Board Retaining Coupler for Scaffolding Q235 Q345 CNBM
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 5000 pc
- Supply Capability:
- 30000000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details of Board Retaining Coupler for Scaffolding
Material :Q235 carbon steel
Production Standard :BS1139 EN74
Applications :Construction
Package :In bag and pallet
Futures of Board Retaining Coupler for Scaffolding
Our forged couplers are with superior abrasive resistance/ deformation resistance/anti-fatigue capacity/anti break capacity/ tensile property.
Especially adapting the 8.8 grade high strength screw & surface galvanized de-rusting process, the forged scaffolding couplers greatly reinforced the firmness & deformation resistance & corrosion resistance.
Our scaffolding couplers contributed to keep the scaffolding system reliability and safety and hardly cause the slippage accidents.
All our galvanized scaffolding couplers with anti-rust processing are designed for a longer lifespan and strictly manufactured according to National standards.
FAQ
1. What is considerations of Scaffolding installation?
There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,
(1) scaffold frontage hurtful to prevent falling objects protection is required.
(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator
2.What are the certifications of your products?
Certified by SGS, BS1139, EN74, Local Test Report.
3. How long is the warranty period for your product?
Our products warranty is 2 years.
- Q:The role of the external scaffolding and the relevant provisions?
- Scaffolding outside the building in the construction of the building is an indispensable important tool for erection. Its role: first, can make the construction personnel in different parts of the operation of the high; two is to ensure the safety of construction personnel in the high altitude operation
- Q:The construction scheme of high rise and external cantilever scaffold!
- Cantilever scaffold erection scheme1, the basis of preparation (omitted)2, engineering survey:This project is the building of electricity production, Handan power supply company, located in the main street and Chaoyang Road Interchange, a total construction area of 17747.8m2, the ground layer ten, partial eleven, annex four, underground two floors, the total height of the building is 44 m, frame structure, the project frame adopts double row cantilever beam pick the scaffold in a layer, five layer nine layer is arranged in the cantilever beam. The scaffold scaffold.
- Q:I couldn't believe it, but yes it happened...
- yea I can believe that. There have been people who have survived jumping out of planes at ten thousand feet. One guy landed in a snow bank and I think another hit a tree and I guess it was some kind of pine and the branches slowed him down.
- Q:Standard Specification for bowl buckle scaffold
- Compared with other types of scaffolding, bowl buckle type multifunctional scaffolding is a new scaffold with broad development prospects.
- Q:I want to know the classification of scaffolding in the building
- Steel pipe scaffold. The utility model is composed of two or more steel pipes of different specifications, such as a door type scaffold.
- Q:What are the dangers of scaffolding
- Analysis of the types of scaffolding accidents1) the entire frame dumping or local collapse frame2) the whole frame instability and vertical collapse3) personnel from scaffold falling
- Q:What are the main safety problems when dismantling the scaffold
- 3, the demolition of spare parts to be loaded into the container, with a crane hanging; the steel pipe to be tied to secure, double point lifting, prohibited from high altitude thrown.4, more than six wind (including level six) to stop the construction of mobile scaffolding.
- Q:Key points for safety of portal scaffolding
- 2, take off the scaffolding workers must wear a helmet, wearing a seat belt, wear non slip shoes.3, the construction load should meet the design requirements, shall not overload; shall not be stacked on the scaffolding template, steel and other objects. Prohibited in the scaffolding on the pull cable wind rope or fixed, erection of concrete pump, pump and lifting equipment etc..
- Q:What are the common rules for calculating the amount of scaffolding works
- According to the wall masonry scaffolding (single) vertical projection area calculation with square metre.Scaffolding, without deduction of door and window opening, air ring, vehicle channel, deformation joint area. At the same time, the height of the same building is different, according to the vertical height of the building.
- Q:Can you do the outer scaffolding?
- (4) the lower part of the inclined bar at 30 cm in height from the ground and control connection pole. (5) according to the height of the structure and the length and the width of the scaffold, it should be combined with the actual situation in the construction to set up the scissors and the diagonal brace. (6) the scissors rod connected by the lap, lap length not less than 100 cm, and not less than 2 rotating fastener, rod end edge to the distance of the fastener cover more than 10 cm. 8, laying the scaffolding board (1) scaffold set level in 3 horizontal bar, and the two ends at 8 cm with a diameter of 1.2 mm galvanized wire hoop around the 2 to 3 ring fixed. When the scaffold length is less than 2 meters, the two small bar support.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Board Retaining Coupler for Scaffolding Q235 Q345 CNBM
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 5000 pc
- Supply Capability:
- 30000000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords