8ton tower crane Q6513 QTZ125 high quality
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 2 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Feature: Tower Crane
Condition: New
Application: All construction projects
Max. Lifting Load: 8tons
Max. Lifting Height: 161.8m
Span: 65m
Place of Origin: China (Mainland)
Brand Name: CNBM
Model Number: Q6513
Certification: CE&GOST
Warranty: 12months
After-sales Service Provided: Overseas service center available
Main Features
1)TC6513 tower crane is one of the key product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected; The max. attached height can reach 180m.
3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
The range-change structure drives the dolly to change range on the horizontal arm, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.
4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.
5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.
Product Picture
Parameter List
with CE, Russian GOST and ISO9001 certificate.
Model: Q6513 (QTZ125)
Max. Load: 8t
Working Range: 65m
Tip Load: 1.3t
Model Q6513 (Topkit Tower Crane(QTZ125))
Jib length 65m
Free height Stationery 53.8m
Traveling 58.7m
Climbing 44.7m
Max. Load 8tons at 3.1 - 13.33m
Tip Load 1.5 tons at 60m
Mast Size 2x2x3m (L68A1)/1.6x1.6x3m(l46A1)
Counter Jib 14.5m
Work Range 3.1m - 60m
Max. Height 182.8m/137.8m
Type Stationery/ Undecarriage/ Travelling/ Inside Climbing (Optional)
Standard Mechanism Hoisting 70RCS25
Trolleying X96L
Slewing RCV95
Traveling RT324
Frequency Mechanism If you need frequency control, please directly tell us.
Power 380V/50Hz 440V/60Hz
Packaging & Shipping
All our packing ways are standard packing. In wood case or carton, as you like. After the production, we will do our best to do the shipping as soon as possible. Best Service is our sart of business.
Our Services
1.We can make special sample according to the customer’s requirement.
2. We have more than 60 professional technical team, provide best after-sales service
3. Fast delivery time
4. We have CE, ISO9001 and GS certification.
- Q: Method for operating tower crane
- 2.21, drivers must pass the escalator up and down, up and down the escalator, hand tools are prohibited items.2.22 do not drop any objects from tower cranes or defecate.2.23 winter in tower crane operating room heating, should be taken to prevent electric shock and fire measures.2.24 any tower crane with an elevator must comply with the instructions in the elevator manual. No overloading or violation of the operating procedures.2.25 multi machine operation, should avoid two or more than two tower cranes overlap in the radius of rotation. Special circumstances, need to overlap operations, must be safe distance between the vertical arm to ensure the safe distance and the lifting of materials, and have reliable safety measures approved by the competent technical leadership before construction.2.26 jib cranes in heavy lifting off the ground after lifting, rotating and walking three actions can be done at the same time, but the amplitude only alone, strictly with variable load. A crane that allows variable amplitude loading shall not vary at full load or near full load.2.27 lifting hoist is not installed in the rotating part of the crane, lifting operations may not continue in one direction continuous rotation.2.28 a crane with a mechanical torque limiter must adjust the tonnage indicator of the overload limit device according to the radius of gyration and the rated load at that radius.2.29 bend rail subgrade must comply with the provisions of the crane should turn on the outer rail surface of the sand, rail, rail and wings painted with grease. The counterweight box shall be turned to the direction of the outward turn. It is strictly prohibited to do lifting or turning on heavy roads.
- Q: It seems like every time I turn on the news there is another crane collapse. I don't know if it is the same problem every time, but it seems awfully suspicious. Does anyone know why crane collapses seem so common lately? Has it always been this way?
- You okorder .. This chart is not definitive, it leaves out many occupations (such as mining), it only considers fatalities (not loss of limbs, etc.) but it conveys the general picture. For hard data look at: www.bls /iif/
- Q: the red badge of courage, a novel about the civil war, the verb wrote is A) transitiveB) intransitive
- Transitive - because it has an object The Red Badge of Courage. . Generally, if you can put the word something after a verb, it is transitive. Stephen Crane wrote something .
- Q: I have this assignment to find out how a climbing crane is able to move up the building as construction continues.
- They add extra stages from the bottom. A tower crane is erected from a boom assembly, first and second tower sections of different cross section, and a base in a sequence of steps in which the boom assembly is mounted on a hollow climbing section dimensioned to be received in each of the larger second tower sections and defining a cavity dimensioned to receive each of the first tower sections. One of the latter is secured on a base in upright position, and the upright section is received in the cavity of the climbing section which is then raised relative to the first section and enveloped by one of the second sections. The enveloping section is secured to the base and the raised climbing section for supporting the climbing section whereupon the first tower section may be released from the base, raised, and secured to the second tower section. The climbing section may then be raised relative to the first tower section to permit the installation of another second section, and the procedure repeated, until all second or larger tower sections are superimposed on each other, the one first section being ultimately attached to the topmost second section. When the climbing section is raised relative to the attached first section, another first section may be superimposed on the one first section and the procedure repeated until the slimmer portion of the tower is assembled from superimposed first sections. Ultimately, the boom assembly is attached to the topmost first tower section, and the climbing section may be removed or stored for further use on the wider, lower tower portion.
- Q: i am looking for the schematic wiring diagram for GANTRY CRANE AC GENERATOR. thanks a lot
- it sounds like you want to run a gantry crane with a generator the generator should have a wire diagram in side the cover. the gantry crane should have the power requirements on the electric motor there should be a tag on the motor. If you are not sure then you need to get an electrician out there to look at the two components and should be able to get you straight
- Q: Today, my boyfriend surprised me with an origami bird he'd made for me the night before, just for no reason. He told me he'd tried to make a crane but it got to be to complicated. I thought an was an incredibly sweet gesture, and I thanked him thoroughly. I was wondering if it would be nice to give him an origami something back? I found a really easy video on how to make cranes and I made one, but I don't want it to seem like I'm trying to show him up, I just want to show my gratitude. Would it be best to give him the crane, give him a different origami animal, or just let the whole thing go? Sorry if it seems like I'm over thinking this, I just really like him :)
- let the whole origami thing be his thing big mistake to give him the crane
- Q: What should the sub contractor do before the installation of the bridge crane in the workshop?
- Baidu search [tower crane tower demolition, lowering section safety technical disclosure]. If it is installed, remove the "two words" to "installation", and other contents are adjusted slightly.
- Q: Lifting mechanism in tower crane: M5. Luffing mechanism: what does "M4" mean? Seek expert answers
- Lifting mechanism in tower crane: M5. Luffing mechanism: M4 is the working system
- Q: What are the requirements for jack up and plus section of jack up tower crane?
- Shall conform to:1, tower crane has not reached the standard free height or attachment, not to the standard suspension height;2. The standard section of tower crane jacking must be the size of the original production;3, tower crane jacking work must be carried out by the professional installation team;4 tower crane jacking up, the wind must be less than four.Answer the 1 floor:The height of the self elevating tower crane is built up by other cranes like building blocks.
- Q: my sister would like to know this for some strange and bizzar reasion
- It depends on how many people are making them. Depending on skill it takes about 2-5 minutes to make a crane. If you dedicate 5 hours a day that makes 7-50 days if one person is making them. Cranes are often made for memorial. It is a Japanese tradition, especially for Hiroshima. You make 1000 cranes as a memorial for the lost lives. She should definitely get her friends to help.
Send your message to us
8ton tower crane Q6513 QTZ125 high quality
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 2 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords