• adjustable screw jack base u head for scaffolding System 1
adjustable screw jack base u head for scaffolding

adjustable screw jack base u head for scaffolding

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
10000 pc
Supply Capability:
10000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

Brand Name:

wst

Model Number:

30mm



material:

Q235

surface:

silver painting

length:

600mm

parts:

scaffolding parts

sort:

jack base/u head

jack nut:

0.25kg

base plate:

120*120*4mm

payment terms:

tt/lc

tensile load:

140-200kn

packing:

in steel pallets





Packaging & Delivery

Packaging Detail:packded in pallet of in bulk
Delivery Detail:7-15 days

Specifications

1. Dia 28/30/32/34/35/36/38/40mm 
2.Len:300-1000mm 
3.Mat:Q235 
4.Sur:black,EG,HDP 
5.100% export to the world

Basic Information


Product/Service (We Sell):Adjustable Scaffolding Jack Base,Tie Rod  

Number of Employees:51 - 100 People  

Trade & Market


Main Markets:Eastern Europe
Oceania
South America
North America
Eastern Asia
Mid East
Africa
Southeast Asia

Total Annual Sales Volume:US$2.5 Million - US$5 Million  

Export Percentage:91% - 100%  

Factory Information


Factory Size (Sq.meters):10,000-30,000 square meters  

Basic Information


Product/Service (We Sell):Adjustable Scaffolding Jack Base,Tie Rod  

Number of Employees:51 - 100 People  

Trade & Market


Main Markets:Eastern Europe
Oceania
South America
North America
Eastern Asia
Mid East
Africa
Southeast Asia

Total Annual Sales Volume:US$2.5 Million - US$5 Million  

Export Percentage:91% - 100%  

Factory Information


Factory Size (Sq.meters):10,000-30,000 square meters  


Q: Fastener type steel pipe scaffold composed of components
Rotating fasteners, connecting rods, pedals (steel pedals, bamboo pedals can be), the extension of the extension of the galvanized steel pedal easy to use
Q: I couldn't believe it, but yes it happened...
yea I can believe that. There have been people who have survived jumping out of planes at ten thousand feet. One guy landed in a snow bank and I think another hit a tree and I guess it was some kind of pine and the branches slowed him down.
Q: I am currently taking early childhood care education as my college major. I am learning about ZPD (Zone of Proximal Development), and scaffolding the the development in early childhood.How would you explain, and define scaffolding
Scaffolding basically means being the support (a scaffold is a support) in the child's learning. A preschooler can do a range of things. He or she will have mastered some things already and there will also be things that are beyond what he or she can do. When playing with the preschooler, you want to make sure that what's going on falls in that range (zone of proximal development). Don't give him or her something that's too easy or too hard to do, but play games that make them think a little and use what he or she already knows to take it a bit further. I hope I'm not confusing you more. In one sentence..scaffolding is supporting the child in learning something new based on what they already can do or know.
Q: What are the main safety problems when dismantling the scaffold
1, all the rods and fasteners in the demolition of the separation, not on the rod attached fasteners or two rods connected to the ground.2, all the feet of the hand, should be erected from the outside of the handle, in order to prevent the feet and garbage from falling.
Q: Find the demolishing scheme of scaffold
Removal methodThe development of the demolition plan, the program should include the removal of the steps and methods, safety measures, etc.. Demolition order should be observed from top to bottom, the first after the demolition, after taking the first demolition principle. That is, first remove the railings, scaffolding, scissors support, diagonal bracing, and then small beams, large cross bars, vertical poles, etc., and according to the principle of one step clear in order to be prohibited from top to bottom at the same time the demolition work. Remove the shelf of the high-altitude personnel should wear safety helmet, safety belt, wear soft shoes on the shelf, at the same time, around the railing or set up a warning sign and a special command, in order to avoid casualties.
Q: What are scaffold spanners used for?
Ratchet Podger Spanners...Aluminium Scaff Spanners Spanners are wide wrenches that are made from durable metals. Spanners are made specifically for scaffolding and are designed to fit into the tool belt nicely. Spanners are very useful for a number of jobs and are often used along with other scaffold tools on a safety lanyard to prevent dropping the tool to the street below. Spanners work the same as traditional wrenches but like many scaffolding tools are made with a hole in the end of the wrench for the safety strap to be inserted through. Stainless steel and aluminum are the most commonly used metals for spanners to ensure durability even if the item is dropped from high.
Q: hi, i already have my cartlidge pierced on my right ear and thinking about getting a scaffold piercing on my left ear. will a scaffold piercing hurt more than my cartlidge piercing,,less,,or about the same???thanks answers apprecietedhope =] xx
Several people have told me it hurts about the same. I do not have one, sorry couldn't be more help than that.
Q: THIS METAL SCAFFOLDING IS CONNECTED TO EARTH.Need 2 more questions to be answered:1.Is he going to be electrocuted if he wasn't holding the metal scaffolding?2.will the current flow through him or through the wire in both cases?
I'll assume you mean a LIVE wire, AC. 1. If there is no connection to ground at all, NO. Birds can sit on live wires. 2. The current will flow from wire through body and scaffold to ground, then from ground through scaffold and body to wire, reversing at a rate of 60 times per second (America). Depending on the voltage on the wire, that person will most likely die or even be burned apart.
Q: A 520 kg box sits 1.4 m from the left end. What is the tension in the right hand side wire? (g = 9.8 m/s2) ____________ Newtons
Because the scaffold is not moving, we can assume that the net Torque acting on the scaffold equals zero. Net Torque = 0 torque = Force x distance (d) Use the left end of the scaffold as the center point. This will eliminate the Torque caused by the left wire (d = 0, so torque = 0) There are now three forces creating torque on the scaffold. There is the weight (m x g) of the scaffold, at 3.5m from the left end. m1 x g x 3.5m There is the weight of the crate, located 1.4m from the left end: m2 x g x 1.4m These two torques are countered by the torque caused by the Tension (T) of the right wire, located 7m from the left side. T x 7m The sum of these torques is zero. (T x 7m) - (m1 x g x 3.5m) - (m2 x g x 1.4m) = zero solve for T T = ((m1 x g x 3.5m) + (m2 x g x 1.4m)) / 7m T = ((115kg x 9.8m/s^2 x 3.5m) + (520kg x 9.8m/s^2 x 1.4m)) = 1.58 x 10^3 N Hope this helps.
Q: along with this question, -what does she think about during this time period?-how does she apprear on the scaffold? -who does she see and how does she feel?THANKS!!=]
Read the book and find out! I think she's up on the scaffold sometime in spring, but as I said, READ it and make sure.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords