Cup-lock Scaffolding with Super Degree Steel Grade
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 20000 pc
- Supply Capability:
- 3000000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1.Structure of Cup-lock Scaffolding Description:
Strong with 80 kN fresh concrete pressure per m2 allowed.
Economical due to longer service life and fewer parts.
Hire option given in selected regions.
Hot selling Cup-lock Scaffolding with low price.
The application of large areas formwork has greatly increased the construction efficiency and reduced the cost.
2.Main Features of Cup-lock Scaffolding:
Comperticative priceGood bearing capacity.
Stable& durable.
Easy to assemble or dismantle.
Best price cuplock scaffold.
Steel Tube ScaffoldSystem.
Cup-lock System Scaffold.
Steel Pipe.
Cup-lock Scaffold.
Packaging & Delivery:
Packaging Detail:Pallet
Delivery Detail: 20-30 days after order confirmed.
3.Cup-lock Scaffolding Images:
4.Cup-lock Scaffolding Specification:
The up cup has the screw friction and self-gravity, it could self-lock steady, this makes the ledger steady, the loading of the ledger could transfer to the standard through the down cup, even the up cup is loose, the ledger joint could connect with the standard steady. The main parts include the standard, ledger and brace, it is easy to assemble and disassemble, and also easy to storage, transfer and maintain.
Comperticative price
Good bearing capacity
Stable& durable
Easy to assemble or dismantle.
5.FAQ of Cup-lock Scaffolding:
What about of our after-sale services?
Response will be carried out in 24hours after receiving any complain or request.
Any formwork cost can be refund after order is confirmed. If the products are not based on the requirements, there will be the relevant compensations made for you. The base collar with rosette together with the height-adjustable base plate forms the scaffolding base. The vertical standard is then placed into the base collar for further construction.
- Q:How can teachers use scaffolding to support student learning of new knowledge?
- You need to relate new class knowledge to old knowledge, and also make learning materials for new activities highly structured, and gradually less structured as you move through the topic.
- Q:The scaffold is 18 m long. A 650-N box sits 3.0 m from the left end. What is the tension in each wire? left wire = 520 N; right wire = 130 N left wire = 640 N; right wire = 210 N left wire = 195 N; right wire = 975 N left wire = 295 N; right wire = 1000 N can someone show me how to do this please :)
- Lets call left wire T1, right = T2 T1 = (200 x 9) + (650 x 15) = 11550 11550 = 18T1 11550/18 = 641.67 N T2 = (200 x 9) + (650 x 3) = 3750 3750 = 18T2 3750/18 = 208.33 N left wire = 640 N; right wire = 210 N
- Q:So a week ago today I got my industrial pierced. The pain was what I expected and afterwards it was very sore (as expected) however a week later it is a still rather sore and swollen and (I hate to be disgusting) quite crusty with dried blood/yellow stuff. I clean it everyday with salt water solution but I was just wondering if this was normal or should I take the piercing out?
- I#x27;m pretty sure it#x27;s normal make sure you use the proper cleanser for your ear. And make sure to clean it out as often as the piercer said to.
- Q:i mostly need forest tho!
- Symbols In The Scarlet Letter
- Q:What are the specifications of the bowl fastener? What kind of
- Crossbar common specifications are: HG-60.HG-90.HG-120.HG-150Pole commonly used specifications are: LG-300.LG-240.LG-180.LG-150.LG-120.LG-90.LG-60
- Q:how will i clean it as its very tender to touch.. :(
- The best thing to use is sea salt soaks: Add 1/4 of a teaspoon of Sea salt (available in supermarkets) to a mug of kettle boiled water, mix and leave to cool slightly before applying it to the piercing. For this particular piercing it may be best to dip and soak your ear in the cup of solution and leave it there until the water cools. After this rinse away any excess salt, dry carefully, with a cotton bud gently remove any crusty bits and avoid touching it at all, especially with dirty hair/shampoo and conditioner etc. Do this twice a day for a few months after which you can cut down to doing it just once a day and just rinse it with the warm water in the shower.
- Q:A scaffold of mass 53 kg and length 6.5 m is supported in a horizontal position by a vertical cable at each end. A window washer of mass 80 kg stands at a point 1.7 m from one end.(a) What is the tension in the cable closer to the painter? _______________N(b) What is the tension in the cable further from the painter? _________________N
- Static Equilibrium: ΣTorques: 53g(3.5) + 80g(4.8) = T(6.5) {where T = ANS (a) (53)(9.8)(3.5) + (80)(9.8)(4.8) = 6.5T 1817.9 + 3763.2 = 6.5T 5581.1 = 6.5T T = 5581.1/6.5 = 859 N ANS (a) Total weight = (53 + 80)(9.8) = 1303 ANS (b) = 1303.4 - 858.6 = 444 n
- Q:A 60.0 kg painter is on a uniform 25 kg scaffold supported from above by ropes. There is a 4.0 ? kg pail of paint to one side. Can the painter walk safely to both ends of the scaffold? If not, which end(s) is dangerous, and how close to the end can he approach safely?
- If both ends of the scaffold are supported by ropes then there is no chance of the plank rotating. OHS would still complain about the lack of handrails, the fact that the plank can swing without stabilization. Not to mention that ropes are unacceptable. They should be Nylon woven tape with fixed ends and at very least a one tonne rating. However that is not the thrust of your question. If the ropes are NOT at the very ends then by passing the rope on the end which has the 4 kg can of paint the whole plank may rotate about the pivot created by the rope. This will depend on where the two ropes are on the plank.
- Q:I would like to ask the bowl buckle scaffold operating layer is what?
- The difference between the role of the first, the first is the use of indoor or roof construction scaffolding, commonly known as the full house scaffolding, mainly to play a supporting role.
- Q:What is the previous version of the scaffold fastener (JGJ166-2008) for construction? That is, the implementation of the current version of JGJ166-2008 will soon be replaced by 2009.7.1 version.
- In addition, I did not hear that JGJ166-2008 has a new version of ah
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Cup-lock Scaffolding with Super Degree Steel Grade
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 20000 pc
- Supply Capability:
- 3000000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords