CNBM 250T Pre-casted segmental assembly Launching Gantry/ Bridge girder erection machine
- Loading Port:
- Tianjin
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 2000 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Product Description:
CNBM-TP60 Pre-casted segmental assembly Launching Gantry, 60M span, radius ≥ 550 m
Technical Parameter:
Main Technical Parameters | |||
Item | Parameters | Item | Parameters |
Construction Method | 60m Symmetrical suspension | Beam feeding mode | Lower or tail feeding beam |
Hanging block weight/quantity | Semi-suspended 1500t/8 segments | Crane capacity | 250t |
Max. adaptive slope | Longitudinal gradient 3.4%;transverse slope 8% | Crane lifting height | 70m |
Accommodation curve | 60m span radius ≥ 550 m | Whole machine shift speed | lengthways moving 1m/min;sidesway 0.5m/min |
Dynamic condition | 380V,50Hz | Whole machine working level | A5 |
Wind condition | The wind speed shall be less than 12 m/ s at the time of movement | Lifting speed | Heavy load 0-2.5m/min, no load 0-5m/min |
Transportation condition | Meet road or rail transport boundary | Crane walking speed | 0-15m/min |
Whole machine power supply | 380kw | Crane Lifting Device | Full rotation, bi-directional adjustment of 4% and 8% |
Feature:
(1) Reasonable structure
(2) Favorable performance
(3) Smooth starting and stopping
(4) Safe and reliable traveling
(5) Low noise, commodious cabin and good view
(6) Convenient maintenance, excellent exchangeability for parts and components
(7) Saves electricity specifications
Safety feature:
(1) Weight overload protection device
(2) Lifting height limit device
(3) Voltage lower protection function
(4) Phase sequence protection function
(5) Emergency stop function
Control method:
(1) Pendent line control
(2) Remote control
(3) Cabin control
(4) Choose any two together
Installation photos:
- Q: Heavy machinery as in tractors... what would you need human labor and heavy machinery for in a horse farm
- growing feed and hay -- horses eat a lot.
- Q: I'm looking on find places to buy broke machinery like CATERPILAR, CASE, JOHN DEERE, etc in Texas mainly but all over US would be the best. Thank's.
- try OKorder!
- Q: Just wondering if anyone knows anything about operating heavy machines while pregnant? I operate graders most of the time. I am 10 weeks pregnant with my first child, I have been an operator for the last 4 years. Doctor told me the only problem would be to do with tiredness but i'm more worried about the roughness and vibrations causing harm.
- If doc said it was okay then it should be. Women run while preggo. I'm sure at a certain number of weeks the doc might tell you to stop.
- Q: hoew do you start a waste paper recycling plant ? what are the machineries required?
- the fee could rely on how large the plant replaced into. you are going to be able to desire to start with a bypass decrease paper shredder and a 5 gallon (19 liter) bucket and a water faucet. So it would desire to fee everywhere from approximately $one hundred to $a million.5 Billion, i assume. additionally the earnings could rely on the size and performance of the plant and the quantity and fee of hard paintings required.
- Q: HOW COME WERE THE ONLY SPECIES ON THIS PLANET THAT INVENTS AND OPERATES MACHINERY !?
- Because of evolution. Throughout millions of years we've developed into the smartest beings on earth. Were capable of thinking and have thumbs! 2 things animals do not have.
- Q: I am trying to decide what i want to settle in and do for a career. I would really like to become a heavy machine operator for road contruction and such. What are the requirements to get into this kinda work and where is a good place to start? I don't have any other contruction experience, i have painted houses and installed satellite for years.
- To okorder
- Q: So I have to write a paper and one of the things I have to write about is where my breakfast comes from. This includes where the companies get their machinery for the factories/farms. I'm having the worst luck trying to find these. So who provides the machinery for:Oscar MayerSparboe FarmsQuaker OatsBunny breadI also need to know who financed my breakfast from the early stages of production. Can anyone help?
- Google those companies, find their E-mail address, click on contact us ask them.
- Q: Survey: What piece of heavy machinery should I operate after the meds kick in?
- One of those giant bulldozer ball thingys that knock down buildings
- Q: Which one is easier and why ? Which one is better pay ?
- If you are looking for something physically easy then likely operating heavy machinery for construction may suit you. If you are looking for something mentally easy then refer to the above comment aboust Walmart. Each field will require some training, the schooling for HVAC and Electrician is going to be more mentally demanding in terms of theory. I would imagine that learning how to operate heavy construction machinery would likely be heavy on safety and total hours of training. There is a large amount of safety training for HVAC and Electrical work as well but its an entire different world compared to operating construction machinery.
- Q: these machines all weigh in the hundreds and are up to my waistthere used but in good conditionthey are:JOINT PLANER(oh and is there a better name for this one?)TABLE SAWSURFACE PLANERi want to know how much these items would cost?im trying to sell them but not sure what the prices should beim planning to put em on ebay and would appreciate your helpthank you!
- Around here there is limited demand for it. Scrap prices mostly. Sad, but not too many people can use it and often it's 3 phase and requires an industrial area to set up. Newer shops don't want to fuss with tuning and repairing it and are more likely to go with CNC units or multi-function European machines. There are a few people that like the old iron Around here it would be called a jointer and thickness planer.
Send your message to us
CNBM 250T Pre-casted segmental assembly Launching Gantry/ Bridge girder erection machine
- Loading Port:
- Tianjin
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 2000 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords