• Crane TC7050 Construction Equipment Building Machinery Distributor Sales System 1
  • Crane TC7050 Construction Equipment Building Machinery Distributor Sales System 2
  • Crane TC7050 Construction Equipment Building Machinery Distributor Sales System 3
  • Crane TC7050 Construction Equipment Building Machinery Distributor Sales System 4
  • Crane TC7050 Construction Equipment Building Machinery Distributor Sales System 5
  • Crane TC7050 Construction Equipment Building Machinery Distributor Sales System 6
Crane TC7050 Construction Equipment Building Machinery Distributor Sales

Crane TC7050 Construction Equipment Building Machinery Distributor Sales

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Tower Crane TC7050 Description:

1.CMAX Tower Crane TC7050  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC7050 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC7050 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC7050  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC7050  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC7050 Parameter:

 Max. working range 70m, tip lifting weight 5T and Max. lifting weight 20T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50

Max height with attachment (m) 200

Working range can be adjusted (m) 50、55、60、65、70

Min working range (m) 2.5

Max lifting capacity (t) 20

Tip load @ 50m (t) 5


Tower Crane TC7050 Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC7050 Diagram:

Crane TC7050 Construction Equipment Building Machinery Distributor Sales

Crane TC7050 Construction Equipment Building Machinery Distributor Sales

Tower Crane TC7050 Technical Sheet:

Crane TC7050 Construction Equipment Building Machinery Distributor Sales

Tower Crane TC7050 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC7050 for example, the first two letters “TC” means Tower Crane, “70”means jib length is 70 meter, and the last two letter “50” means the tip load is :5 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Q:Basically what it says on top. Also provide maybe a video to prove it.
I think of myself greater because of the fact the paper plane sort.....going with the breeze and letting it take me the place it is going to. additionally, cranes are no longer very severe-high quality once you get too close to to them and could attempt to %. your face off in case you verify out them humorous.
Q:I think I'm going to try white crane kung fu. This is the club I'm going to which does three lessons in kung fu per week and 2 in sparring.The annual cost is ?40. It says it will take a minimum of 10 years to get a black sash.What are your views on this style? Is it effective and worth my time and does this club look good? Thanks
White Crane Kung Fu combines protection and assault and makes use of the two gentle and not basic power. It additionally emphasizes organization yet evasive footwork. that's an on the spot, linear and deceptive martial paintings. this actual device is named Fei He or Flying Crane. Flying Crane makes use of the two extreme and occasional kicks yet has a marked decision for speedy hand innovations. It stresses empty-hand as properly as weapons preparation, 2-person instruments, self-protection drills and loose-sparring.
Q:Which one is right? Are there two different kinds? This bird is confusing me.
Whooping crane, largest bird in North America, named so for its call.
Q:Do they need another crane to get the concerete blocks to the top? And how do they move the blocks from one end of the crane to another. This has been bothering me for some time so anyone who knows the answer I would love to hear it!
Construction cranes are erected on site. They are usually assembled on the ground with small cranes, then lift themselves up. The erection sequence is carefully figured, so minimal other equipment is needed. For conventional cranes that are permanent and thus only assembled once, portable cranes are used to erect them. Still, generally pretty much on the ground. Some have counterbalances that are permanently fixed, others have a rail type mechanism that moves in and out.
Q:Are there any standard requirements? If so, please show me some reference materials. Thank you, 20It's urgent, online, etc.. Thank youWould you please not write down the specifications? The specific methods of operation, with what materials are written on, thank you, good, you can add points
The main purpose is to prevent the main cable fixed tower crane tower crane cable weight lead cable pulled bad (insulation damage, core pulling) etc.,
Q:What were Henry's reasons for becoming a soldier? What about the war was so attractive to him?Why do you think it took Henry so long to begin contemplating his part in battle?How do Jim and Wilson respond to Henry's question? What does this tell you about them?Share your thoughts...
Henry begins the book as an idealistic and completely self-absorbed teenager who wants nothing more than a chance to show off and be thought of as a brave and daring male. From Shmoop
Q:I just wonder they use cranes at such heights, how do they carry the cranes at such height? Helicopter or something? This is a picture of what I'm talking
The cranes are jack-up cranes. They have their own self-contained jacks. As one floor is completed, they jack up to the next level. The cranes are on top of the buildings. They are designed by structural and mechanical engineers to loift a given weight.
Q:how do cranes get assembled ? on building sites?
By people.
Q:determine the maximum load the crane can support in kg if the bending moment on the beam is not to exceed 5000 Nm and the shear force is not to exceed 3KN when the crane is positioned at mid span
figure shear first Let F be the max. crane load. for a simply supported symmetric load, the reactions at each end support will be half the total load. The reaction loads will also equal the shear load. 3000 N = (F + 150(9.8))/2 F = 4530 N The maximum bending moment will be the shear force times the moment arm of half the joist length 5000 Nm = [(F + 150(9.8))/2] N (2.0 m) 5000 = F + 150(9.8) F = 3530 N The bending moment max load is 1000 N less than the Shear max load so bending is the limiting factor The maximum load allowed is F = 3530 N 3530 / 9.8 = 360 kg As a form of exchange, please remember to vote a Best Answer from your results.
Q:im doing and essay and i need help on what motivated him to write this poem. im in 9th grade
War Is Kind Stephen Crane

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords