• Adjustable scaffolding pipe screw jack base System 1
  • Adjustable scaffolding pipe screw jack base System 2
  • Adjustable scaffolding pipe screw jack base System 3
  • Adjustable scaffolding pipe screw jack base System 4
  • Adjustable scaffolding pipe screw jack base System 5
Adjustable scaffolding pipe screw jack base

Adjustable scaffolding pipe screw jack base

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
500 pc
Supply Capability:
10000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specification

Standard:
BS1139,EN74
Place of Origin:
Shandong China (Mainland)
Weight:
3.30-6.20kg or customized
Plate size:
135*135*5mm or customized
Item:
Adjustable scaffolding pipe screw jack base
Surface Treatment:
Zinc Plate ,Hot Galvanized
Material:
Q235
Model Number:
SD-2003
Brand Name:
SD
Tube Dia:
35mm or customized

Adjustable scaffolding pipe screw jack base

Product Description

  

Type: HOLLOW – made of Tube .   Available in Sizes:780 MM 650MM 600MM

It has a solid stem of 35 mm diameter / 38 mm Hollow Tube which has a nut restraint to ensure the stem always has a minimum engagement into the standard of 135/150 mm

 

 We can supply different designs of Pipe screw jack base :

ImageModelItemSizesurface
2003aSD-2003APipe Screw Jack Base

Length:610/910/1520mm

Dia:35mm

Plate size:135*135*5mm

electroplate,hot dip galvanized
2003bSD-2003BPipe Screw Jack Base

Length:610/910/1520mm

Dia:35mm

Plate size:135*135*5mm

electroplate,hot dip galvanized
2003cSD-2003CPipe Screw Jack Base

Length:610/910/1520mm

Dia:35mm

Plate size:150*150*5mm

electroplate,hot dip galvanized
2003dSD-2003DPipe Screw Jack Base

Length:610/910/1520mm

Dia:35mm

U size:100*150*5mm

electroplate,hot dip galvanized

 

Our Services

  

 Our Main Manufacturing

 

(1)   Scaffolding System: 

 

Including Ringlock Scaffolding System and accessories; Cuplock Scaffolding System and accessories; Kwikstage Scaffolding System and accessories; Haki Scaffolding System and accessories;

 

(2)   Scaffolding Frame & Accessories:

 

Including Walk Through Frame Scaffolding; Ladder Frame Scaffolding; Accessories; we also can make scaffolding according to your samples or drawings.

 

(3)   Scaffolding Couplers/Clamps:

 

We can produce all kinds of forged and pressed couplers, including British type couplers, American type couplers, German type couplers, Italian type couplers ,fence couplers, BRC coplers and so on. We also can produce according to your drawings or samples.

 

(4)   Formwork System Scaffolding & Accessories:

Light Duty Shoring prop and Heavy Duty Shoring Prop; Wing nuts and Tie rods; RASTO clamp and so on.

 

Production Process

Adjustable scaffolding pipe screw jack base 

Our Certifications

Adjustable scaffolding pipe screw jack base 

 

 

Company Information

  

  Our Company Introduction

 

We have more than 10 years experience in Scaffolding production and have a good reputation in this field. More than 90% of our products are export to Western Europe, Northern Europe, North America, South America, Australia. Hope we can establish longtime cooperation. 

 

Factory View

Adjustable scaffolding pipe screw jack base 

Certificates

3 (1)



Q: I'm gonna be getting piercings this weekend, so i know im already getting my nose. but i want to get my ear. like barbell? so what's the difference between Scaffold and Industrial?
I agree with A Silent Reminder - They're the same thing, just called something different in different places. I find that people in the U.S call it an Industrial, and those in England call it a Scaffold.
Q: What are the functions and requirements of the masonry wall
4, we must attach great importance to a variety of structural measures: scissors, pull nodes, etc. should be set according to requirements.5, the level should be closed: the first step, every step or two, covered with planks or hand foot fence, scaffolding to laying along the long, joints should be overlapped in the small bar, do not appear short board. And in between in the pole and the wall every four steps long laying safety bottom fence.
Q: Specification for construction steel pipe scaffolding and construction safety rules?
Scaffolding specification 1Safety code for scaffold construction:Section 1 fastener type steel pipe scaffoldSpecification for scaffolding, scaffold construction scheme, door type scaffolding specification, door type scaffolding construction scheme, mobile scaffolding specification,This technology is applicable to a set of steel pipe fastening structure as the main body, to make bamboo scaffolding outside the fence.
Q: opinions on scaffolding piercing and how to hide it from school :)?
While they're healing, they need to stay in so there's no way of hiding it. Wait until the beginning of the summer and get it done then
Q: What are the characteristics of Pankou scaffolding
Pankou scaffold has the advantages of low cost and high efficiency of the hitherto unknown advantage. Comprehensive consideration of the company's future worries, no need to worry too much about frequent accidents, high cost of substantive issues.
Q: For indoor use of mobile scaffolding safety construction plan! Four support points with four pulleys with brake!The construction scheme of scaffolding safety belt for indoor high Jiqiu braking pulley, for about 12 meters of buildings, indoor emergency please heroes!
All kinds of scaffolding engineering construction programGeneral requirements for 5.2.1 scaffolding settings and use general requirements for scaffold framing and setting requirementsThe design of the frame of the scaffold shall take full account of the requirements for the use of the project, the various conditions and factors for its implementation, and shall comply with the following requirements:Frame dimensions
Q: Topic?Scaffolding construction program how to doSpecial construction scheme
Full support calculation method:1, determine the above line load (ie, the length of a variety of meters, take the maximum);2, to determine the bearing capacity of the foundation (through the strengthening of the bearing capacity);3, according to the bearing capacity of the foundation, about how many square meters per square meter to determine the vertical tube, assigned to specific point load;4, to determine the number of tons of vertical pipe can be per ton (according to pipe diameter, wall thickness calculation of allowable stress);
Q: In the calculation of the bearing capacity of the scaffold, what is the axial force produced by the "N g2k" - the standard value of the component?The calculation formula for force rod scaffold N/ psi A+Mw/W = fWhere N=1.2 (Ng1k+Ng2k) +0.85*1.4 Sigma NqkThe specification of N g2k is explained in terms of the axial force generated by the standard values of the component fitting,It is how to understand, specifically refers to what? That is to say, what is the standard value of the component?Please master all trouble, thank you generous with your criticism!
(3) the railings and retaining scaffold deadweight standard value (kN/m); the railings, bamboo amphipodsshouban baffle, the standard value of 0.15NG3 = 0.150 x 7 x 1.500/2 = 0.788 kN;(4) the load of the hanging safety facilities, including safety net (kN/m2); 0.005NG4 = 0.005 x 1.500 x 24 = 0.180 kN;
Q: Bowl buckle type steel pipe scaffolding should set up a few people
The utility model relates to a bowl buckle joint which is composed of an upper bowl buckle, a lower bowl buckle, a cross bar joint and a limit pin on the upper bowl buckle. A limiting pin is arranged on the vertical rod to weld the lower bowl buckle and the upper bowl buckle. Welding plug on the bar and the diagonal bar. When the utility model is assembled, the transverse rod and the inclined rod are inserted into the lower bowl buckle, and the upper bowl buckle is pressed and rotated.
Q: ..or anytime around whenThe Scarlet Letter was written.I am doing a paper on why the three scenes at the scaffold were so significant.So I decided to include the history of scaffolds, but I can't seem to find any information on them.help please? :]SOURCES..if possible! :]
Mostly the person would be taken onto the scaffold , a rope fixed around their neck, and then the trap door would open and they would drop through and choke to death , very rarely did the neck break in those days , so relatives and friends would pull on the legs , thus to speed up death. Earlier in history people were strung up from trees , and sometimes stood in the back of a cart which was driven away leaving them dangling. The platform on which the guillotine was stood was also called a scaffold at times. These executions were turned into social events and hundreds of people used to go to look.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords