Auto-climbing Formwork from CHINA with Hydraulic equipment for tower building
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m²
- Supply Capability:
- 500000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Introduction of Product
The driving power of the auto-climbing formwork is the hydraulic unit, which consists of the oil cylinder and commutators. The steel rail and bracket can climb up alternately via the functioning of hydraulic system, the commutators used to control the lifting of the climbing rail and the bracket so that realize the inter-climbing movement of steel rail and the bracket, thus, the whole system will climb up steadily. Cranes are unnecessary during the process of construction. this hydraulic climbing system is easy to operate, and climbing is fast and safe.
Characteristics of Product
1. Crane-independent
2. One oil cylinder unit can lift 50KN.
3. The QPMX-50 system can climb not only vertically but also slantwise, and the forward or backward inclination can be up to 18 degrees.
4. Perfect load bearing anchor system.
5. The bracket does not come back to the ground until construction work is finished, and spacing for work is reduced while the bumping damage is almost completely prevented, especially for the plywood.
6.The error of structure construction is tiny and easy to correct.
7.The formwork can climb up through itself and clean work can be done in site. The number of crane lifts are greatly reduced.
Climbing Process
1.Set up the formwork by wall-through tie-rods and pull-push props, embed anchors and make concrete pouring in the first time.
2. Strip the formwork after the first pouring and fix anchor shoes on the finished wall, lift the brackets and formwork to the right position, match the formwork and do the second pouring.
3.Lift formwork and brackets to the higher floor; fix climbing rail and hydraulic system.
4.Put the formwork to the right position and do the third pouring.
5. Remove the formwork and fix anchor shoes on the finished wall, then let the climbing rails climb.
6. When the brackets climb up to the right position, install suspended platform.
7. Ajust the formwork and proceed with the concrete pouring and proceed into the standard climbing stage.
- Q: What are the maintenance and maintenance of hydraulic climbing formwork
- Whether or not the double screw nut is used on the important bolt connection, the degree of the fastening, whether the steel bar is pressed according to the rules, and the steel wires are bundled together
- Q: Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
- Install the lifting seat and a guide seat is connected with the high wall, main frame vertical rod, the frame set up to the designed height, laying the top scaffold, block feet - laying bottom safety nets and scaffolding, making turning plate - the upper part of the frame body structure and effective tie (tie spacing is not greater than 6m) - display efflux dense mesh safety net to the top of the shelf, the anti dropping boom is inserted into the base anti dropping device, the installation of steel rope - placed distribution cables, installation control cabinet, electric hoist, electric wiring and debugging system, pre inspection, electric hoist, demolition of frame body and the upper structure of pulling and synchronization a layer - installation completed, enter the upgrade cycle
- Q: The difference between the scaffold and the scaffold
- The difference between climbing frame and scaffolding is commonly used scaffolding from below has been set up, which is followed by building up climbing frame, the figure is upstairs, they have in common is that we are like scaffolding
- Q: Advantages and disadvantages of climbing frame and floor type scaffold
- 3, compared with the economy, the processing is simple, and the investment cost is low; if the geometric dimensions of the scaffold are carefully designed, and the utilization rate of the steel tube is improved, the material consumption can also obtain better economic effect. Fastener steel pipe frame equivalent to 15 square meters per square meter of construction steel.
- Q: The whole concrete wall climbing frame or good use of steel scaffolding
- Climbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction
- Q: What is an integrated climbing frame? What are the works? What are the advantages
- And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings. Rental fees do not want the same
Send your message to us
Auto-climbing Formwork from CHINA with Hydraulic equipment for tower building
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m²
- Supply Capability:
- 500000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords