Wholesale painted galvanied cuplock scafolding
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 kg
- Supply Capability:
- 1000 kg/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Feature
1. Cuplock scaffolding system has high flexibility and high loading capacity. And it is mainly used to build bridges, tunnels, metro stations, and etc.
2. Cuplock scffolding is made by Q235 steel which is strong and durable.
3. A complete cuplock scaffolding system includes standards, ledgers, or diagonal braces.
4. The accessories of cuplock scaffolding system are cantilever bracket, side bracket, ladder bracket, ladder, intermediate, and etc.
5. One standard is welded an up cup and a bottom cup in every 500mm to join ledgers at different
heights.
6. One ledger is welded a ledger blade on both ends.
Specification
Item Name | Cuplock Scaffolding | |
Brand Name | Queen | |
Raw Material | Q235 /Q345steel Grade | |
Components | Standard.Ledger .Diagonal brace. Top/Bottop Cup/ Ledge Blade | |
Surface finish | Electric Galvanized/HDG/Powder coated | |
Size | Pipe size:48.3mm | |
Thickness:3.25mm | ||
Usage | Widely used in Bridge .Tunnel.Peterifaction.Shipbuilding .railway,Airport. Dock Industry and Civil Building | |
Packing | By Steel pallet or bulk | |
Standard | 48.3*3.25*500mm | 3.5kg |
48.3*3.25*1000mm | 5.6kg | |
48.3*3.25*1300mm | 8.0kg | |
48.3*3.25*1500mm | 8.75kg | |
48.3*3.25*1800mm | 10.6kg | |
48.3*3.25*2000mm | 11.4kg | |
48.3*3.25*2500mm | 14.0kg | |
48.3*3.25*3000mm | 16.70kg | |
8.3*3.25*4000mm | 20.36kg | |
Ledger | 48.3*3.25*650mm | 2.54kg |
48.3*3.25*914mm | 3.6kg | |
48.3*3.25*1065mm | 4.10kg | |
48.3*3.25*1150mm | 4.7kg | |
48.3*3.25*1570mm | 5.76kg | |
48.3*3.25*1829mm | 6.62kg | |
48.3*3.25*2130mm | 7.62kg | |
48.3*3.25*2438mm | 8.24kg | |
48.3*3.25*3050mm | 10.68kg | |
Diagonal brace | 48.3*3.25*915mm | 3.4kg |
48.3*3.25*1150mm | 4.04kg | |
48.3*3.25*1572mm | 5.34kg | |
48.3*3.25*1829mm | 6.13kg | |
48.3*3.25*2130mm | 7.06kg | |
48.3*3.25*2438mm | 8.01kg | |
48.3*3.25*3050mm | 9.90kg | |
Steel Plank | 210*45*1.2*1000/2000/3000/4000 | |
250*50*1.2*1000/2000/3000/4000 | ||
Screw jack base | 38*4.0*500mm | 3.35kg |
38*4.0*600mm | 3.65kg | |
48*4.0*600mm | 4.4kg | |
35*500mm | 4.5kg |
- Q: What are the chances of cracking the tile? What can I do to avoid cracking the tile?This will be 3 levels of scaffolding on 6 inch wheels.
- unless you are majorly manhandling the scaffolding, such as slamming it around and jerking it into place, etc, you won't crack the tiles (this is being said with the hopes that the flooring was installed correctly.) i would throw a layer or two of bedsheets or a good heavy drop cloth over the tiled floor just to protect the tile from being chipped or scratched. be careful going up so high. good luck!
- Q: What are the functions and requirements of the masonry wall
- security1, set up a high-level scaffolding, the various materials used must meet the quality requirements.2, the foundation must be firm, before the erection of the calculation, to meet the load requirements, and according to the construction code set up, do drainage measures.3, scaffolding erection technical requirements shall comply with the relevant provisions of the code.
- Q: What is the mobile scaffolding materials
- . 5 years of surface treatment period, and the use of the elimination period, very close to the larger share of the market share. Determine where you can find the mobile scaffolding, because mobile scaffolding is easy to find, and mobile scaffolding is not too difficult to find.
- Q: What are the full house scaffolding specification
- 5 "technical code for safety of steel tubular scaffold for building construction" (JGJ128-2000)6 "construction formwork safety technical specifications" (JGJ162-2008)
- Q: Which God can tell me what is required, how to get ah?
- The same height of the building to be calculated separately, and ultimately is to pay attention to security, you can look at the yuan Tuo mall information on this aspect is still a lot of
- Q: For indoor use of mobile scaffolding safety construction plan! Four support points with four pulleys with brake!The construction scheme of scaffolding safety belt for indoor high Jiqiu braking pulley, for about 12 meters of buildings, indoor emergency please heroes!
- All kinds of scaffolding engineering construction programGeneral requirements for 5.2.1 scaffolding settings and use general requirements for scaffold framing and setting requirementsThe design of the frame of the scaffold shall take full account of the requirements for the use of the project, the various conditions and factors for its implementation, and shall comply with the following requirements:Frame dimensions
- Q: A 67.0- painter is on a uniform 21- scaffold supported from above by ropes. There is a 3.8- pail of paint to one side. The ropes are 1m inside the scaffold on each side. The pail is 1m away from the left rope and 3m from the right rope. The scaffold is a 6m. How close to the right end can he approach safely? How close to the left end can he approach safely?
- First of all...no units, no answer. Second of all...according to OSHA (Occupation Safety and Health Administration), NO ONE can walk on a scaffold beam outside the support ropes OR SET ANY OBJECT DOWN outside the support ropes. Hence the answers for both questions are 1 meter. It doesn't matter what a calculation will yield...NO ONE can walk on the beam outside the support ropes safely. Even if a torque balance yields that it will not put the ropes in compression and buckle them...it still isn't considered to be safe by OSHA if the painter is outside the ropes.
- Q: Specific requirements, the civil code is what ah! Thank you very much, I am lack of this kind of information, I hope you can tell me which of the following
- The surface of the steel pipe shall be smooth and free of cracks, scars, delamination, dislocation, hard bending, burrs, indentation and deep scratches.The outer diameter of steel pipe 48mm allowable deviation is 0.5mm; the thickness of the wall 3.5mm allowable deviation of.0.5mm; steel pipe surface cutting oblique deviation 1.7mm;Dressing should be checked once a year. When the examination, should be in serious pipe corrosion in the selected three roots in each part of the serious corrosion of transverse sampling inspection, the outer surface of the steel pipe corrosion depth allowable deviation is less than 0.5mm, more than the provisions shall not be used.All new and old steel pipes must be painted with anti rust paint.
- Q: i have an interview tomorrow but have a scafold piercing in , its been in there for about 2/3 months nearly healed competely , how ling can i leave it out for , maybe 30-45 minutes? thanks
- They take around 6-9 months to heal completely...you shouldn't be taking it out at all. I stupidly took mine out after 3 months to clean a bit behind the bar and the bar would never go back through the top hole. It hurt like crap and bled profusely if I tried to push it through.
- Q: Specification and type of scaffold erection
- 4 the vertical pole of the scaffold, the size of the cross bar according to the specific use of the scaffold to determine the specific circumstances, but shall not exceed the following values:Horizontal vertical rod vertical rod large cross bar small crossbar small cantilever cantilever length 1.5m 1.2m 2.0m 1.5m 0.45M5 ramps board, springboard slope is no larger than 1:3, width of not less than 1.5m. 6 wooden rods: wire with 8#
Send your message to us
Wholesale painted galvanied cuplock scafolding
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 kg
- Supply Capability:
- 1000 kg/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords