Telephone Trunking
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 3000 Meters m
- Supply Capability:
- 1000000 Meters per Quarter m/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Detailed Product Description
We owned a mature group of 150 workers and set up an integrated quality control system to guarantee zero defect rates.
Therefore, we have gained high satisfaction rate from our customers worldwide, with over than 8years experience of export sales, our products are popular in the South of America, South and Middle of Africa, Mid-east zone, Pakistan, India , south and east of Asia and so on.
Modei. | Spec(W*H) | Weight (g/m) |
ECT-01 | 9x7 | 60 |
ECT-02 | 12x10 | 96 |
ECT-03 | 20x12 | 100 |
ECT-04 | 22x14 | 150 |
ECT-05 | 26x17 | 180 |
ECT-06 | 30x20 | 184 |
- Q: Read a lot of home improvement, and some tube is a regular, vertical and horizontal side by side, looks very good to see, but some hydropower master said it was only good-looking, is not conducive to walking live line, is not conducive to replacement. Some are directly diagonally walking, it seems more chaotic, but to save material and easy to replace. Ask you in the end what kind of better? More
- Not that necessary! The impact is not great! Mainly how big is your slot? How big is the load-bearing pillar? You open the slot as long as the length and width do not exceed one-fifth of the width of the single on the right! The
- Q: Outside the pipe network into the basement distribution line between the line (dozens of lines) how to prevent water
- Step 3: Use a 110-pair cable tool to connect a pair of voice jumpers to the 5-to-110 connection block on the vertical trunk 110 patch panel and the horizontal cabling 110 patch panel Online tutorials, direct Google can
- Q: Water and electricity embedded in the cast-in-place board, the structural design requirements of the cast iron pipe in the same area shall not appear three wire tube overlap, so we do more than the bend, the leadership told us to do now through the line to draw a square, Signature, I would like to ask the next line of the calculation of the amount of rules is how the calculation, this work we need to do? More
- Electric pipe pipe through the wire to calculate the amount of calculation formula: L = (pipe calculation length + wire reserved length) × with the number of cross-section wire. Leadership arrangements, is necessary, need to be calculated according to the workload.
- Q: I would like to ask, if it is strong power, threading can walk a few lines. Some people say let me see live water and electricity transformation, obviously a tube can take three lines, they have to go one, so invisible increase the cost. But if they are strong, then, is not it can also take a tube to take three lines? Or that a strong tube can only take a more line
- It is better to suggest a three-wire approach. Tube wear too much wire, the use of electrical equipment, the wire will heat, causing burning, too dangerous. Matters added: the wire in the use of the process will produce a certain amount of heat. If a wire tube into too many wires, will make the wire lack of adequate cooling space, over time there is a security risk. Often, it is better for the wire to penetrate the line after not exceeding 40% of the total space capacity. 40px conventional wire casing to go 2.5 square wire generally three better, too many lines will affect the wire in the high-power state of the heat. Wire in the normal working conditions allow the temperature rise within 65 degrees Celsius, not too high, otherwise it will affect the life of the wire, if a thread in the threading more, it is necessary to maximize the maximum allowable power load to reduce the situation to To ensure safe use of electricity. Threading also should pay attention to, into the wire of the wire can not have a connector. That is, to penetrate a whole wire. If you find the construction side of the wire into the line should be promptly corrected. Otherwise the virtual network caused by air open frequent frequent gates, the reason that is not easy to identify is not easy to repair.
- Q: Is there a difference between plastic pipe and wire tube?
- There is a magnificent macbookpro one, a white charger, a white battery extension line, manual two, a thin one thick, two discs, a cloth wipes, a warranty card, as well as filled sponge hard paper The
- Q: Brother for the first time to do such a large project, encountered problems, please help. I do weak engineering, and now the soil side to do the mine does not meet the standards, there is no drainage pipes to the sewage pipes, each rainwater wells, and then back into the stairs inside. I now want to do the pipeline block, afraid of blocking bad, afraid of injury line, which has done a similar block ah, what should be used to do blocking it? Thank you brother! The The More
- Grooming mainly occurred in the upstairs leaking, the first should be clear state. One is to prove that they are not artificial to damage, if that is the case, then you have to solve the problem. Second, in the identification of causing leakage caused by the responsibility of the neighbors. In order to clarify the situation, damaged owners may ask the Housing Quality Inspection Department to identify the causes of water leakage and how to repair. Three is to see the house or not in the warranty period, because the general purchase of the new house waterproof warranty for 5 years
- Q: Ceiling on the wire after the tube is the tube on how to fix it on the ceiling?
- This way to tell you, program-controlled switches is stored in the process of controlling the machine, the service provider's cable to the engine room, through the light cat to light signal into a voice signal, the voice signal access control switch trunk, program-controlled switches specifications are not the same, The number of lines of the trunk is not the same; program-controlled switches are not the same number of inside, the inside received you said the end of the 110 patch panel, patch panel connected to the other end of the client (landline) on it. Specific program-controlled switch configuration, playing local, long distance, inside, and so on, but also depends on your switch model, the proposed reference manual. hope this helps!
- Q: Repair house to go dark line how to line tube
- ODF fiber patch panel optical fiber patch panel (OpticalDistributionFrame) for optical fiber communication system in the backbone of the trunk cable and the distribution, can easily achieve the fiber line connection, distribution and scheduling. (Room) cable transfer box is a trunk for the cable, wiring layer cable to provide fiber optic cable into the end, the transfer of the transfer device. After the cable is introduced into the cable transfer box, it is connected with the optical fiber and the wiring layer. (outdoor)
- Q: Some of the frame of the brake pipe line in the tube is no wire, the wire leak out. But my frame brake tube is the tubing of the seat, so I only know how to install all-inclusive brake wire, would like to ask whether the kind of wire exposed to the kind of exposed? If you can change, need those accessories, what is the name, how to install. Know the friend taught me ah? Best on the map. Thank you first here. More
- Specifically look at the laying of the power cord, the laying of the safety current is generally about 65A, the maximum can withstand .000 watts of electrical power; dark line laying safety current is generally around 40A, the maximum can withstand .000 watts of electrical power.
- Q: My new home shop a good tiles, some places knock the sound is not the same, the decoration company that is buried under the line will lead to sound wrong, is this right? Or because the tiles are empty drums, decoration companies refused to admit? It is reasonable to say that between the tiles and the pipe there is a very thick cement sand, it should not lead to the sound of drums on the tiles, right? Which professional advice urged, anxious! anxious! anxious! Thank you! More
- No, it 's just that you may have some cement and sand
1. Manufacturer Overview
Location | Guangdong,China |
Year Established | 2008 |
Annual Output Value | Above US$100 Million |
Main Markets | 20.00% Domestic Market 20.00% Africa 20.00% South America 10.00% Eastern Asia 10.00% Mid East 5.00% South Asia 5.00% Central America 5.00% Eastern Europe 3.00% Southeast Asia 2.00% Western Europe |
Company Certifications |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | Shenzhen,SHUNDE,GuangZhou |
Export Percentage | 71% - 80% |
No.of Employees in Trade Department | 3-5 People |
Language Spoken: | English, Chinese, Spanish, German, Arabic, Russian |
b) Factory Information | |
Factory Size: | 10,000-30,000 square meters |
No. of Production Lines | Above 10 |
Contract Manufacturing | OEM Service Offered Design Service Offered |
Product Price Range | Average |
Send your message to us
Telephone Trunking
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 3000 Meters m
- Supply Capability:
- 1000000 Meters per Quarter m/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches