape of doorFrame-connected Scaffolding includes main framehorizontal framecross bracestage board and adjustable base. In order to display frame with coupler system enough,good performance of stability,firm structure of the whole,easy and fast to assemble and dismantle without any tools,safe working at height especially, and it is ideal material for construction engineering.

 

 We have organized several common questions for our clientsmay help you sincerely

1How about your company?

CNBM International Corporation, China National Building Materials (Group) Corporation, is one of the largest companies in China building material & equipment industry, Our formwork and scaffolding are largely used in both domestic and all over world; We has over 10 year experience in scaffolding industry.

Q: Calculation method of complete scaffold
No matter where we are, we all have time to go with us. It's an eternal departure
Q: The latest JGJ130-2011 construction fastener type steel pipe scaffolding safety technical specifications, schedule A.0.2 what role, how to correctly use it?
Schedule A.0.2 role: the calculation of scaffolding, the need to calculate the bearing capacity of the scaffolding
Q: What does my earth science teacher mean when he says to do a powerpoint with Link Scaffolding,how d u do it?
Link Scaffolding = A search found no answer. - Ask teacher to clarify.
Q: Scaffolding scaffolding erection norms which requirements, who can say?
The construction load on the frame must be in accordance with the design requirementsAfter the first erection of the body, must be approved by the company's safety and technical departments, and the company's project safety officer after the visa can continueIn case of suspension frame, use more than one month, such as re started, the frame must pass the reinforcement, rod must be re tighten oil, can be usedBefore the building should be approved with the consent of the special construction plan, should be in accordance with the scheme requirements of embedded embedded parts of the main structure of the construction processFeet should be laid flat tile, and tied with wire fixed on the lower supporting steel pipe. Scaffold of the butt joint between the tile, the rest of the bearing rail spacing shall not be greater than 400~700 mm
Q: What are the requirements for acceptance of external scaffolding? Want to know before
5, the level should be closed: the first step, every step or two, covered with planks or hand foot fence, scaffolding to laying along the long, joints should be overlapped in the small bar, do not appear short board. And in between in the pole and the wall every four steps long laying safety bottom fence.
Q: Scaffolding Vertical Standard, Length: 3000mm, Part Number AS1001
Please okorder Type ‘Aluminum Scaffolding+supplier+your location’ into its ‘Search’ panel, and click on ‘Enter’. Several pages of site listings giving details and links of suppliers who offer Aluminum Scaffoldings in, or near, your locality will be presented to you. Contact them, one by one, and then choose the supplier who suits your specific needs best. Happy hunting !
Q: What are the common rules for calculating the amount of scaffolding works
General rules for the calculation of scaffolding:Masonry works (including building blocks) are higher than 1m when calculated by external scaffolding. Independent column height of less than 3.6m according to the core of the core of the circumference of the height of the calculation of the height of the project; the height of more than 3.6m of the column core circumference plus 3.6m multiplied by the actual height of the project to calculate the amount of masonry.
Q: Fastener type steel pipe scaffold composed of which components?
Reference to "construction safety of steel tubular scaffolding safety technical specifications" JGJ 130 - 2011, 8, page parts3.1 steel pipe3.1.1 scaffolding steel pipe should be used in the current national standard "straight welded steel pipe" GB/T13793 or "low pressure flowQ235 steel pipe for the welded steel pipe used for conveying body; the steel quality of the steel pipe shall be GB/T3091In accordance with the existing national standard "carbon structural steel" GB/T700 Q235 steel provisions.3.1.2 scaffolding steel pipe should be used 48.3 * 3.6. The maximum quality of each steel pipe shall not be greater than25.8kg.
Q: Okay so i have one cartilage piercing already.plan a) i just get a scaffold piercing using already the cartilage piercing i haveplan b) i get another cartilage piercing then just wait for a while get a straight titanium barbell and stick it in threw bothI also need help convincing my mom.Help Me Out Please Thnk You
the one you have needs to line up with the one you want, know what i mean. i imagine that most single cartilage piercings are not pointing the right direction to accommodate scaffolding.
Q: How does the second scaffold scene morally change Hester Prynne?
It is less about Hester because she has accepted her punishment. It is more about Dimmesdale.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords