Crane TC6016 Construction Equipment Building Sale Machinery Distributor Sales
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Tower Crane TC6016 Description:
1.CMAX Tower Crane TC6016 is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2. Tower Crane TC6016 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.
3. Tower Crane TC6016 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4.Tower Crane TC6016 has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on.
5.Tower Crane TC6016 has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.
Tower Crane TC6016 Parameter:
Max. working range 60m, tip lifting weight 1.6T and Max. lifting weight 10T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 50.5
Max height with attachment (m) 200
Working range can be adjusted (m) 48、54、60
Min working range (m) 2.5
Max lifting capacity (t) 10
Tip load @ 50m (t) 1.6
Tower Crane TC6016 Packaging & Delivery:
40HQ container
20~25days after deposit
Tower Crane TC6016 Diagram:
Tower Crane TC6016 Technical Sheet:
Tower Crane TC6016 FAQ:
1.What is tower crane?
Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.
2. What is the meaning of the tower crane’s code?
Take Tower Crane TC6016 for example, the first two letters “TC” means Tower Crane, “60”means jib length is 60 meter, and the last two letter “16” means the tip load is :1.6 ton.
3. What is the principal to quote the right tower crane to the client?
First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.
- Q: Tower crane railing height is greater than or equal to meters
- GB 6067 requires the height of the railings of the crane to be 1050mm, and a horizontal bar with a spacing of 350mm shall be provided. The bottom should be set at a height of not less than 70mm.
- Q: How often should the crane be inspected regularly?
- Tower cranes, elevators, mobile cranes 1 times a year, including rubber tyred container gantry crane every 2 years 1; small light lifting equipment, bridge crane, gantry crane, gantry crane, cable crane, crane mast, railway crane, jib crane, mechanical parking equipment every 2 years 1, the crane annual molten metal and hot metal 1.Rules for periodical inspection of lifting machineryArticle 1 These rules are formulated in accordance with the regulations on the supervision of special equipment safety and the regulations on the supervision of crane safety.Article second of the rules from the regular inspection of heavy machinery, is often used in hoisting machinery maintenance unit (hereinafter referred to as the foundation of the self inspection and maintenance), by the State Administration of Quality Supervision Inspection and Quarantine (hereinafter referred to as the State Quality Inspection Administration) special equipment inspection agency approved (hereinafter referred to as the inspection agency) according to the rules, to incorporate the use of registration in the inspection of crane.Article third these rules apply to lifting machinery within the scope stipulated in the regulations on safety supervision of special equipment. All the hoisting machines included in the catalogue of special equipment shall be inspected regularly."No" included in the catalogue of special equipment installation supervision and inspection and the implementation form of hoisting machinery factory, direct delivery unit, for use in pre registration by the local inspection agencies in accordance with the rules of the test items and their contents, requirements and methods for inspection of the equipment before using test (i.e., referred to as the first examination), qualified rear can be used for registration. For the first inspection of hoisting machinery, see Appendix A.
- Q: Is there a crane lifting chart where I can enter info. to determine what size crane I need, if so where?
- the 1st answerer, Irv S, is right. You need to call a craning service. They should be able to give an estimate for crane size based on what you tell them. You will need to know what your Load weighs. How high in the air the crane will have to lift it. ....Putting a swimming pool in the back yard is completely different ....than putting that same swimming pool up on top of a 15 story ....building. How close to the Load can the crane park? Or how far you need the LOAD moved. What a crane can lift, even if it a 100 ton crane is based on how far the crane has to reach to pick up the load and how much the crane has to rotate to place the load. The angle the crane boom goes to, etc. Our 15 ton PH crane can lift 30 thousand pounds at 10 feet from the Turning center. And only a 1,000 pounds or less if the boom is fully extended with the Jib on, that is 125 feet away from the turning center of the crane. Distance is critical! They will probably need to see the work site to give a really accurate answer. Wingman
- Q: the numbers i found on it are ay7648 ssh-310-nc
- Crane SSH-310-NC, hydraulic, rough idle, good midrange hp Intake Open-Close BTDC-ABDC 40-90 Exhaust Open-Close BBDC-ATDC 88-42 Degrees Advertised Duration Int. 310 Exh. 310 Degrees Duration @ .050 Cam Lift Int. 236 Exh. 236 Running Clearance Hot Int .000 Exh. .000 Gross Valve Lift Int. .485 Exh. .485 RPM Range min 3800 max 6800 valve float 7000
- Q: A. Designated operatorsB. All construction site personnelC. InspectorsD. All of the above
- Crane are extremely dangerous and complicated machinery , the operators need intensive education and training , they have to pass the required tests to be certified . Now even the signal guy on the ground who helps the crane operator needs to be certified . So your answer is A.
- Q: do they eat them or what??i hear about hunting them and i think cool but what do you do with them i mean do they tast good??
- I have never personally eaten a sand hill crane but those who have tell me that they are quite good table fare. Since they are considered a game animal, it would be illegal to do anything wiht them after killing except to eat all edible parts. It is against the law to waste any edible part of a game animal. Therefore, I would suppose that anyone who is hunting them is eating them, or possibly giving them to someone else to eat.
- Q: These cranes always stay higher than the construction process but I have never seen how they are extended to stay above all of it. They come in two formats, free standing and those attached to the building. The possibilities that I thought of was that maybe they use another crane to lift the housing and the horisontal arm to put in more modules into the vertical part; or that they extend it by some way by putting modules in at the top or bottom and that the crane has some self-lifting mechanism to accommodate the insertion of more modules. However, I have never seen this being done, nor does the construction of these cranes point to its ability to do so. The only other possibility that I could think of was that the crane is set up at the outset to be higher than the completed height of the building, hence there is no need to extend it but this does not explain how they do it for very high buildings where the crane is attached to the building and seems to grow higher with the building.
- The cranes are self erecting. The cranes tower is raised in sections. The lowest section is jacked up to the correct height and then a new section inserted and so on.
- Q: I was wondering how those guys/gals get up to their posts. Is there some type of elevator or do they climb up everyday? I'm talking about those big cranes on contruction sites. the huge ones.
- They climb a ladder up the middle of the central tower. I saw 'it' on the History Channel. .
- Q: crane signals?
- they are out there somewhere, and everywhere I have been they are the same
- Q: What do the words neck-craning and neck-straining mean in the sentence below?Sports cars are often designed to make a statement, and many of the newest models do that with neck-craning styling and neck-straining performance.
- 'Neck-craning' in this context I think means to crane your neck around to see all angles of the presumably beautiful styling. Neck-Straining in this context I imagine refers to the G-Force experienced from acceleration provided by the high-performance sports-car.
Send your message to us
Crane TC6016 Construction Equipment Building Sale Machinery Distributor Sales
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords