1. Introduction of Cup-lock Scaffolding:
Q235 steel cuplock scaffolding product type Q235 steel cuplock scaffolding tube diaeter 48mm tube thickness 3.0/3.25mm vertical tube length 600/1200/1800/2400, or OEM horizontal tube length 600/900/1200/1800, or OEM surface treatment painted, hot dip galvanized material steel material grade Q195, Q235,Q345.Hire option given in selected regions.Hot selling Cup-lock Scaffolding with low price.The application of large areas formwork has greatly increased the construction efficiency and reduced the cost.
2. Main Features of Cup-lock Scaffolding:
Model No: Scaffolding
Item No: Cup-lock Scaffolding
Material: Steel Q235,Q345
Size:Standard Size or OEM Size
Finished:Hot Dip Galvanized/Electroplate/Powder Coated
Produce Technology:Welding by robot
Certificate:SGS/EN12810
Delivery Time:30-35 Days After Confirmation
The up cup has the screw friction and self-gravity, it could self-lock steady, this makes the ledger steady, the loading of the ledger could transfer to the standard through the down cup, even the up cup is loose, the ledger joint could connect with the standard steady.
3. Cup-lock Scaffolding Images:
4. Cup-lock Scaffolding Specification:
Q235 Steel Cup-Lock Scaffolding
Material:Q235,Q345
Features:Welding by Robot
Surface:HDG,Galvanized,etc
Cert:SGS
Packaging Details:Cuplock Scaffolding Packing:
1) Normally scaffolding is loaded to containers in bulk in order to load as more as possible and save sea freight
2) If customer want to unload by forklift in order to save the labor cost, then we will pack the scaffolding in steel pallet or steel case
3) Other special requirements can be discussed by both
Delivery Detail:25-35 Days after Confirmation
5. FAQ of Cup-lock Scaffolding :
1)How to guarantee the quality of the products?
1. Cuplock scaffolding system life span could be 8 years if choosing hot dip galvanized as surface finishment, dip painting could be 4-6 years.
2. Cuplock scaffolding system is a tradtional system, safe and heavy duty. Comparing with other scaffolding systems, it is more suitable for heavy construction,such as bridge.
3. Mutifunction : Construction project, working platform, shipyard, bridge…
4.Cuplock scaffolding system is composed of Q235 steel tube. After reasonable mechanical design, the ringlock standard maximum capacity can be up to 250KN;
5.Quality: safe working, easy to assemble and heavy loading capacity.
6.Approved by ISO9001.
- Q: on a scale of 1-10
- Are you seriously asking that question?
- Q: Now there are many kinds of scaffolding market, like what wheel buckle scaffolding, scaffolding, scaffolding, what.
- Because the service life of Pankou scaffold in 20 ~ 30 years period between and no maintenance, and the service life of the bowl scaffold is only 7 years, but every year maintenance is very convenient. Nine for the group so we recommend you buy Pankou scaffolding.
- Q: Is there any other stores that are like Home Depot that sales building materials and scaffold?
- I do not know where you live, but we also have a Menard's and Lowes. They both sell building materials.
- Q: What are the advantages of rental scaffolding
- 2) assembly derrick; 3) the erection of ramps, sheds, and temporary structures stand 4) as the scaffold auxiliary reinforcing bar; erection requirements of steel fastener scaffolding should pay attention to the formation of a solid base plate and the base set by drainage measures to prevent water immersion on wall connecting rod set and load with the open type double scaffolding pole horizontal distance 1.05~1.55m masonry scaffolding step is like 1.20~1.35m or decorative masonry, decorative dual-purpose scaffolding like 1.80m pole vertical distance 1.2~2.0m which allows erection height of 34~50m single row set the pole horizontal distance 1.2~1.4 m pole vertical distance 1.5~2.0m allows erection height 24m longitudinal horizontal bar should be set inside the pole the degree for 3 span longitudinal rod with fastener fastener is connected with the lap fasteners should be staggered
- Q: What is the bowl buckle scaffold, bowl buckle scaffold what are the characteristics?
- The vertical rod is installed on the 48mm 3.5mm steel pipe with a certain length diameter of 0.6m x, and the welding rod is welded on the top. Vertical bearing bar for scaffold;
- Q: Mechanical model, stability, etc.
- (1) single row scaffolding (single row): only a row of pole end, horizontal bar on the scaffolding on the wall.(2) double row scaffolding (double frame): scaffold composed of inside and outside the two rows of the pole and the horizontal bar etc..(3) structural scaffolding: scaffolding for masonry and structural engineering operations.(4) decoration scaffolding: scaffolding for construction work.
- Q: I just got a scaffold piercing, Is there anything I can do to make it heal faster?
- your just gonna have to wait it out it takes 6-12 months to fully heal. use sea salt and warm water solution to keep it clean that will help it heal a little quicker! just be careful i got to close to a doorjamb and now mine has a bruise its scary looking lol
- Q: Steel pipe scaffolding scaffolding which components? Double row scaffolding and row spacing, step length, spacing and wall fixed spacing is generally much
- Bowl buckle steel pipe scaffolding when using steel pipe, as a "single steel pipe scaffolding"; when using the steel cross bar, for the "steel pipe based scaffold".2.2 according to the vertical and horizontal transmission force between the vertical and horizontal1) the frictional force acting on the contact surface. That is, the friction force at the contact surface of the joint is pressed to support the load of the cross bar and is transmitted to the vertical rod;2) welding force. Most of the cross bar and vertical rod socket connection is used in this way, the door frame is also this way;3) direct pressure transmission. This method is more common in the horizontal bar placed in the top of the scaffolding;4) shear force of pin. That is to say, the connecting rod and the hole of the vertical rod are connected by the pin rod through the vertical connecting plate of the transverse rod to realize the double side shear action of the connecting rod and the pin rod. This method is rarely seen in the connection between the rod and the vertical rod.
- Q: ok so i recently got a scaffold piercing and its not completely healed i have gym tomorrow and my gym teacher makes us take out our earrings i know he is gonna make me take out my scaffold bar but i cant its not healed or he will make me sit out until its healed i herd that it takes 1 year before it heals i cant miss gym the whole year! what should i do HELP PLEASEyours trulySelyGomy
- well i would cover it up if i were you.....leave ure hair down or something to make it less nnoticable
- Q: Cost of rent per day per month per ton of scaffolding
- , so it is difficult to make it clear here, to see where you are in which company rented
Send your message to us
Cup-lock Scaffolding with Q235 or Q345 High Grade Material
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 5000 pc
- Supply Capability:
- 3000000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches