CNBM Tons of Potassium Sulfate(SOP) Project Equipment
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 1 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Tons of Potassium Sulfate Project
Economic and technical indexes:
⑤Site area:
main factory: about 2000m2
Storage tank area:about 300m2
warehouse:about 3000m2
⑥operator assignment:
workshop foreman 1person/team total 3
main operator 4person/team total 12
Viceoperator 2person/team total 6
Maintenance Worker 2person/team total 6
laboratory technician 1person/team Total 4 (monitor work days)
Acid-making worker 1person/team total 3
electrician 1person/team total 3
total: 43 persons
Process flow diagram (see table)
Forty thousand tons of potassium sulfate equipment list
No | Name | Specification | Quantity | Remark |
1. Material system | ||||
1 | Potassium chloride bucket | TD250 | 1 set | According to the custom order conditions |
2 | Potassium chloride scraping machine | MS20-35 | 1 set | According to the custom order conditions |
3 | Potassium chloride feed bin | ∅ 1700×2570 | 4 sets | According to the drawing |
4 | KCL Spiral feeder | 1400r/min | 4 sets | According to the custom order conditions |
Motor | 1.5KW | 4 sets | According to the custom order conditions | |
reductor | 1/43 | 4 sets | According to the custom order conditions | |
5 | H2SO4 elevated tank | ∅1020×1540 | 2 sets | According to the drawing |
6 | H2SO4 pump | IH50-32-125 | 4 sets | According to the custom order conditions |
Motor | 3KW 2880r/min | 4 sets | According to the custom order conditions | |
7 | H2SO4 flowmeter | LZB40F | 4 sets | According to the custom order conditions |
2. reaction system | ||||
1 | Furnace | ∅7230×4000 | 4 sets | combustion chamber, reaction chamber and flue |
Reactor bracket and the furnace plate | assort | 4 sets | According to the drawing | |
2 | Big gear / small gear | 4 sets | Mannheim furnace | |
spindle | Mannheim furnace | |||
Turn the rake arm | Mannheim furnace | |||
Tine/cases/ retaine | Mannheim furnace | |||
KCL charging machine/ charging machine sulfate | 4 sets of each | Mannheim furnace | ||
Bottom base | 4 sets | Mannheim furnace | ||
Furnace door/discharging mouth | 8 sets | Mannheim furnace | ||
Center tube, wind water cones | Mannheim furnace | |||
HCL Furnace door | 4 sets | Mannheim furnace | ||
3.Discharging System | ||||
1 | Cooling pusher | L6380×D1000 | 8sets | According to the drawing |
motor | 7.5KW | 8sets | According to the custom order conditions | |
reducer | JZQ400 | 8sets | According to the custom order conditions | |
Big gear and small gear | 8sets for each | According to the custom order conditions | ||
2 | Air seal screw conveyor | L1630×D200 | 8sets | According to the drawing |
motor | 1.5KW | 8sets | According to the custom order conditions | |
reducer | 8sets | According to the custom order conditions | ||
3 | belt conveyer | D400 | 1 set | According to the drawing |
motor | 4KW | 1 set | According to the custom order conditions | |
reduce | 1 set | According to the custom order conditions | ||
magnet | 1 set | According to the custom order conditions | ||
4 | Main motor | 15Kw | 4 sets | According to the custom order conditions |
5 | The main reducer | JYQ360 | 4 sets | According to the custom order conditions |
6 | oil pump motor | 4 sets | The main reducer | |
7 | Main motor, main reducer size belt pulley | 4 sets | According to the drawing | |
4.Crush and packing system | ||||
1 | Hoisting machine | TD250 | 1 set | According to the custom order conditions |
motor | 1 set | According to the custom order conditions | ||
reducer | 1 set | According to the custom order conditions | ||
2 | Rotary vibration sieve with motor | 1 set | According to the custom order conditions | |
3 | disintegrator | JF600 | 1 set | According to the custom order conditions |
motor | 1 set | According to the custom order conditions | ||
4 | Screw conveyor | Under the mill | 1 set | According to the drawing |
motor | 1 set | According to the custom order conditions | ||
reducer | 1 set | According to the custom order conditions | ||
5 | Bucket elevator | TD250 | 1 set | According to the custom order conditions |
motor | 1 set | According to the custom order conditions | ||
reducer | 1 set | According to the custom order conditions | ||
6 | Screw conveyor | D200×6613 | 1 set | According to the custom order conditions |
motor | 1 set | According to the custom order conditions | ||
reducer | 1 set | According to the custom order conditions | ||
7 | limestone powder feeder | ∅89×1400 | 1 set | According to the drawing |
motor | 1 set | According to the custom order conditions | ||
reducer | 1 set | According to the custom order conditions | ||
8 | finished products store | ∅ 2600×4700 | 2 sets | According to the drawing |
9 | Pelleting machine | DG450 2-2.5T/h | 1 set | According to the custom order conditions |
10 | Pulse bag dust removal machine | MC96 | 1 set | According to the custom order conditions |
distributor | 1 set | According to the custom order conditions | ||
Vibration motor | 1 set | According to the custom order conditions | ||
reducer | 1 set | According to the custom order conditions | ||
11 | dedusting fan | 4-72 | 1 set | According to the custom order conditions |
motor | 1 set | According to the custom order conditions | ||
compressors | 1 set | According to the custom order conditions | ||
5. Water system | ||||
1 | back water bucket | 600×1200×940 | 3 sets | According to the drawing |
2 | cooling tower | FRP GBNL3-350 | 1 set | According to the custom order conditions |
fan motor | 1 set | According to the custom order conditions | ||
water sprinkler | 1 set | According to the custom order conditions | ||
3 | cool water pump | 100m3/h | 4 sets | According to the custom order conditions |
4 | elevated water tank | FRP 40 m3 | 2 sets | According to the drawing |
5 | hot water pump | 100m3/h | 3 sets | According to the custom order conditions |
6 | water distribution device | 4 sets | According to the drawing | |
6.Hydrochloric acid absorption system | ||||
1 | gas chimney | FRP DN300×28000 | 2 sets | According to the drawing |
2 | scrubber | FRP Φ1600×10750 | 2 sets | According to the drawing One set of packing separator |
3 | first absorbing tower | FRP+graphite Φ700×4040 | 8 sets | According to the drawing |
4 | secondary absorbing tower | FRP Φ700×1310 | 8 sets | According to the drawing |
5 | HCL exhaust scrubbing tower | FRP Φ1600×10750 | 10 sets | According to the drawing |
6 | hydrochloric acid pump | S65×50-20 | 10 sets | According to the custom order conditions |
Motor | 3KW | 10 sets | According to the custom order conditions | |
7 | Acid elevated tank | FRP Φ1200×1600 | 2sets | According to the drawing |
8 | water flowmetre | DN25 | 8 sets | According to the custom order conditions |
9 | intermediate cell of hydrochloric acid | FRP Φ2000×3500 | 2 sets | According to the drawing |
10 | HCL suction fan | FRP 9-19-7D | 4 sets | According to the custom order conditions |
Motor | 4 sets | According to the custom order conditions | ||
11 | Graphite heat exchange system | 18M² | 4 set | According to the drawing |
12 | Hydrochloric acid storage tank | 100mª | 12 sets | According to the drawing |
13 | Absorption tower, washing tower packing | According to the custom order conditions | ||
7. oven door environmental protection system (oven gas absorption, washing) | ||||
1 | gas-collecting hood | FRP 1560×1260×1420 | 4 sets | According to the drawing |
2 | scrubbing tower | FRP∅1600×10750 | 2 sets | According to the drawing |
3 | induced fan | FRP 4-72-6D | 1 set | According to the custom order conditions |
4 | hydrochloric acid pump | S65×50-20 | 2 sets | According to the custom order conditions |
Motor | 3KW | 2 sets | According to the custom order conditions |
Images of productions:
- Q:What are the major related courses in the university?
- And the mechanical design and manufacturing (ship machine manufacturing process and equipment), electromechanical integration, welding technology and automation, chemical test and quality inspection technology (welding quality detection), automotive command, UAV application engineering, railway vehicles, mechanical and electrical equipment operation and maintenance, and application of thermal power equipment, aircraft manufacturing technology application engineering numerical control, etc..
- Q:What would be more delicate? A VCR's tape head or a DVD's lens? I don't mean the more older they are, the more fragile or delicate they would be but as in if they were manufactured in the same year, date and even the same second, what would be more delicated.PS; You might want to regard this question as a vote or an actual fact.
- In my opinion, the rotary video head is more delicate that the lens. First, it does come in contact with the tape, so can get damaged. Cleaning it improperly can damage it. A DVD lens does not contact the media in normal operation, and are pretty foolproof to clean.
- Q:What are the five major cost components of the project cost?
- . Indirect costs refer to the units directly engaged in construction for the organization and management of the expenses incurred during the construction process. Including the management of the construction units in wages, bonuses, allowances and welfare expenses administrative expenses, fixed assets depreciation and repair costs, material consumption, low value consumable amortization, management for utilities, office expenses, travel expenses, inspection fees, engineering guarantee fee and labor protection fees and other expenses.
- Q:Thus increased unemployment. Would these changes in unemployment be considered increases in full employment underemployment or recessions? If you said the former, which sector of unemployment (frictional, structural, cyclical) increased?
- This would be an increase in structural unemployment. It cannot be recessionary, because it says nothing about a decrease in output below full-employment level. It is not frictional, which relates only to the time delay between when someone is unemployed and when they get a job that is available and that they are qualified for. It would be structural, as the structure of the economy has changed. The people have skills for jobs that are no longer available, but not for the jobs that replaced them: jobs relating to the production and distribution of the new farm machinery. In the sense that there are fewer of these new jobs than there were of the old jobs, then the natural rate of employment would decrease by the difference in available jobs.
- Q:which industries use high tech machinery?
- Farming industry. And timber.
- Q:Frank has bought some expensive machinery from XYZ co. limited. The machinery does not work properly and Frank has complained several times to XYZ co. but they've ignored his complaints. Frank has decided to sue XYZ co. Explain to him which courts the case could go to and what appeal routes are available if he loses the case at first instance
- Different countries have different legal systems. Therefore, if you want an accurate answer, you should state in your question the said problem arises in which countries (USA, UK etc).
- Q:Just wondering if anyone knows anything about operating heavy machines while pregnant? I operate graders most of the time. I am 10 weeks pregnant with my first child, I have been an operator for the last 4 years. Doctor told me the only problem would be to do with tiredness but i'm more worried about the roughness and vibrations causing harm.
- If doc said it was okay then it should be. Women run while preggo. I'm sure at a certain number of weeks the doc might tell you to stop.
- Q:From where do manufacturing companies get their sophisticated equipments and machinery? ?
- From countries around the world that produce them.
- Q:What type of machinery is this?
- It looks like it might be a type of clam-shell bucket for use with an excavator, but I've never seen one that long.
- Q:I wanna an experienced Wall roll forming machinery online shop?
- www.okorder ,this company has 13 years experience of roll forming used in construction industry.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
CNBM Tons of Potassium Sulfate(SOP) Project Equipment
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 1 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords