Carbide Spectacle PM230
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Application: PM truck and trailer mounted concrete pump
2. Size: upon your request
3. Lifetime:30,000~80,000cbm
4. HRA≥86
5. Material: tungsten carbide E5 grade, S35C (GB:35, DIN:C35,ASTM:1035 steel body ( or as your requirements)
6.Germany Welding rod used for hardfacing ( or as your requirements)
7.tensile strength ≥ 2600 N/mm2 ( or as your requirements)
Name | Specification | Material | Applicable brand |
Wear plate | 200 |
Tungsten | HBT60/HBT80/HBT90 |
Wear plate | φ230 | Concrete pump truck | |
Wear plate | φ260 | Concrete pump truck | |
Wear plate | φ230 | Concrete pump truck | |
Wear plate | φ200 | HBT60/HBT80/HBT90 | |
Wear plate | φ260 | Concrete pump truck | |
Cutting ring | S60-φ200 |
| |
Cutting ring | φ230-s | Concrete pump truck | |
Cutting ring | φ260-s | Concrete pump truck | |
Cutting ring | φ230-Z | Concrete pump truck | |
Cutting ring | φ200-Z | HBT60/HBT80/HBT90 | |
Cutting ring | φ260-Z | Concrete pump truck | |
Wear plate | PM |
| |
Cutting ring | PM |
|
- Q: The building electrical iron pipe and the pipe line fixing member connected to what is called, what is called the iron pipe and the 86 fixed part of tin
- The distribution of the construction site, construction machinery and electric hand-held electric tools, lighting, construction site construction site: risk factors and lightning protection, the construction site of common electrical tools and instruments, the construction site of the electricity management, common electrical fault, accidents and accident cases.
- Q: Changsha Sanlian Building Machinery Fittings Factory
- The company in Changsha Hongdun business online can not find, provided by his address: two Changsha section of Xingsha Economic Development Zone Yuan Ming Road, I checked 114 specially call 12580 to booking the hotel near the road, not the road. Definitely a liar.
- Q: What are the main functions of construction equipment monitoring system?
- This belongs to information management engineering. The control part is the "heart" and "brain" of the whole system. It is the command center to realize the function of the whole system. The control part is mainly composed of the main console (some systems also have a secondary console). The main function of the total console: video signal amplification and signal distribution, image correction and compensation, image signal and image signal (including switching or voice signals) record, cameras and auxiliary components (such as camera, PTZ, shield) control (remote control) and so on.
- Q: What is the use of spare parts prices in Chinese market by foreign companies?
- You might be gathering information for him. You have no data for one person, if there are several people? They can analyze a lot of things through big data. You can't find out, you're OK. Once you find out, your whole life is over.
- Q: Definition of large mechanical equipment?
- A crane is a machine that cycles and intermittently moves. A work cycle includes fetching device from the extract to bring up the product, then move to the designated place down items, then reverse movement, the fetching device back in, for the next cycle.
- Q: What kind of electrical equipment do you have? What are the main components of each device?
- The utility model relates to a distribution box, belonging to a primary equipment in an electric equipment. Electrical equipment includes primary equipment and two equipment. Primary equipment is mainly power generation, power transmission, transmission, distribution, electricity and other direct generation, transmission and consumption of electrical energy equipment, such as generators, transformers, overhead lines, power distribution cabinets, switches, cabinets and so on. The two equipment is the equipment that controls, protects, measures and so on. Building or general buildings, such as cables, power distribution cabinets, motors, switches, sockets, lamps, air conditioners, electric water heaters, electricity meters, cameras, telephones, computers, etc., are electrical equipment.
- Q: What are the mechanical drawing software?
- The 3D map only contact with SolidWords and Pro/E, Pro/E is better than Solidwords in general, but Solidwords is very simple to use, see Help tutorials you can learn to draw a three-dimensional map is not particularly complex easily to estimate a few days is enough. But any one of the two kinds of software, want to do not understand the words, expert advice is not really easy. UG and MasterCAM haven't touched much, but I've heard that it's suitable for processing stereogram.
- Q: China mechanical net
- There are mechanical product development and design, mechanical equipment transformation, mechanical equipment maintenance, data inquiries, standard inquiries, mechanical professional translation, mechanical CAD and other mechanical and technical services.
- Q: What is a door rack for a construction site? How high is it generally?
- This depends on the erection of the height of the general 3 steps and within 5-6 yuan a meter, assuming the erection of 4.5 meters high, 22.5-27 yuan a square. This is calculated in accordance with single-layer, the higher the more expensive, 9 meters in 65 yuan or so square. In accordance with the establishment of meters, in accordance with the erection of the volume of the calculation.
- Q: What are the sub projects of a construction project?
- Appendix B Construction Engineering Division (sub branch) engineering, sub project division, B.0.1 Construction Engineering Division (sub branch), engineering, sub projects can be divided into table B.0.1. Table B.0.1 division number of construction works, sub works and sub projects
Send your message to us
Carbide Spectacle PM230
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords