• 8TON TOWER CRANE Q4525 QTZ125 HIGH QUALITY System 1
  • 8TON TOWER CRANE Q4525 QTZ125 HIGH QUALITY System 2
  • 8TON TOWER CRANE Q4525 QTZ125 HIGH QUALITY System 3
8TON TOWER CRANE Q4525 QTZ125 HIGH QUALITY

8TON TOWER CRANE Q4525 QTZ125 HIGH QUALITY

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
2 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

Quick Details

  • Feature: Tower Crane

  • Condition: New

  • Application: All construction projects

  • Max. Lifting Load: 8tons

  • Max. Lifting Height: 161.8m

  • Span: 45m

  • Place of Origin: China (Mainland)

  • Brand Name: CNBM

  • Model Number: TC4525

  • Certification: CE&GOST

  • Warranty: 12months

  • After-sales Service Provided: Overseas service center available

 

 

Main Features

 

1) TC4525 tower crane is one of the key product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

 

2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected; The max. attached height can reach 180m.

 

3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

The range-change structure drives the dolly to change range on the horizontal arm, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.

 

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

 

5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.

 

Product Picture

 

8TON TOWER CRANE Q4525 QTZ125 HIGH QUALITY

8TON TOWER CRANE Q4525 QTZ125 HIGH QUALITY

8TON TOWER CRANE Q4525 QTZ125 HIGH QUALITY

8TON TOWER CRANE Q4525 QTZ125 HIGH QUALITY

 

Parameter List

 

with CE, Russian GOST and ISO9001 certificate.
Model: Q6513 (QTZ125)
Max. Load: 8t
Working Range: 45m
Tip Load: 2.5t
Model: Q4525( Tower Crane(QTZ125))
Jib length 45m
Free height Stationery 53.8m
Traveling 58.7m
Climbing 44.7m
Max. Load 8tons at 3.1 - 13.33m
Tip Load 2.5 tons at 45m
Mast Size 2x2x3m (L68A1)/1.6x1.6x3m(l46A1)
Counter Jib 14.5m
Work Range 3.1m - 60m
Max. Height 182.8m/137.8m
Type Stationery/ Undecarriage/ Travelling/ Inside Climbing (Optional)
Standard Mechanism Hoisting 70RCS25
Trolleying X96L
Slewing RCV95
Traveling RT324
Frequency Mechanism If you need frequency control, please directly tell us.
Power 380V/50Hz 440V/60Hz

 

 

Our Services
 

 1.We can make special sample according to the customer’s requirement.
2. We have more than 60 professional technical team, provide best after-sales service
3. Fast delivery time
4. We have CE, ISO9001 and GS certification.

 

 

Q: What material are the Samson & Goliath cranes in Belfast made from?
They are cranes look at the YouTube video and read up on cranes that's what material they are made of.
Q: How come you never see cranes being transported from one site to another?
because they move so slow its hard to tell if there moving or not.
Q: ok so i have to us my phone so just give me instructions no links no youtube videos cause my phone cant support them and my phone may not be able to load some of the links
You are asking for a lot but I have seen you request this a number of times, so I will do it...a sucker born. 1. Valley fold the paper in half so it makes a triangle. With the long side held away from you, valley fold the triangle in half again. 2. Lift the top triangle and valley fold it so that its top point meets its bottom point. Unfold the crease you have just made. Put your fingers inside the top triangle, open it up, and flatten it so it forms a square. Turn the paper over and fold and flatten the remaining triangle in the same way. 3. Make sure that the open ends of the paper are pointing down. Valley fold the top layer of both sides in to meet the centre crease. You will now have a kite shape. 4. Valley fold the top point of the kite down and crease well. Unfold the crease you have just made. 5. Open the sides of the kite by unfolding the flaps you made in Step 3. Lift the top layer of the kite's bottom point up so the paper bends at the crease you made in Step 4. Push the outside edges of the paper in to meet the centre line. Then flatten the figure so that you have a long diamond shape. 6. Turn the figure over and fold a kite shape on the remaining side as in Step 3. Repeat Steps 4 and 5 on this side. You will now have a two-sided long diamond. The bottom half of the diamond is split in two. 7. Valley fold the top layer of both bottom edges in to meet in the middle. Turn the figure over and repeat on the other side. 8. To make the crane's neck and tail, valley fold each half of the bottom section out to the sides. Crease well. 9. Unfold the right crease you just made and make an inside reverse fold. Repeat this step on the left side. 10.To form the head, fold down the end of the neck. Unfold this crease and inside reverse fold the head. 11.Hold one of the crane's wings in each hand. Blow hard into the opening on the underside of the figure and gently separate your hands. You crane will puff up and be ready to hang.
Q: What is a typical hourly wage, and what kind/how much training is required? Is there a special certificate that you have to get, sort of like a driver's or pilot's license? Does it vary much depending on what type of crane (track crane vs. tower crane)?
Before you can operate a crane, you have to possess a trade certificate from a licensed agency. And before you got one, you have to undergo training and it depends on the extensiveness of the program of a licensed agency. the trade certificate is like a license, it has range of machines which you can operate with once license. Salary differs and it is based on hazards of work. A typical example is the crane operator in construction of Burj Tower. Being on the top of the building is not an easy job so the operator will likely receive salary more than a crane operator who is working in a typical high rise building.
Q: so yeah i know that cranes do the main work but i guess there are no such really toll cranes to do that with skyscrapers ?
That is a good answer. Ordinary cranes build the steel frame to a height of perhaps 60 feet. The frame is designed so a specially designed crane can climb up the side (like climbing a ladder) to about 50 feet where the climbing crane can complete the frame to about 100 feet, then the crane can climb to the 90 foot level and build the frame to about 150 feet etc. Another method is the floor at about the 60 foot level is completed and extra strong. A crane is assembled on that floor and can complete the steel frame to about 100 feet where another extra strong floor is built. The crane at 60 feet is then dismantled and moved to the floor at the 100 foot level, or perhaps this is a second crane. Repeat until the full height of the building is frame work. As cranes are removed at the lower levels, more floors can be installed and some of the finishing work done. Either way, you can see why very tall buildings are very expensive. Likely both methods are used for some very large and very tall buildings. Neil
Q: I looking for information on the surname Crane.?
The meaning of the surname CRANE is - dweller at the sign of the crane; one who lived near the crane river in England; a tall, thin man with long legs.
Q: i have 5 tower cranes outside my window at different construction sites and they all position their cranes the same direction at the end of the day. is there a reason for this.
I can think of a few reasons. The first 2 are safety related, the 3rd is work-efficiency related. 1. To minimize wind loading for the expected wind-direction overnight. 2. To minimize damage to the surrounding area should a failure happen and a crane fall (similar to felling a tree in a forest so it falls in the direction the lumberjack wants it to fall). 3. To leave the boom over the worksite for the next morning's first pickup (so, it would be a coincidence that all the pickup sites were at the same angle relative to the booms). .
Q: is this a grey crowned crane?
yes it has to be
Q: when do i start bernie cranes missions gta 4?
you don't unlock the Bernie Crane Missions until you complete Weekend at Florian's for Ray Boccino. The first Bernie Crane mission is called Hating the Haters where you have to run with Bernie in the park and kill the guy that's been harassing him.
Q: how do they erect those large tower cranes you see on big building projects?
A tower crane is usually assembled by a telescopic jib (mobile) crane of greater reach (also see self-erecting crane below) and in the case of tower cranes that have risen while constructing very tall skyscrapers, a smaller crane (or derrick) will often be lifted to the roof of the completed tower to dismantle the tower crane afterwards

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords