Composite Geomembrane,One Geoxtetile One Film
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 m²
- Supply Capability:
- 300000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1.Structure of Composite Geomembrane Description:
Composite geomembrane (composite anti-seepage film) is divided into a cloth a membrane and two cloth film, 4-6 m wide, weighs 200-1500 g/m2, tensile and tearing resistance, bursting physical mechanics performance index is high, the product has high strength, good extension performance, large deformation modulus, acid and alkali, corrosion resistance, ageing resistance, good anti-seepage performance. Can satisfy the water conservancy, municipal, construction, subway, tunnel, the seepage control engineering construction crack, isolation, reinforcement, reinforcement and other civil engineering needs. Commonly used in dam seepage prevention and drainage ditches, and anti-fouling processing of scrap yard.
2.Main Features of Composite Geomembrane:
High strength, good extension performance, large deformation modulus.
Acid and alkali resistance, corrosion resistance, ageing resistance.
Good seepage control performance.
3.Specification of Composite Geomembrane:
Item | 20-15 | 30-22 | 40-28 | 50-35 |
Breaking strength at warp direction (kN/m) ≥ | 20 | 30 | 40 | 50 |
Breaking strength at weft direction (kN/m) ≥ | 15 | 22 | 28 | 35 |
Elongation at break (%) ≤ | 28 | 28 | 28 | 28 |
Bursting strength (kN) ≥ | 1.6 | 2.4 | 3.2 | 4.0 |
4.Images of Composite Geomembrane:
- Q: Bathroom first leveling or do waterproof, what is the difference
- 2. Grass-roots waterproof, materials, local conditions, with particular attention to the wall and root and other vulnerable parts of the leakage, should do some special waterproof, plugging treatment. Stir the waterproof material, the first layer of the coating should be waterproof material scraper evenly coated on the base surface, the thickness of 0.6mm or more, to be uniform, the first wall after the operation, from the inside out of the operation , Can not have local deposition, leaving no bubbles, strong bonding. Ground waterproof layer should be painted out of the bathroom door outside the 300 wide, should be higher than the ground 200, shower wall waterproof layer should be higher than the ground 1800mm. The next brushing direction is perpendicular to the last time. The last time the film semi-curing, throwing coarse sand particles, easy to combine with the cement mortar in the future. To be dry after a few days to do closed water test, observe no leakage side good.
- Q: Slope roof drains do not need to be waterproof
- When installing a waterproof board, when the width of a waterproof board is not enough, to be placed side by side, it should be noted that the gap between the board and the plate will provide potential space for root growth.
- Q: A complete set of basement waterproof construction program
- First, the basement of the external walls of water leakage project engineering basement waterproofing standard GB50108-2001 "underground engineering waterproof technical specifications" secondary waterproof rating. Basement exterior wall waterproof structure with self-waterproof concrete plus coil waterproof, 50 thick polystyrene board protective layer.
- Q: What material is used for waterproofing of tarpaulin
- Cement-based waterproof paste (such as the Swiss Sika) Product category Cement-based materials non-toxic, environmentally friendly, both in the construction process also Is formed after the harmless to humans and animals.
- Q: There is no formaldehyde in the finished putty
- Often people are talking aldehyde color change, because the formaldehyde is very polluted environment contains a lot of carcinogenic substances, so into the wall inside unknowingly become an environmental killer.
- Q: What are the key points and contents of the quality control of waterproof material?
- 4, high-polymer modified asphalt waterproofing membrane: check the counterfeit effective and simple method is to cut the film wrapped down and then placed in the refrigerator freezer placed 3 hours after the removal, gently forced to break will be broken, and the national standard Require material low temperature flexibility to reach -20 ℃.
- Q: Villa roof leakage what general reasons, what materials to remedy
- ??Note: Before the waterproofing and draining construction, the roof must be dry, because the roof of the water does not evaporate, the new waterproof layer will rise, the waterproof effect immediately invalid. Therefore, rainy days should not be construction, to wait until the sun will dry the water before construction.
- Q: Rigid (concrete) waterproof roofing shop SBS coil can brush a layer of waterproof paint before?
- First, rigid (concrete) waterproof roofing SBS membrane should not be painted before the coating of any waterproof coating, otherwise it will damage the bonding strength of the coil and the grassroots.
- Q: Finished house bathroom waterproof household acceptance should be how to accept?
- 4: coating waterproof layer coating evenly, the thickness of the product to meet the technical requirements, the general thickness of not less than 1.5mm not exposed at the end.
- Q: What is the difference between finished mortar and cement mortar?
- Finished mortar for dry areas, because the addition of lime, lime water retention is good; cement mortar for wet areas, because the high strength.
Send your message to us
Composite Geomembrane,One Geoxtetile One Film
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 m²
- Supply Capability:
- 300000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords