• Aluminium Scaffold Tower with top quality CNBM System 1
  • Aluminium Scaffold Tower with top quality CNBM System 2
Aluminium Scaffold Tower with top quality CNBM

Aluminium Scaffold Tower with top quality CNBM

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t
Supply Capability:
3000 m.t/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Quick Details

  • Model Number: RS

  • Material: 6082

  • Diameter: 48.0mm

  • Thickness: 4.0mm

  • Surface: In raw

  • Minimum Order Quantity: 20 tons

  • Packaging Details: Pallets

  • Certificate: CE

Aluminium Scaffold Tower with top quality CNBM

2.Packaging & Delivery

Packaging Details:pallet

Delivery Detail:

3.Product Overviews

Model No: RS

Product Name:   Galvanized Ringlock Scaffolding System

4.Features:

1. Standard:  Made of 48mm O.D. x 3.2mm thickness high grade steel tube, 1 discal leg 0.5meter, Length: 3000, 2500, 2000, 1500, 1000, 500mm etc. Available, and can be to ordered by you,

2. Ledger: Made of 48mm O.D. x 3.2mm thickness high grade steel tube, length800mm/ 1500mm, length can be ordered.

3. Ring: Made from cast-steel or pressed steel

4. Ledger connection-peg: made from cast-steel,

5. Base screw jack: length 600mmx3.5mm thickness strength tube, length to be order, solid tube available.

6. U head screw jack: length600mmx3.5mmthickness strength tube with U head plate, length can to be order, solid tube available.

7.  Surface: painted/electro (hot dipped) galvanized or to be order

8.  Also can manufacture it as your requirement

5.Basic Components

 

6.

Ring   Lock System Scaffold Bay Brace / Diagonal Brace

Model

Description

Weight(kg)

Weight(lbs)

AR.DB.3050x2000

Ring Lock Bay Brace 3050x2000mm (10')

10.87

23.96

AR.DB.2745x2000

Ring Lock Bay Brace 3050x2000mm (10')

10.24

23.96

AR.DB.2440x2000

Ring Lock Bay Brace 2440x2000mm (8')

9.62

21.20

AR.DB.2130x2000

Ring Lock Bay Brace 2130x2000mm (7')

9.03

19.91

AR.DB.1830x2000

Ring Lock Bay Brace 1830x2000mm (6')

8.51

18.76

AR.DB.1520x2000

Ring Lock Bay Brace 1520x2000mm (5')

7.91

17.45

AR.DB.1220x2000

Ring Lock Bay Brace 1220x2000mm (4')

7.62

16.80

AR.DB.1150x2000

Ring Lock Bay Brace 1150x2000mm (3'10")

7.53

16.61

AR.DB.1065x2000

Ring Lock Bay Brace 1065x2000mm (3'6")

7.44

16.41

AR.DB.910x2000

Ring Lock Bay Brace 910x2000mm (3')

7.29

16.07

AR.DB.650x2000

Ring Lock Bay Brace 650x2000mm (2'2")

7.08

15.62

AR.DB.610x2000

Ring Lock Bay Brace 610x2000mm (2')

6.90

15.21





AR.DB.3072x2000

Ring Lock Bay Brace 3072x2000mm

10.95

24.14

AR.DB.2572x2000

Ring Lock Bay Brace 2572x2000mm

9.89

21.81

AR.DB.2072x2000

Ring Lock Bay Brace 2072x2000mm

8.93

19.69

AR.DB.1572x2000

Ring Lock Bay Brace 1572x2000mm

8.10

17.86

AR.DB.1400x2000

Ring Lock Bay Brace 1400x2000mm

7.86

17.33

AR.DB.1286x2000

Ring Lock Bay Brace 1286x2000mm

7.71

17.00

AR.DB.1088x2000

Ring Lock Bay Brace 1088x2000mm

7.47

16.47

AR.DB.1036x2000

Ring Lock Bay Brace 1036x2000mm

7.41

16.34

AR.DB.1020x2000

Ring Lock Bay Brace 1020x2000mm

7.40

16.32

AR.DB.880x2000

Ring Lock Bay Brace 880x2000mm

7.26

16.01

AR.DB.732x2000

Ring Lock Bay Brace 732x2000mm

7.14

15.74





AR.DB.3000x2000

Ring Lock Bay Brace 3000x2000mm

10.77

23.75

AR.DB.2500x2000

Ring Lock Bay Brace 2500x2000mm

9.74

21.48

AR.DB.2000x2000

Ring Lock Bay Brace 2000x2000mm

8.80

19.40

AR.DB.1500x2000

Ring Lock Bay Brace 1500x2000mm

8.00

17.64

AR.DB.1000x2000

Ring Lock Bay Brace 1000x2000mm

7.38

16.27





AR.DB.2400x2000

Ring Lock Bay Brace 2400x2000mm

9.55

21.06

AR.DB.1800x2000

Ring Lock Bay Brace 1800x2000mm

8.47

18.68

AR.DB.1200x2000

Ring Lock Bay Brace 1200x2000mm

7.60

16.76

AR.DB.900x2000

Ring Lock Bay Brace 900x2000mm

7.28

16.05

7.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Q:how much does a scaffolding business earn a year?
The amount earnt very much depends on the size of the business, contacts within the industry, membership of industry associations and the country that you are operating in.
Q:this is the excerpt-We have witnessed a people [Muslims] to each and every one of whom death is preferable to life, and humility to prominence, and to none of whom this world has the least attraction. Their leader is like one of them: the low cannot be distinguished from the high, nor the master from the slave. And when the prayer time comes, all wash their hands and feet and humbly pray.QUESTION: How does this writer describe the Muslim people?Sorry i know this is my homework i just need help analyzing it. Is the writer describing them as unliked people? or people he respects?
people he unlikes and can u help me make an abc book about the revolutionary war
Q:Wankou scaffolding steel scaffolding and look like? What is the difference
Each node of the bowl buckle scaffold is made of a button which is shaped like a bowl, and the frame body is built,
Q:Cuplock scaffolding every 6 meters set a longitudinal scissors is what mean
Means that the bowl buckle scaffold vertical every interval of 6 meters to set up a pair of scissors, out of the vertical rod and bar,
Q:A 75kg painter stands on a 5.5m long uniform plank resting on a scaffold. If the plank's mass is 20kg , how close to the left end of the plank can he stand without tipping the plank? ( The scaffold supports are 2.5m apart, and the plank extends beyond the scafold supports, 1.5m on each end.)
The mass of the plank on the left side of the scaffold is: M? = (20 kg) × (1.5 m) / (5.5 m) = 5.45 kg The distance between the scaffold and the center of mass on the left side is: L? = (1.5 m) / 2 = 0.75 m So the torque of the plank on the left side is: T? = (5.45 kg)×(0.75 m) = 4 kgm The mass of the plank on the right side of the scaffold is: M? = (20 kg) × ((5.5 m) - (1.5 m)) / (5.5 m) = 14.5 kg The distance between the scaffold and the center of mass on the left side is: L? = ((5.5 m) - (1.5 m)) / 2 = 2 m So the torque of the plank on the left side is: T? = (14.5 kg)×(2 m) = 29 kgm Now, say the painter stands at X meter on the left side from the scaffold, so the torque added on the left side is: T? = X × (75 kg) The total torque on the left must be the same as the total torque on the right, so (4 kgm) + X×(75 kg) = (29 kgm) X×(75 kg) = (25 kgm) X = 0.333 m That is the maximum distance the painter can move away from the scaffold, so the distance to the end of the scaffold is: D = (1.5 m) - (0.333 m) = 1.167 m < - - - - - - answer
Q:I live on the second floor of an apartment building the scaffolding is all around the windows. When the men are working, they are just a few feet away! It's awful. Anyway to find out when this hideous mess will come down?
Well on every building that has construction on it there's a little section that he paper work and permits all over it ( usually at street level) so I'm going to guess if you can obtain the constructions companies phone number from those paper you can call and ask when the scaffolding is coming down.
Q:Scaffolding and scaffolding, what is the difference between manufacturers, there is no professional answer?
Scaffolding and scaffolding, there is a big difference, manufacturers only than the ordinary user to better understand the scaffolding characteristics.
Q:Is there a such thing as a scaffold fracture?
Are you sure you didn't mean to say Scaphoid Fracture. The scaphoid process is a projection coming from your Scapula(shoulder Blade), that connects with the clavicle( )and humerus(arm). Hope this helps thanks.
Q:left end. What is the Tension in EACH wire??can anyone help
And you asked this physics question in the math section of answers because? Let Tl and Tr be the tensions in the left and right wires. We are told the weight of the box is W and that the scaffold is weightless.
Q:^^^ thats alll. and does it hurt?
Cost depends on where you go. Pain depends on your pain tolerance.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords