Radient Heat

Hot Products

FAQ

What are the equipment for the recirculating aquaculture system and which ones have their own design and production capacity?
Many of the environmental protection has its own design and production capacity
To warm the company which installed the best
To warm is a complex system, the installation of a large number of components to choose, even if the product quality is good, but the performance of lamb bite to find the rescue is to find that if the installation is not in place or very easy to problems, or to the old, professional big company There is a guarantee.
Precipitation of pulverized geothermal cleaning machine
1, pulse cleaning machine is a high-pressure gas-water mixing equipment, the body parts are strictly prohibited twist, or easy to produce leakage leak phenomenon, man-made machine failure. 2, air compressor boost is relatively slow when you can determine the air compressor piston ring need to be replaced. The expansion of the piston and the cylinder gap of the air compressor will cause the air compressor lubricating oil to flow into the tank and convey it to the pulsator via the gas tank, possibly causing the pulsator intake control device to fail. At this point need to clean the intake control device. 3, had to use the ground drain direct sewage will be sewn off the hook burst of feedback. It is therefore strongly recommended that the sewage sludge be used to prevent contamination of the environment or to cause damage to the quality of the drainage system. 4, cleaning, such as the discovery of poor sewage, should immediately stop the intake air, remove the solid impurities before they can continue to clean. 5, pulse generator, if gas, water leakage, please stop working, please contact us for maintenance. 6, winter construction, in order to prevent the process of outdoor transport within the machine pipe fittings freeze, please after the completion of the washing machine will be clean water inside the sweep; summer construction, because the air humidity, the machine internal pipeline may occur condensation Water out, this is a normal phenomenon. 7, during the winter heating heat, the ground needs 1-2 days of heat storage and heating process, geothermal return pipe will not immediately heat, should be explained to the customer.
How to build electric heating
To see what you want to do there are electric film and heating cable two if you want to do electric geothermal can find our company Tianmei Technology Development Co., Ltd. wholeheartedly at your service
Radiator parallel system how to take pictures
The installation of the radiator is divided into two forms: the installation and installation of the radiator. The installation steps include the installation of the pipe, the installation of the radiator, the installation of the boiler, the pressure test and the customer acceptance. Trouble, need to slot and install the set of water, for the decoration of the housing, the general choice to install the radiator, installed both convenient and not damage the indoor decoration effect. 1. Laying the pipeline in advance with the customer to communicate with the location of the radiator after the installation of the need for the layout of the pipeline, the pipeline is generally in the ceiling, baseboard and other hidden places, the laying of the tube as much as possible not to affect To the interior decoration or take up too much space. 2. Install the radiator in the process of installing the radiator to the radiator to be stable, and to use the level of measurement to see if the installation is smooth, and then the valve connection and inlet and outlet valves connected, after checking the correct The pipe clamp is reinforced. 3. Installation of the wall-mounted boiler The installation of the boiler should be noted that with the open line and electrical equipment separated from the flammable and explosive materials can not be on the hair to promote the safety of the body, Table and gas stove should be more than 300mm distance. 4. Stress test and customer acceptance Construction workers in the pipe stamping test when there is no run, run, drain, drop and other phenomena, confirmed by the customer after the inspection can be accepted.
To warm or water pipe leakage from the time of the warranty period
I heard that do not repair.
Electric heating furnace in the resistance wire and magnet wire which is a good power saving it
Resistance wire high thermal quality, power saving and durable wire
Composition of solar heating composition
Solar heating equipment, the main components: solar collectors (flat solar collectors, all-glass vacuum tube solar collectors, heat pipe solar collectors, U-tube solar collectors, etc.), storage tanks, control systems, Pipe fittings and related accessories, building the end of the cooling equipment and other components.