7T Stone loading special forklift-CPCD70S
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Model | Unit | CPCD70S |
Rated capacity | Kg | 7000 |
Load center distance | mm | 600 |
Axle loading laden (front/back) | kg | 14630/2610 |
Axle loading unladen(front/back) | kg | 3780/6400 |
Max travel speed(laden/unladen) | km/h | 25/27 |
Min turning radius | mm | 3500 |
Min Working aisle | mm | 3200 |
Max pull force | N | 58000 |
Max gradeability | % | 20 |
Max lifting speed(laden/unladen) | mm/s | 380/340 |
Falling speed (laden) | mm/s | ≤600 |
Overhead guard height | mm | 2510 |
Mast height | mm | 2585 |
Overall dimensions(LxW) | mm | 5180x1995 |
Free lift height | mm | 155 |
Height (overhead guard to seat) | mm | 1045 |
Max working height | mm | 4130 |
Fork size(LxWxH) | mm | 1370x150x70 |
Front tyre | 9.00-20-14PR | |
Rear tyre | 8.25-15-14PR | |
Min ground clearance(mast) | mm | 235 |
Tread(front/rear) | mm | 1470/1500 |
Engine model | XICAI6110 | |
Engine rated output | kw/rpm | 83/2000 |
Engine rated torque | N/rpm | 450/1450 |
Engine displacement | l | 7.127 |
Stage changeover type | mechanical/electric and hydraulic control | |
Hydraulic system working pressure | Mpa | 20 |
Gear pump model | CBFT-G425ARK1-A | |
Fuel tank capacity | 150 | |
Tyre | Mpa | 0.83 |
N.W | kg | 10200 |
- Q: well my work has a huge 10,000 pound piece of machinery...and i know people can donate cars and boats and what not as a tax write off so, where could we donate this big hunk of machinery?
- Call a metal recycling place. They would be happy to come get it and turn it into scrap. They would even pay you for it.
- Q: Thus increased unemployment. Would these changes in unemployment be considered increases in full employment underemployment or recessions? If you said the former, which sector of unemployment (frictional, structural, cyclical) increased?
- This would be an increase in structural unemployment. It cannot be recessionary, because it says nothing about a decrease in output below full-employment level. It is not frictional, which relates only to the time delay between when someone is unemployed and when they get a job that is available and that they are qualified for. It would be structural, as the structure of the economy has changed. The people have skills for jobs that are no longer available, but not for the jobs that replaced them: jobs relating to the production and distribution of the new farm machinery. In the sense that there are fewer of these new jobs than there were of the old jobs, then the natural rate of employment would decrease by the difference in available jobs.
- Q: it should be 150 words and required within 24 hrs
- Required? You're bossy. And your question is incomplete. What you mean to ask so you can finish your assignment is How is the basic machinery of organelles and cytoskeleton system that all cells share then regulated and enhanced to achieve this astonishing diversity? Again, I direct you to this site to help you finish your homework.
- Q: How to make the process flow of welding operation of construction machinery
- The process of engineering machinery welding operations generally include the following: 1, material: welding materials; 2, breach: according to the requirements of the drawings breach; 3, cleaning, polishing: degreasing oxide, general joint 15cm to clean up; 4, according to the drawing requirements: spot welding welding assembly;
- Q: Who can introduce the famous domestic machinery enterprises?!
- 1, Xuzhou Heavy Machinery Co., Ltd. is the largest professional engineering machinery manufacturing enterprises. 2 China's largest mining machinery manufacturer is CITIC Heavy Machinery Company, CITIC Heavy Machine, the original Luoyang mining machinery factory.
- Q: Its for a Geography Flyer on Arable farmingAll info will be gladly received Thank-you
- Machinery to plant, fertilize and harvest crops.
- Q: Hi,Do you know where can i download the book 'Electrical Machinery by FITZGERALD 'thank yahoo for this service and thank you!
- Due to copyright laws, very few books are available free. This book can be purchased at Amazon for $160. Alibris sells it for $122.
- Q: Senator Barack Obama has grown from not known at all to well known in a relatively short time frame. He has come up on the rough side of the mountain to claim the front runner status. He has a wildcard of a chance to beat out two well known candidates. Senator Clinton and John McCain.Amazing journey.
- Not really look who he is running against. Nobody wants the Clinton's in office again so the people vote for someone else McCain is two faced, a Democrat posing as a Republican So you have all parties switching, Dems for McCain Rep. for Obama and then the Independents who will most likely do the choosing for the next president
- Q: What large-scale machinery and equipment are needed for civil construction?
- Earthwork: the need for excavators (shovel, backhoe), loader, dump truck,...... Such as: concrete straightening machine, steel cutting machine, steel bending machine, welding machine, electric saw, concrete mixer, concrete tanker, pump truck, crane, tower crane,...... Etc;
- Q: how do i find machinery to produce box sealing tape?
- Here okorder / You can search their site for the machinery, but I would call them and speak to a salesman instead. Even if they don't have it in stock, they may have a link on where to get it. I would also do a save search on OKorder for tape machinery or something of that nature. The save search service will email you when someone lists your item. I'm assuming you're looking into producing tape to sell.. if you're just looking into cheap ways to seal boxes in your business, then you can get paper tape machines that wet a pre-adhesived tape. It also cuts it to the desired length. These should be available at major office or warehouse supply retailers.
Send your message to us
7T Stone loading special forklift-CPCD70S
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords