• Wholesale painted galvanied cuplock scafolding System 1
Wholesale painted galvanied cuplock scafolding

Wholesale painted galvanied cuplock scafolding

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
1000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

                   

Feature

1. Cuplock scaffolding system has high flexibility and high loading capacity. And it is mainly used to build bridges, tunnels, metro stations, and etc.

2. Cuplock scffolding is made by Q235 steel which is strong and durable.

3. A complete cuplock scaffolding system includes standards, ledgers, or diagonal braces.

4. The accessories of cuplock scaffolding system are cantilever bracket, side bracket, ladder bracket, ladder, intermediate, and etc. 
5. One standard is welded an up cup and a bottom cup in every 500mm to join ledgers at different
heights.
6. One ledger is welded a ledger blade on both ends. 

Specification     

Item Name

Cuplock Scaffolding

Brand Name

Queen

Raw Material

Q235 /Q345steel Grade

Components

Standard.Ledger .Diagonal brace. Top/Bottop Cup/ Ledge Blade

Surface finish

Electric Galvanized/HDG/Powder coated

Size

 

Pipe size:48.3mm

Thickness:3.25mm

Usage

Widely used in Bridge .Tunnel.Peterifaction.Shipbuilding .railway,Airport. Dock Industry and Civil Building

Packing

By Steel pallet or bulk

 

 

 

 

 

 

 

Standard

48.3*3.25*500mm

3.5kg

48.3*3.25*1000mm

5.6kg

48.3*3.25*1300mm

8.0kg

48.3*3.25*1500mm

8.75kg

48.3*3.25*1800mm

10.6kg

48.3*3.25*2000mm

11.4kg

48.3*3.25*2500mm

14.0kg

48.3*3.25*3000mm

16.70kg

8.3*3.25*4000mm

20.36kg

 

 

 

 

 

 

Ledger

        

48.3*3.25*650mm

2.54kg

48.3*3.25*914mm

3.6kg

48.3*3.25*1065mm

4.10kg

48.3*3.25*1150mm

4.7kg

48.3*3.25*1570mm

5.76kg

48.3*3.25*1829mm

6.62kg

48.3*3.25*2130mm

7.62kg

48.3*3.25*2438mm

8.24kg

48.3*3.25*3050mm

10.68kg

 

 

 

 

 

 

Diagonal brace

      

48.3*3.25*915mm

3.4kg

48.3*3.25*1150mm

4.04kg

48.3*3.25*1572mm

5.34kg

48.3*3.25*1829mm

6.13kg

48.3*3.25*2130mm

7.06kg

48.3*3.25*2438mm

8.01kg

48.3*3.25*3050mm

9.90kg

 

Steel Plank

 

210*45*1.2*1000/2000/3000/4000

250*50*1.2*1000/2000/3000/4000

 

 

 

Screw jack base

   

38*4.0*500mm

3.35kg

38*4.0*600mm

3.65kg

48*4.0*600mm

4.4kg

35*500mm

4.5kg

 

Q:Im a wimp for pain and im looking to get my scaffolding done. i want to know how painful it isI already have both lobs pierced and stretched to an 8mm, will the pain be similar to that?
You sound like you have a low tolerance for pain if you say you're a wimp haha, which means yeah it'll probably hurt you. It'll hurt more than the lobes because it's cartilage, and for the same reason you'll hear a popping noise as the hole is made. You won't be taken over by deathly pain or anything like that, it'll probably be sensitive for a few days after too so careful not to knock it against anyone/ anything. But if you want it bad enough, the pain will be bearable.
Q:Right! I've heard from so many different people about this. Some say that you should never twist an industrial because it can damage the delicate newly healing skin cells. Others say that you must twist it to prevent the jewelry from healing attached to the skin and to be able to clean it properly.There really doesn't seem to be a definitive answer!My piercer has said not to twist it, so I haven't been, and I'm happy that the piercing is clean enough, etc. However I'm interested in whether any of you out there have found that not twisting it can damage it more than doing so.Thanks
mine told me to twist it....i twist it like every day haha. nothing bad has happened
Q:Why is it necessary to keep records of all inspection carried out on scaffolds as stated in Regulation 39?
To cover your A** in case of injury or an inspection.
Q:Erection of steel scaffolding tools and safety supplies
Safety belt, safety helmet, gloves, rope, steel shear, ribbon sling (sling)
Q:What is the service life of the mobile scaffolding accessories?
In actual use, there are a lot of mobile scaffolding accessories because of deformation, and other reasons, resulting in a lot of scaffolding accessories are not easy to use, or even eliminated. Therefore, the overall life of about 5 years. Therefore, the use of mobile scaffolding accessories should pay attention to the maintenance, so that its useful life to get more, the value of the use of more perfect.
Q:i had it done 2/3 months ago, it was fine at first but now on each end i have two lumps on my ear:S there relitavely smal...the size of like a really tiny pea.there really painfull and sore and quite red and sometimes they scab over with yellowy crust [yes i know sounds disguisting]im just a bit worried that its gone all weird or are these normal? am i cleaning it right?
I had the same situation occur when I got my scaffold/industrial done. I wouldn't be too concerned. The lumps are called hypertrophic scars, and supposedly they are pretty common and are caused by overcleaning, harsh products, or (as I think was my case) general irritation from the jewelry moving repeatedly back and forth through the piercing or being bumped around or rubbed/touched. Mine lasted quite a long time. Try leaving your piercing alone for a couple of days. Then salt water solutions or compresses are supposed to help the lumps to heal, and I also used tea tree oil and neosporine intermittently. Hot compresses like a heated washcloth applied to the area help to reduce the lumps, as well. Sometimes it's recommended to try another type of jewelry, like titanium, or switch temporarily to two separate bars. You might also try finding a really gentle cleanser/soap. I just kept my original piercing, using the above techniques off and on, and after months of the lumps remaining red and sore, they just went away totally. Just keep your eye out for any pussing (hypertrophic scars ooze, but they don't usually pus), increased swelling, and the area feeling very hot- these are signs of infectiona nd you should see your doc right away. Good luck! :)
Q:Fastener type steel pipe scaffold accessories
Steel pipeScaffolding steel pipe should be used outside diameter 48mm, wall thickness of 3.5mm welded steel pipe, can also be used outside diameter 51mm, wall thickness of 3.1mm welded steel pipe. The maximum length of the steel pipe used for horizontal horizontal rod shall not be greater than 2m; the other rods shall not be more than 6.5m, and the maximum quality of each steel pipe shall not exceed 25kg, so as to be suitable for manual handling.
Q:Calculation method of complete scaffold
The most distant light is closer to us than the nearest darkness:Distance is usually just a myth
Q:My mom wouldn't let me get snakebites or cyberbites but she will let me get my scaffold pierced. I know people have different things for pain etc etc I know it will hurt but I want it pierced. So, to someone who has gotten it pierced or knows about it is there anything special you have to do to take care of it or is it just like the ear lobe piercing.
a million. there is a few discomfort in touch. in simple terms relies upon on the way you cope with it. 2. there is new information that even after years of having the piercing it could nonetheless substitute into contaminated =/ 3. It has a bent emigrate because of the fact of ear strengthen (your ears in no way particularly provide up growing to be). 4. Dont over sparkling it. 5. Its executed with a medium gauge needle. 6. i comprehend in the States that many piercing places won't touch everybody under sixteen inspite of parental consent. there is likewise a many greater that isn't touch a minor (everybody under 18). So i could call around and notice.
Q:Topic?Scaffolding construction program how to doSpecial construction scheme
Full support calculation method:1, determine the above line load (ie, the length of a variety of meters, take the maximum);2, to determine the bearing capacity of the foundation (through the strengthening of the bearing capacity);3, according to the bearing capacity of the foundation, about how many square meters per square meter to determine the vertical tube, assigned to specific point load;4, to determine the number of tons of vertical pipe can be per ton (according to pipe diameter, wall thickness calculation of allowable stress);

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords