• Tower Scaffolding for Formwork System System 1
  • Tower Scaffolding for Formwork System System 2
Tower Scaffolding for Formwork System

Tower Scaffolding for Formwork System

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Tower Scaffolding

Shoring tower is an effective supporting system. It is easy to assemble and dismantlement, and

has excellent stability and bearing capacity. It has been widely used in the construction of industry

& residential buildings , bridges, tunnels and dam project, etc.


Characteristics:

◆ High degree of standardization.

◆ Easy storage and transportation




Q:Seeking "industrial furnace masonry construction and acceptance of norms" GB-2004 electronic version, urgent use! If appropriate to add bonus points more
In order to carry out the safety of the production of civilized construction work, the safety of production accidents will be completely eliminated in the bud, especially the development of major dangerous sources of safety prevention and control measures
Q:What are the safety protection appliances, machinery and equipment, construction machinery and accessories for construction enterprises?
Construction of special types of work are: electrician, electric welder, shelf workers, tower crane driver, tower crane Division workers, tower crane signal workers, the documents required by the relevant departments for training.
Q:What are the special construction proposals for the construction project?
Combined with the latest cabinet products, the latest product trends to the muscle arc crown old Gui Guai some helium hamburgers, domestic and foreign cabinet market will be toward a more environmentally friendly, customization, style and other direction
Q:So high, how people are safe to enter into the way of what is more
Tower crane is the most significant tower crane center to the hook to reach the farthest distance, the specific is the car in the tower arm can run long distance. The working range of the tower crane is the radius of the tower crane, and the maximum distance from the crane to the center of rotation should meet the needs of the construction plane. The lifting height of the tower shall not be less than the total height of the building plus the height of the components, sling and safe operation (usually 2 to 3 m), and shall meet the scaffolding, derrick or other barrier material beyond the top of the building Generally not less than 1m) of the maximum beyond the height required. Tower crane in the minimum amplitude from the maximum weight, with the increase in the amplitude of the corresponding reduction in weight. Therefore, in a variety of amplitude are rated from the weight. Different amplitude and the corresponding weight together, can be drawn into a crane performance curve. Rated weight * distance from the center of the trolley = rated lifting moment. The balance of the general tower crane arm is greater than the maximum torque, the crane itself is a boom and balance arm unbalanced steel structure, this imbalance is based on the balance. Since the torque generated by the balance arm is large, that is, in the case of no hanging matter, plus the maximum wind load torque is the tower crane overturning moment. Rectangular basic check, the basic moment is the diagonal direction of the largest, in order to reinforcement. The maximum lifting torque is obtained without considering the wind load, theoretically, to achieve a very dangerous. The lifting weight of the tower crane should include the lifting material, spreader and rigging, etc. acting on the lifting crane hook crane all the weight. The lifting torque of the crane is generally controlled at 75% of its rated lifting torque to ensure safe operation and to extend its service life.
Q:What kind of special jobs are available at the construction site?
62-1 meet the requirements 2 trench may not be backfill with water, backfill should be dense Section 4
Q:What are the relevant laws and regulations for the filing of the attached scaffolding project above 150 meters? What is the specific name of the article? The More
Under the circumstances of the frame body, the floor type double row steel scaffolding
Q:There are several special construction projects in the construction project?
What is the exterior scaffolding erection specification? What do you need to pay attention to?
Q:Hello, can you send me an electronic version of the current building code? Thank you, email
A project floor-style double row scaffolding more than 30 meters, does not meet the specifications,
Q:What is the difference between the inside and outside of the car
The ambient temperature is low so the cooling mode does not start. Heating outside the machine first start, the machine delay start, and need to run for a while only hot air
Q:How is the tower crane on the site raised?
The roof of the color steel composite panels can be applied to the roof insulation layer of the fixed amount of conversion in the fixed amount of the main material; because the quota is different, you use the fixed quota in such a quota on the direct application of no use of similar quota conversion material

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords