• Base Leg For Tower Crane System 1
  • Base Leg For Tower Crane System 2
  • Base Leg For Tower Crane System 3
Base Leg For Tower Crane

Base Leg For Tower Crane

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or L/C
Min Order Qty:
1 Set pc
Supply Capability:
1000 Sets Per Month pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Description of CMAX Fixing Angle

1.The steel material selected 100 % comes from our national large-scale steel corporations .

2.The critical materials that steel, welding material etc are all checked by chemical detection , then They are allowed into workshop for batch production.

3.Strictly conforms to drawing requirements, we make the products with 16 Manganese,40 Chromium and 45#steel etc .

4,Every parts of our products that pins ,axles,sleeves etc are strictly obey quenching and tempering procedures .

5,Every parts of our products strictly conforms to the procedure requirements : mill ,plane, polish, press ,test etc in turn.

6,As for have finished products ,we perform the requirements of theISO9001 Quality System and national standard strictly.

For Tower Crane Model:

TC4808,TC5013,TC5610,TC5516,TC5613,TC6014,TC6016,TC6024,TC6520,TC7021,TC7034,TC7135,TC7050We supply different types of mast sections, anchorage collar and base frames for widely used tower crane models, with high performance and reasonable cost.

The fixing angle mainly adopts the angle steel, the bottom of fixing angles is buried in the concrete base and the top of fixing angle connects with the base mast section.

We can supply fixing angle for all kinds of tower crane. Generally, we manufacture the following kinds of fixing angle.

The fixed angles are widly used in tower crane,we can supply 1.6m section fixing angles and 2.0m section fixing angles

We're specialized in tower crane parts, mast section. anchore frame, fixing angle, pin, bolt, various mech, assembly and spare parts, control box, resistance box and spare parts, drive room and spare parts, wire rope, pulley, cable etc

 

Packaging & Delivery:

Nude in containe

about 15-30 days after receiving T/T payment

 base leg  base leg

 

 

Q: Construction Engineering, moving equipment and stationary equipment, respectively
2. Static equipment: reaction equipment (code R). Such as reactor, reaction kettle, decomposition pot, polymerizer, autoclave, converter, digester, steam ball, sulfonation pot, gas producer and so on. Heat exchange equipment (code H). Such as tubular waste heat boiler, heat exchanger, evaporator, condenser, cooler, heater, sterilization pot, water jacket, etc. for dyeing dryer, steamer, cooker, gas preheating. Separation equipment (code S)
Q: What are the details of construction machinery parts in sand casting?
9. (2) all kinds of cables. (4) either in production or life or attached to the building water pump, cabinet and equipment brought with all equipment, busbar support porcelain ramming material, manufacturing units or commissioned the construction enterprises in the construction site of the factory or production equipment, valves, acid. (2) a variety of metering device, especially the universal controversial problems put forward the principle of classification, dynamic, containers and other equipment, such as mechanical transmission, electrical, ladder, refractory lining, tower, is directly related to the investment, a reasonable division of various air conditioners, socket, heat exchanger, and the telegraph facsimile equipment, perlite, furnace metal embedded parts are the equipment. 7, transportation.
Q: What measures can effectively reduce the construction accident rate?
Hefei construction workers training _ eliminate dangerous source: eliminate the risk source of the system can fundamentally prevent accidents. But an important point of system safety is that it is impossible to completely eliminate all sources of danger and that people can only selectively eliminate several specific sources of danger. Generally speaking, when the risk of a dangerous source is higher, we should first consider whether we can take measures to eliminate it. A dangerous source can be completely eliminated by selecting the proper production process, technology, equipment, reasonable design, structural form or suitable raw material. For example: instead of the power system with pneumatic or hydraulic system, to prevent the occurrence of electrical accidents; instead of compressed air system for hydraulic system, to avoid the pressure vessel, pipeline rupture caused by shock wave; with incombustible materials instead of combustible materials, to prevent the occurrence of fire. It should be noted that sometimes measures are taken to eliminate certain sources of danger, but new sources of danger may be brought about. For example, an electric pneumatic system instead of a power system can prevent electrical accidents, but a physical explosion accident may occur in the compressed air system.
Q: Definition of large mechanical equipment?
Usually, crane hoisting (make things up and down movement), operation mechanism (the mobile crane), luffing mechanism and slewing mechanism (the horizontal movement of goods), plus metal mechanism, driving device, control device and the necessary auxiliary assembly.
Q: What kind of electrical equipment do you have? What are the main components of each device?
The utility model relates to a distribution box, belonging to a primary equipment in an electric equipment. Electrical equipment includes primary equipment and two equipment. Primary equipment is mainly power generation, power transmission, transmission, distribution, electricity and other direct generation, transmission and consumption of electrical energy equipment, such as generators, transformers, overhead lines, power distribution cabinets, switches, cabinets and so on. The two equipment is the equipment that controls, protects, measures and so on. Building or general buildings, such as cables, power distribution cabinets, motors, switches, sockets, lamps, air conditioners, electric water heaters, electricity meters, cameras, telephones, computers, etc., are electrical equipment.
Q: What are the safety protection equipment, machinery and equipment, construction machinery and accessories for construction enterprises?
For Turner, fitter, main work gloves, hats, goggles for welder, etc.; there are gloves, shoes cover, goggles, insulated shoes etc.;...... ;
Q: What are the mechanical drawing software?
Personally, CAD is suitable for large machines or buildings, and CAXA is the real machine industry's universal software, and can also save drawings in various formats.
Q: China mechanical net
There are mechanical product development and design, mechanical equipment transformation, mechanical equipment maintenance, data inquiries, standard inquiries, mechanical professional translation, mechanical CAD and other mechanical and technical services.
Q: Construction machinery production need to deal with what documents?
The person in charge of the enterprise, the person in charge of the project, full-time safety management personnel in "safety assessment qualified" column content according to the "three persons" Safety Assessment Certificate (fill in the contents of enterprise work safety management staff should meet the enterprise production safety management, the safety management department staff with the qualification to the total contract for not less than 5, not less than 3 professional contracting labor subcontracting, not less than 1; the construction site should be equipped with full-time safety management personnel according to the project size can be determined, according to the construction area of less than 10 thousand M2 project has at least a part-time staff of more than 10 thousand M2; project 1 - 2 full-time staff; more than 50 thousand M2 large sites, according to different professional safety management group);
Q: What are the sub projects of a construction project?
Appendix B Construction Engineering Division (sub branch) engineering, sub project division, B.0.1 Construction Engineering Division (sub branch), engineering, sub projects can be divided into table B.0.1. Table B.0.1 division number of construction works, sub works and sub projects

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords