Crane TC5516 Construction Equipment Building Machinery
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Tower Crane TC5516 Description:
1.CMAX Tower Crane TC5516 is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2. Tower Crane TC5516 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.
3. Tower Crane TC5516 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4.Tower Crane TC5516 has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on.
5.Tower Crane TC5516 has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.
Tower Crane TC5516 Parameter:
Max. working range 55m, tip lifting weight 1.6T and Max. lifting weight 8T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 44
Max height with attachment (m) 150
Working range can be adjusted (m) 44、50、55
Min working range (m) 2.5
Max lifting capacity (t) 8
Tip load @ 50m (t) 1.6
Tower Crane TC5516 Packaging & Delivery:
40HQ container
20~25days after deposit
Tower Crane TC5516 Diagram:
Tower Crane TC5516 Technical Sheet:
Tower Crane TC5516 FAQ:
1.What is tower crane?
Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.
2. What is the meaning of the tower crane’s code?
Take Tower Crane TC5516 for example, the first two letters “TC” means Tower Crane, “55”means jib length is 55 meter, and the last two letter “16” means the tip load is :1.6 ton.
3. What is the principal to quote the right tower crane to the client?
First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.
- Q: They seem to be the tallest thing around, so what put them up?
- Large cranes are built in sections imagine like an erector set. When there is a large building to be built the crane arrives in smaller easier to manage pieces and assembled on site.
- Q: Ok, so I figured out that last step after watching an origami tutorial thing on youtube
- It okorder / The animations on this site are good, showing what you have to do, without hands in the way.
- Q: I caught this crane fly in my garage but is almost the size of a dragonfly. It has a 3 inch wingspan. I saved it in a jar because I though no one would believe me. so do they really get this big or is this thing a freak?
- Giant okorder /
- Q: How the cranes can stand without any tipping with huge counter weights on its back? If there is no suspended load also the crane is is still stable with huge counter weights on its back. How it can possible? Why crane is not offballencing while we adding extra counter weights on it without any suspended load?
- Usually the counterweights can move back and forth on an arm. They are moved toward the crane when there is no load and away from the crane when there is a load. If the counterweights can't move, then the crane must be designed to hold (at least) the minimum counterweights in their fixed location. As the crane gets loaded, the net moment decreases, and then increases in the other direction as more and more load gets added. It is still likely that the maximum design moment when loaded far exceeds the moment due to the counterweights on an unloaded crane.
- Q: Captain Kirk, TJ Hooker or Denny Crane?
- Denny Crane
- Q: Please give a scripted answer. Funniest Denny Crane comment and action gets the 10 points
- Did you just fart?
- Q: My understanding is that under Crane doctrine the tax basis of the property to begin with is Equity Invested + Financing (recourse or nonrecourse doesn't matter). i.e. 20K down + 80K purchase money mortgage = 100K. What if the property is appraised for only 80K right before purchase but purchaser paid 100K? Is the tax basis 80K or 100K.In other words, is the tax basis the actual assessed value of the property or is the tax basis the total investment?Thanks,Ben
- Your understanding of Crane is correct. For purposes of calculating the gain on sale, the basis would be $100k. What Crane really said was that the net proceeds would have to include any assumed debt, in addition to any cash received -- basically that you had to include the debt on both ends of the transaction if my reading is correct. (That jives with the example in Commissioner v Tufts et al, 81-1356 so I think we're correct on that.) Where basis gets interesting is when you are calculating depreciation. At least when you convert a residential property to business use -- i.e. a rental -- you use the LESSER of the cost basis (Crane) or the FMV on the date that the property is placed in business(rental) service. In your example, the depreciable basis would be $80k since that was the lower. For calculating the gain on sale, the cost basis would still be $100k (adjusted down for any depreciation allowed or allowable while in business use of course).
- Q: Construction tower crane driver (T) Ben can be used as construction crane driver (S)?
- Building crane driver (T); tower crane driverConstruction crane drivers (S); construction elevator drivers; neither is common.
- Q: Military Action movie with bunch of cranes at the end?
- Cranes like construction equipment or Cranes like the birds?
- Q: I've recently finished folding my 1000 paper cranes. I herd that there is a shrine in japan that takes them. Anybody know where that place is and the information I need to have to send them?
- The most common place to take them is the Hiroshima Peace Memorial Park. They have a monument dedicated to a girl who was affected by the bomb and died from cancer. Her name was Sadako and they have these glass cases that people from all over the world put their 1000 cranes in. Here's a link to their website... www.pcf.city.hiroshima.jp/index_e2.html You might have to call first...good luck!
Send your message to us
Crane TC5516 Construction Equipment Building Machinery
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords