Air Diffusers Air Flow Vent for Ceiling
- Loading Port:
- Ningbo
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 100 pc
- Supply Capability:
- 999999 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification of Air Diffuser
Supplying Air Diffusers
-Frame Thickness: 1.0mm /0.8mm
-Any Size be customed
-Powder Coated RAL 9010/9016
Data sheet
1 | Item | HVAC aluminum air conditioner grille |
2 | Materials | Extruded Aluminum alloy (6063-T5) |
3 | Blade | Blades in 45°from aluminum profile or as customer’s requirements |
4 | Bar spacing | 30mm as standard or as customer’s requirements |
5 | Materials | 0.8mm, 1.0mm, 1.2mm, 1.5mm or according to the customers’ |
6 | Surface Finish | Powder coated, Anodized , PVDF, Mill finish. |
7 | Size | Width x Height, any sizes available |
8 | Powder for Finish | Environmental protection and non-toxic, and Color to keep 5 -10 years. |
9 | Color | Refer to RAL colors swatch or customized colors available |
10 | Design | Drawings designed according to the customers’ requirements |
11 | Payment terms | T/T, L/C, PYAPAL, etc. |
12 | Delivery time | Usual 15-20 work days for a 40GP container |
13 | Package details | Bubble wrap + Cartons for FCL, Bubble wrap + Cartons + Wood-box for |
14 | Mesh | Stainless steel security mesh, Aluminum security mesh |
15 | Type | Fixing and adjustable installation |
Usage of Air Diffuser
The grille is suitable for ceilling sidewall, soffit or cill mounting and may be used for supply or extract applications.
Typical installations include offices, shops, hotels and most commercial or industrial buildings.
Available as standard in white polyester powder coat finish.
Other polyester powder coat finishes are also available as an option.
FAQ of Air Diffuser:
1, What's size do u have for round type diffuser?
A: We have face size from 150mm to 550mm,neck size from 250mm to 400mm聽
2, Do u still have other types ?
A: Yes, we have round diffuser/ rectangle diffuser/ linear grilles/ baseboard diffusers,etc
3, What's the most early delivery time?
A: Within 25 days for each 40'fcl
- Q: Will the warm winter do not burn?
- A. Winter should not be careful when heating, should prevent the water separator parts and the water pipe in the heating pipe clogging the pipeline; b. Not to be activated when the water cut parts to prevent cracking; the system is not installed after the winter, such as Indoor temperature below 5 ℃, should be, the system of water with all the air compressor blowing out to prevent the system for the Dianxian spring spring temple pseudo-East sickle frozen; winter does not enable geothermal heating system should pay attention to protection, The water is frozen or the water is frozen in the heating pipe.
- Q: Gas boiler display hh what is the fault
- 2, different brands of fault code expression is not the same way; 3, in order to better, but the code is not the same as the code, The problem can explain the consequences of failure.
- Q: Last year just cross the room, will the ground to freeze it? How big is it possible? If it is possible to crack, need to press to determine it? Question added: no live, to warm should be no water. More
- Too cold, if the indoor temperature below 5 ℃ will crack. If you do not need to do some maintenance. Maintenance methods: winter should not pay attention to heating, should prevent the water separator parts and heating pipe in the water clogging the pipeline. If the indoor temperature is lower than 5 ℃, the system should be used in the air compressor all blown out, to prevent the child fat forging forging crazy Fist Fist system is frozen. Winter should not be enabled when the geothermal heating system should pay attention to protection, to prevent the water diversion components or heating pipe in the water icing.
- Q: Seeking the whole process of the head test pressure, text description, detailed point,
- 1. Test pressure single test pressure and system test pressure, single test pressure: pipe laying or hidden parts of the pipeline after the completion of installation and design requirements according to the requirements of water pressure test. System test pressure: heating system installed according to the design and specification requirements for system water pressure test. 2. Heating, air conditioning system test procedures: a first check the entire system of all control valves are open, the system should be separated from the outer pipe network, open the gas tank release valve. B will be the water supply pipe, test pressure pump and other temporary pressure test pipe connected to the main water supply pipe, and irrigation to the system until the system filled with water and the pipeline system after the air drained (put the wind gate workers The valve out of the water so far), close the release valve; c operation test pump to boost, boost the process should pay attention to check the management, fittings and accessories are leaked, such as leakage should stop the pressure, and after the buck Repair, change pad, tighten and so on. D system without leakage, the pressure and boost to the test pressure, stop the pump check, and observe the pressure gauge, requiring 10 minutes pressure drop of not more than 0.02Mpa, that is qualified.
- Q: Dual-use boiler is also only one burner, then the life of hot water and heating hot water is how to burn at the same time? More
- Dual-use fireplace life hot water, heating function is not working, and always life is hot and dry tripod scraping scraping calcium state water abalone priority, no life hot water demand and then switch to heating, casing machine and plate change Machine life hot water function is different...
- Q: What is the principle of warm What do the fuel
- What is the principle of warm What do the fuel...
- Q: On the bathroom water seepage problem, the water seepage parts of the wall, the bathroom inside the angle valve, the water into the sea Feng suppression of the economic power of the tibu ax hugs are not, in the end where the water, for explanation, is the following tiles below the reverse water? More
- Where are you specific?
- Q: Geothermal pipes are not at all temperatures
- Plumbing heat pipe after 2-3 years, the tube wall will produce a lot of accumulated dirt, resulting in inadequate water flow, heat is not enough, heating effect caused a great impact, this time you need to use the warm pipe cleaning equipment to solve the warm pipe Blocking the problem, to warm the pipe dredge commonly used tool is to warm the pipeline dredge machine. In order to clean the pipe, it is necessary to use the correct way to clean, otherwise it will cause unnecessary results.
- Q: Hello, may I ask Daikin LMX + EEHS = Multi-function VRV? Which configuration is better! Home just can use LMXS41U machine! Thank you.
- Can not be equal, multi-function VRV or EEHS to the warm area of 110 or so is the highest cost-effective, if you want to separate I recommend to warm the other brands, or else is more versatile, after all, summer is equivalent to heat recovery, hot water Basic free use, the price is basically the same, it is estimated that the multi-functional will be slightly cheaper, more EEHS also need to host, but the price is slightly cheaper than the multi-functional but other prices are the same
- Q: What does building HVAC include?
- Warm, including heating equipment, materials, accessories; including ventilation and air conditioning. Indoor heating pipe and accessories installation; indoor heating aids and radiators and metal radiator board; indoor heating aids and radiators and metal radiator installation of low temperature hot water floor radiant heating system installation; boiler installation works; boiler auxiliary equipment installation; Pipe installation and installation; ventilation installation: air duct and accessories production; duct system installation (send, exhaust, smoke, dust removal system) duct components and muffler production; send exhaust system; smoke control system ; Dust removal system; air conditioning system; clean air system; refrigeration control system; air conditioning water system.
Send your message to us
Air Diffusers Air Flow Vent for Ceiling
- Loading Port:
- Ningbo
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 100 pc
- Supply Capability:
- 999999 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords