Continuous Filament Nonwoven Geotextile
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Geo-textile is usually used for filtration, isolation, reinforcement or preservation, with the characteristics of high tensile
1. Hydraulic Engineering: Inverse filtering & protection in reservoir dam, earth rock cofferdam, tunnel, gutter way, etc; Protection for impervious layer in artificial lake, river-way, reservoir, etc;
2. Road Works: Drainage work in retaining wall, road side slope, roadbed, under-layer of railway & airfield runway
Density | Thickness | Breaking Strength | Elongation of Fracture | CBR Bursting Strength | Vertical Penetration Parameter | Equivalent Aperture |
g/m2 | mm | KN/m | % | KN | cm/s | O95mm |
65 | 1.2 | 2.8 | 40 ~ 80 | 0.7 | K x (10-1 ~ 10-3)
(K = 1.0 ~ 9.9) | 0.07 ~ 0.2 |
75 | 1.4 | 3.3 | 0.8 | |||
100 | 1.6 | 5.0 | 0.95 | |||
150 | 1.52 | 7.5 | 1.5 | |||
160 | 2.0 | 8.5 | 1.60 | |||
200 | 2.4 | 11 | 2.10 | |||
250 | 2.8 | 14 | 2.60 | |||
300 | 3.4 | 16 | 3.20 | |||
400 | 4.0 | 21 | 4.0 | |||
500 | 4.5 | 25 | 4.8 |
- Q: Can the cushion on the prefabricated board floor be dug?
- Surface layer without steel, do not bear the load, you can dig out But sometimes the prefabricated floor above the surface layer with steel, to bear the load, this can not be removed! To know how thick the cushion, in the local dig about In general, to do leveling layer, can not be directly laid tiles
- Q: When the cushion is used, the thickness of the protective layer is not less than ()
- The purpose of the protection, one is to avoid man-made mechanical damage; the second is to prevent climate, UV aging, to extend the service life; three in the planting roof protection layer is to prevent plant roots puncture, different effects using different methods of protection.
- Q: The top floor made waterproof playing cushion layer of how to do
- 2. repair the cracks well. After the cracks to be repaired are dry, start waterproofing.
- Q: Basement cushion waterproof
- First, the basement moisture treatment structure is usually: first in the basement wall outer surface wiping 20mm thick 1: 2 waterproof mortar, basement walls should be used cement mortar masonry, gray seam must be full; and in the basement floor and the first Floor floor is divided into two walls of the level of moisture-proof layer. The outer wall of the basement wall should be tampered with the soil with poor permeability.
- Q: Cushion, waterproof layer construction to do what information
- 4, waterproof layer set and standard construction methods: to be painted 2 to 3 times, or should be added fiberglass cloth, and each brushing the thickness of the cured material shall not be less than 1 mm, and should be completely dry (about 5 -8 hours) and then the next construction. After brushing, but also in the paint waterproof layer to do a mortar protective layer, and finally paste the tile.
- Q: What is the relationship between the cushion and the ring beam?
- Cushion is plain concrete or asphalt concrete (for groundwater soil corrosive strong site). Is located below the ground, in order to prevent the foundation or the concrete beam pouring when the excessive loss of water caused by defects set. The purpose is to ensure the quality of concrete, increase the durability of underground components
- Q: How to build a fine stone concrete cushion?
- Reduce ground cracking, plus steel mesh. Reinforced mesh, should be placed in the middle of the concrete, because the protective layer of concrete thick Fang generally only 5CM thickness, so the middle is the best.
- Q: Basement floor mattress dry to what degree can do coil waterproof?
- Third, the membrane waterproof in the construction should first do the basement floor of the waterproof, and then the membrane along the basement floor continuous paste to the outer surface of the wall. Basement floor waterproofing first in the foundation pouring C10 concrete cushion, the thickness of about 100mm. And then paste the membrane, and then in the coil to wear 20 thick 1: 3 cement mortar, and finally pouring reinforced concrete floor. The outer surface of the wall first wip 20mm thick 1: 3 cement mortar, cold base oil, and then paste the membrane, the membrane should be stitched paste, adjacent coil lap width of not less than 100mm. The top of the coil should be higher than the maximum water level of about 500mm, the outer side of the brick wall.
- Q: Why calculate the amount of time to count a lot of cushion ah
- In the building construction refers to the base is located below the cushion sometimes also served as grassroots. With the cushion, in the above work is convenient, clean, especially the mold, bar reinforced, pouring concrete and other processes, will not be affected by the basic earth pollution. Set the place where the cushion is generally based, floor, roof (slope) and so on.
- Q: Maintenance time of the cushion on the roof of the building
- According to the "concrete structure construction quality acceptance criteria" provides: Concrete should be poured within 12h after the completion of the concrete to be covered, and moisturizing conservation;
Send your message to us
Continuous Filament Nonwoven Geotextile
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords