Stainless Steel Tie
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 500 Pieces pc
- Supply Capability:
- 10000 Bags per Day pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1.Features:
Unique multi-locking mechanism design on the ladder strip can be applied without crimping tools. Self-locking for fast, easy application.Extended ladder slot provides larger bundle diameter with the same length of tie.Large round slot at the tail-end allows application of hook-type tools.Uncoated tie for high temperature applications. Coated surface provides excellent
chemical and weathering resistance, and superior insulation and protection of cables.
2.Size:
Width:6.3mm and 9.5mm
Length:from 100mm to 1500 mm.
3.Packing:
100pc per polybag,carton for outer packing.
- Q: How to properly remove air conditioning in the absence of electricity
- Installed with a line, dark with a line tube. Ming with the trunks more beautiful.
- Q: The role of cable connector box classification installation requirements
- Should be the power cable and weak cable directly on the side, the middle partition separated. Standard: JB / T-2000 Standard Name: Electric Control Power Distribution Cable Tray Standard Status: Current Implementation Date: 2000-12-1 Issuing Department: National Electrical Appliances Accessories Standard Committee Content: This standard provides for electric control distribution The definition of cable bridge, model code, requirements, test methods, inspection rules, signs, transport and storage. Source:
- Q: Wire diameter of 15MM current transformer model for the BH-0.66- / 5LMK-0.66SDH-0.66 wear the core is very urgent online Thank you more
- Speed does not come to generally start the capacitor (capacity reduction) and centrifugal switch (open circuit) problem, of course, mechanical problems can also lead to can not start If you start again or the same as the first case, or stop a few minutes later is the same situation, you must focus on checking the mechanical failure (bearing) running capacitor burned should be a problem with the quality of the capacitor (pressure is not enough)
- Q: I would like to ask the next communication project in the cable tie is what the situation to use, how to calculate it?
- Not it, the player can not directly use the 3.5 mm headphone plug, you go to the computer city to buy an audio line on the line, Hai Ji indignation Ken You stall Feng Qichen not really take the machine to the store, the speaker line do not buy What top fever, are pit people, 30 dollars a autumn leaves line on it.
- Q: The elevator has 23 floors. But I have not installed before. I would like to ask how to install. How does the video line go? Thank you more
- You can find the staff responsible for the maintenance of the elevator with the shaft of the line with the cable can be wrapped together, but to have shielded wire.
- Q: Dual-value capacitor asynchronous motor starting up the speed is high and low What is the reason, the motor rotation just to the high speed suddenly down again more
- Since it is a discrete graphics, it is recommended to change the motherboard . although the price is almost, but 870 is usually a large board, suitable for wiring, and then graphics from the CPU to be far, so more stable. Graphics currently 5770 the most cost-effective.
- Q: Five ridge hoarding locusts on the high-chu chu chu chu floor layer. Two elevators tied side by side, to cloth video cable, how cloth ah? The The Online to say with the network cable, there is a direct use of coaxial video! I would like to ask how to use coaxial video cable cloth? The Will there be a reserved interface on the car? Or need to take electric drill to play the outer hole, the video line into the box to go inside? The High phone, detailed words ah! The The Thank you! The More
- The problem is very simple, the above two basic are explained clearly, I am not much here to say. It is important to note that non-professional personnel entering the elevator shaft construction must obtain the consent and coordination of the elevator maintenance personnel. Otherwise unauthorized access to the elevator shaft construction is not in line with the relevant state laws and regulations, but also very dangerous.
- Q: Elevator monitoring video line tied to the accompanying cable which side is good? How to determine which side of the cable is strong, there are different elevator brand approach is not the same? Such as Otis Elevator and Mitsubishi Elevator. Question added: online There are articles on both sides is not the same, while the high voltage interference is also large, but did not say how to identify more
- The voice patch panel is mainly used for the termination, installation and management of voice cables between wiring closures and equipment. There are two kinds of installation with a pair of legs and a backplane; from 50 pairs to 200 pairs of selected voice telephone points; with label folders and paper labels; another 4 pairs and 5 pairs of cable and cable management ring Product optional; in line with ISO / IEC: 2002 second edition of the standard.
- Q: How does the geothermal switch above the sensor line pick up?
- Find the relevant units ah, such as the mining bureau ah, will be issued by the relevant acceptance report can be produced
- Q: Hello, may I ask, what norms do you have on the shelf?
- Look at the cable diameter, casing diameter to take the cable diameter of 1.5 times it This is not a certain rule, but 1.5 times in many reference books are mentioned.
1. Manufacturer Overview
Location | Zhejiang, China |
Year Established | 2009 |
Annual Output Value | Below US$1 Million |
Main Markets | North America South America Eastern Europe Oceania Mid East Eastern Asia Western Europe |
Company Certifications | ISO 9001:2000 |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | ningbo,shanghai |
Export Percentage | 81% - 90% |
No.of Employees in Trade Department | 3-5 People |
Language Spoken: | English, Chinese |
b) Factory Information | |
Factory Size: | 3,000-5,000 square meters |
No. of Production Lines | 5 |
Contract Manufacturing | OEM Service Offered Buyer Label Offered |
Product Price Range | High and/or Average |
Send your message to us
Stainless Steel Tie
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 500 Pieces pc
- Supply Capability:
- 10000 Bags per Day pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords