wpc decking outdoor, recycled material waterproof Cheap Composite Decking
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 200 m²
- Supply Capability:
- 2000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Main Features of the WPC Decking:
1. Recyclable, Eco-friendly, saving forest resources
2. With the look of the natural wood, but less timber problems
3. Moisture/water resistant, less rotten, proven under salt water condition
4. Barefoot friendly, anti-slip, less cracking, less warping
5. Requires no painting, no glue, low maintenance effort
6. Weather resistant, suitable from minus - 40 to 60 centigrade degree
7. Termites and insects resistant, and moldy-proof
8. Easy to install and clean
Specification of the WPC Decking:
component | 30%HDPE(Grade A Recycled HDPE) 60%bamboo/wood fiber component 10%chemical additives New material capped outside |
Size | 140X20mm |
Design | Solid decking |
Length | 2.9m/pc standard length, also from your required |
Surface treament | original, sanded, brushed |
Color available | 5 regular colors for choice ( IPE,Walnut,graystone,Cedar,Rosewood) and we can adjust the new color according to the order requirement |
Cerfiticate | ISO9001, ISO14001, CE, FSC Certificate,"REACH"Test Reports by SGS; Intertek Test Report by ASTM standard..etc. |
Images of Co-extrusion WPC Decking:
FAQ of Co-extrusion WPC Decking :
1. Available Colours?
5 regular colors to choose ( IPE,Walnut,graystone,Cedar,Rosewood )
2. How to Install?
3.Treatment for Option
- Q: How many square meters of composite floor
- OKorder Mall to check to see the price. Contrast, you should know the price of the.
- Q: Composite floor water from the package how to deal with
- First of all, the first time of course, to the water on the floor quickly dry, to prevent the spread of water. Can also take the water in the water floor of the splash gap in the water sucked away the water vapor, or take the dryer with cold air dry. Second, if the water after the floor so that a small area of ??the seams from the Alice, you can use heavy pressure to pressure in the above, after a period of time after the wooden floor will return to normal. If after a period of time, the seam was drums down, but with the floor before the difference is too far, you can try to wax the floor, waxing after the bubble floor will be almost the same as the original. If the wax after the color of the floor, the shape and the original or a great difference, it is only partial replacement of the floor. Again, if there is a large area of ??the phenomenon of soaking water, should be promptly to inform the floor after-sales service. If it is solid wood flooring, as far as possible to keep the floor is not deformed in the case of the floor carefully pry up, according to the well-type superposition placed in the ventilation at the dry, with its weight produced by the deformation to prevent the occurrence of deformation, under normal circumstances for the quality Good solid wood flooring can be used again. If it is to strengthen the wood floor, quickly remove the floor of the baseboard, exposing the expansion joints, by the expansion of the water vapor will be distributed, according to the size of different seepage, dry up usually takes about three to ten days, generally strengthen the large area of ??wood flooring bubble The water is likely to be used again.
- Q: I am buying 1/2 engineering flooring and I am going to put it down as a floating floor on a crawl space. My question is do I have to put down any moisture barrier or foam underneath?
- If the crawl space has a vapor barrier either on the ground or to the bottom of the joists, which is should, then just a standard foam type under layment is all thats needed. If no vapor barrier is on the under side of the joists you should put it on to protect the joists from moisture. Putting any vapor barrier on the flooring inside will protect the engineered floor but not protect the joists. You need the foam type under layment to allow the flooring to expend and contract normally. If you were to nail or staple the wood down then you would need felt or a rosin paper to help keep the wood quiet from wood to wood contact. Any questions you can email me through my avatar. GL
- Q: Fancy a composite floor above the standard: home 2 level. Ask the business is what, he said refers to the wear resistance ≥ 6000 turn. Is it right? More
- fake
- Q: About 100 square meters of such a floor is multiple? The The urgent need.....? More
- One is about 50 pounds. What we have said before
- Q: How to strengthen the composite floor?
- Straight shop
- Q: My home is to warm, please strengthen the composite floor with solid wood composite floor is good?
- It is only the same that the solid wood flooring is less than the laminate flooring, but the price is three times higher than the price of the composite floor.
- Q: What is the meaning of E0 environmental protection in composite flooring?
- E0, E1, E2 is the formaldehyde emission of three different standards synonyms: E0 ≤ 5 mg / 100 grams E1 ≤ 9 mg / 100 grams (generally said that the environmental protection board indicators) E2 ≤ 30 mg / 100 grams
- Q: Solid wood flooring installation need to pay attention to it
- As the saying goes: "third floor, seven install", so the installation process must pay attention to some 1, the installation of the floor before the ground clean. Especially where there is a "tumor" to eradicate. 2, will be wired, telephone lines, network cable layout. 3, if the wall of the heating tube too thick too deep, it is best to fill with dry sand. Do not let go of dry satin Nao and so on to persuade long slippery to use cement to seal! 4, if there is water pipes, heating pipe transformation must notify the installation of the master, so as to avoid accidents! 5, sprinkle the floor medicine, corner and door to sprinkle more. 6, asked the installation of the master will be under the door saw the saw, so that the floor inserted in the door under the set, so install more solid. 7, paved waterproof mats, if it is geothermal ground, must be used for geothermal mats. 8, before the installation of the best box to open, check the floor surface there is no corner (this situation is very small, but also to prevent). 9, be sure to keep the floor and wall 8mm telescopic space. 10, be sure to let each room into a plate. (At the door off, leaving the telescopic space) if it is a large area, each break 8-10 meters off once. 11, the installation of kicking the angle, the best use of yin and yang angle, because the use of the yin and yang angle, kick the corner joints will be strong. 12, floor and kitchen floor tiles connected with the best copper or stainless steel bar, do not use ordinary plastic strips. 13, before the completion of the installation must be fully accepted once again. Turn my love my home network,
- Q: What is the price of geothermal reinforced laminate flooring?
- OKorder can be found to see
Send your message to us
wpc decking outdoor, recycled material waterproof Cheap Composite Decking
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 200 m²
- Supply Capability:
- 2000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords