Tower Crane TC6016 Construction Equipment Building Machinery For Distributor Sales
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Tower Crane TC6016 Description:
1.CMAX Tower Crane TC6016 is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2. Tower Crane TC6016 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.
3. Tower Crane TC6016 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4.Tower Crane TC6016 has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on.
5.Tower Crane TC6016 has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.
Tower Crane TC6016 Parameter:
Max. working range 60m, tip lifting weight 1.6T and Max. lifting weight 10T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 50.5
Max height with attachment (m) 200
Working range can be adjusted (m) 48、54、60
Min working range (m) 2.5
Max lifting capacity (t) 10
Tip load @ 50m (t) 1.6
Tower Crane TC6016 Packaging & Delivery:
40HQ container
20~25days after deposit
Tower Crane TC6016 Diagram:
Tower Crane TC6016 Technical Sheet:
Tower Crane TC6016 FAQ:
1.What is tower crane?
Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.
2. What is the meaning of the tower crane’s code?
Take Tower Crane TC6016 for example, the first two letters “TC” means Tower Crane, “60”means jib length is 60 meter, and the last two letter “16” means the tip load is :1.6 ton.
3. What is the principal to quote the right tower crane to the client?
First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.
- Q:I used to buy a new tower crane that was attached to someone else's unit and (the key Gou Er). Now I have set up a company myself and bought a key, Gou Er. The question is, now how can I put it back from someone else's key dog and bring it back to my own dog?Know about the urgent urgent urgent urgent call to inform the mobile phone can ah ~ ~ ~ ~ ~ ~ thank you!
- Measures for the record and registration of construction hoisting machineryArticle 1 These measures are formulated in accordance with the provisions on the supervision and administration of the safety of construction cranes' machinery (Order No. 166th of the Ministry of construction) in order to strengthen the management of the record and registration of construction cranes.The construction and registration of the hoisting machinery as mentioned in the present Measures shall include the registration of the lifting machinery, the installation (disassembly), the notification and the use of the registration of the second.Third construction departments of the people's governments at or above the county level may use the computer information management system to handle the registration and registration of construction hoisting machinery, and establish a database.The construction administrative department of the local people's government at or above the county level shall provide the registration and registration and inquiry service of the building hoisting machinery within its administrative area.Article fourth rental, installation and use of units shall be submitted in accordance with the provisions of the lifting of construction machinery registration information, and the authenticity of the information provided by the responsible.The construction administrative department of the local people's government at or above the county level shall establish a system for the examination and registration of the hoisting machinery.Fifth construction machinery rental units or purchase building lifting units (hereinafter referred to as the "property units") in the construction machinery rental for the first time or before the installation, should be registered at the competent construction Department of the local people's governments at or above the county level to the unit of business (hereinafter referred to as the "equipment registration authority") for the record.
- Q:I read a book a year ago about sadako sasaki who tried to make all 1000 paper cranes to live. Do you have to keep saying your wish over again when your making them, and when you finished making all 1000 how long did you wait until your wish came true??
- you make your wish once your done cause you only get the wish if you have 1000 cranes right so saying your wish when you only have 6 won't do anything. it can come true the next day till the next year or ten years it not something definite. I've never made 1000 but I think I will.
- Q:the way u find them climbing with the building makes me wonder how they become this long and what is the mechanism for that
- The crane isn't growing. The cranes lift themselves up to the current top floor, build up around them, and repeat as necessary until they reach the top. The tallest cranes in the world are nowhere near as tall as the tallest skyscrapers - so the only mechanism to build very tall structures is to keep the cranes at the top of the building as it rises.
- Q:or is jason mraz just making up things for lyrics?
- Plenty of cranes are built on the shop floor and lifted in place....so no it doesn't take a crane to build a crane. There are cranes that need another crane and that is the the ones used in the center of new skyscrapers where they build a hoist on top of the building to add to the length of the main crane. So maybe that is the kind he is talking about
- Q:my friend is in the hospital with really bad burns
- A really long string. Or have I misunderstood the question?
- Q:How many tons of tower crane QTZ80A lifting?
- How many tons to see installation length of arm frame, different lifting amplitude of corresponding weight is not the same.
- Q:I would like to buy KATO crane and I have its serial number. I wonder how I can check with serial number if the crane is Originally Made in Japan! Which site should I go for checking? It will be great help if you answer my question.
- I Googled KATO cranes and found several sites. Im sure there is one that can lead you to contact information w/ the company. I happen to be a self proclaimed BEST hyd. crane operator in the states. having logged several years experience. IF you need an operator for hyd. or static line. achd73 at yahoo TonytheTiger
- Q:Like the tall cranes on construction sites. I mean, suddenly they're just magically there!
- no i haven't
- Q:How do Crane Motors Work?
- I'm not 100% familiar with this but this should be pretty close to the answer. Simple/standard crane motors work by applying power first through a rotating steel shaft into a gearbox. The gearbox allows the gearing ratio to be changed (to trade rotation speed for torque or torque for rotation speed). Another steel shaft carries the power out of the gearbox, again through rotation, to a spindle (think big thimble) around which steel cable is wrapped.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Tower Crane TC6016 Construction Equipment Building Machinery For Distributor Sales
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords