Bridge girder erection machine/Launching gantry/Lunching girder
- Loading Port:
- Tianjin
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 2000 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Product Description
Bridge girder erection machine merges an adaptation of a wide range of work, excellent performance, convenient operation, safety structure into a single whole. It has the steel structure of rail type precast beam hoisting rack equipment. This product can be used not only in plain construction, but also to meet the construction of mountain highway slope, curved bridge, skew bridge and tunnel bridge requirements.
The bridge girder erection machine consists of main girder, crane, front legs, rear legs, front leg cylinder, rear leg cylinder and the transverse connection of front, middle, rear legs. The control part is composed of hydraulic system and electric control system. The bridge girder erection machine is characterized by reasonable compact structure and convenient installation, the main standard girder is connected by pin connection. The double girder structure is connected between the two frame girders by welded pipe.
The bridge girder erection machine not only can meet the standard set up, but also it can meet the cross curve erection, variable span erection, span continuous beam, composite beam, continuous steel etc. In addition to bridge erection, simply supported girder erection and point lifting, it is characterized by good stability, high efficiency, safety and reliability, variable span convenient adjustment and convenient operation and etc.
Structural Drawing and Technical Parameter
Lifting Weight | t | 60 | 80 | 100 | 180 | |
bridge radius | m | 20-30 | 20-35 | 30-40 | 35-50 | |
Slope | below 1/20 | |||||
Turning Radius | m | 200 | 250 | 300 | 350 | |
Angle of Skew Bridge | 0~15° | |||||
shop travelling speed | lengthways moving | |||||
lifting | 1 | 1.2 | 0.8 | 0.6 | ||
6/0.6 | ||||||
crane travelling speed | lengthways moving | 6/0.6 | ||||
sidesway | 6/0.6 |
Safety Features
Safety is the most important issue for cranes.To ensure the safety,the following safety devices are equipped.
*Crane traveling limit switch.
*Overload protection device.
*Lifting height limit device.
*Voltage lower protection function .
*Phase sequence protection function.
*Emergency stop function.
*Rain cover for outside hoist, driving units, electric cubicle.
*Warning indicator : flashing nights and warning sounds.
*Wire-less infra-detector for anti-collusion.
- Q: This book was published in 1927 by John Deere Corp., the first of a series for use in schools. It is now mainly of interest to collectors of antique farm machinery.
- Go okorder
- Q: The cost of machinery which makes an energy from wind...?
- You can build a windmill for about $100 but it won't do much or you could spend millions and get a lot of power.
- Q: I heard this snippet of classical music which I can't find now. I've heard it before in movies going back a long, long time so it is quite old I think. I evokes a dark and disturbing image of an army of automatons marching, or maybe a factory with heavy machines with giant piston punching out parts along a never ending conveyer. I think it is cello's, if that helps at all -- I don't have an ear for classical music. I think the announcer said something about tchaikovsky or romeo and juliet but I could be wrong, this doesn't sound romantic in the least, just the opposite; cold and impersonal.
- There is actually a piece called 'Iron Foundry' by Mossolov. Perhaps it's that.
- Q: i need woood working machinery for my industry.i am looking for good indian supplier for iported machines.
- You can find several trusted suppliers near by your region for easy and affordable transportation of your required woodworking machines.
- Q: Do all hydraulic systems use oil? Or do only some? Please give a list. Thanks.
- a hydraulic system can use any fluid ... you need to worry about temperature raised within the fluid during operation, and how to dissipate. Also, large pressure changes could cause the fluid to evaporate
- Q: I'm not sure what plant and machinery is and which is used in schools, any answers will be very helpful.
- Schools, Hospital and etc are non-profit motive institutions: so there is no chance for plant machinery
- Q: Why havent this issue been on the news?? i mean, who is doing most work at factories to day? man or machine. Machines are. It aint odd that people cant find jobs. Today i saw the garbage truck picking up the garbage. Last year they had 3 guys standing in the back of the truck. this year its a robotic arm picking up the garbage and there for 3guys propably lost their jobs. Why aint this issue raised? can capitalism survive if the machines does most off the industrial work?sorry about the bad english
- Cities and towns award garbage pickup contracts to the low bidder so those who bid high likely used manual pickup.The cost savings to the cities and towns results in lower taxes to homeowners who use these savings to purchase more food, clothing, home improvements, etc which put more people to work to supply these additional purchased gooda and services. So there likely is no net loss in jobs. Automation to reduce the cost of american made goods and services so that they are more competative with foreign made goods actually preserves jobs in the U S because the additional foreign purchases of American made goods increases the need for american workers to make these additional US made goods. We must learn how to keep the sale of our goods abroad equal or more than our purchase of foreign goods or we will surely lose more jobs. Since our labor costs/ hr are much greater, the only alternative is to reduce the man-hours to make products for sale abroad. Cheep foreign goods benefit the poor and middle class since the money they save by buying the cheeper foreign goods allows them to have more money to spend on other essentials made in america..
- Q: Bally Manufacturing sent Intel Corporation an invoice for machinery with a $20,000 list price. Bally dated the invoice July 23 with 2/10 EOM terms. Intel receives a 40% trade discount. Intel pays the invoice on August 5.
- Yeah, so what's the question really? (You don't really state what you want answered). But anyways, Intel missed the 10 day discount period on the payment terms, so they can't take that. ------------------------ It's also hard to tell if the trade discount is already included in the invoice amount (which it should be).
- Q: LOL Industrial mechanization!
- You need only three things to repair anything. duct tape, Phillips head screwdriver and a hammer.
- Q: what do you think?
- Are you really asking this question. Thats stupid. If your trying to kill yourself, or others. But no you shouldn't.
Send your message to us
Bridge girder erection machine/Launching gantry/Lunching girder
- Loading Port:
- Tianjin
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 2000 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords