Cup Lock Scaffolding for Construction in Painted
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 kg/m²
- Supply Capability:
- 10000 kg/m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1.Structure of cup lock Description:
cup lock system is one of the most popular used scaffolding system in the world.It is consisted of cup lock,vertical,ledger,limit pins,blades and base etc.
Packaging & Delivery
Packaging Details: | Pallet or bag or upon client's request |
Delivery Detail: | 35days |
2.Main Features of cup lock:
1) Using less pipes
2) Easy to install
3) It can be used again and again for nearly 20years
3.Cup lock product pictures:
4.Cup lock Product Description
Type: | ringlock scaffolding diagonal Brace |
specification | Ø48.3×3.20 |
material: | steel Q235 |
Finished | Hot DIP galvanized, painted |
Diagonal length(m) | Weight(kg) |
0.9m * 1.25m | 6.28 |
1.25m * 1.8m | 8.6 |
1.25m * 2.7m | 11.45 |
5.FAQ
We have organized several common questions for our clients,may help you sincerely:
1) How many Scaffolding your company have?
Here comes our 5 types of Scaffolding systems:
-Cup lock Scaffolding(C-Lock Scaffolding)
-Ring lock Scaffolding
-Kwistage Scaffolding
-H-frame Scaffolding
-ID15 Scaffolding Tower, this type Scaffolding is the most widely used in construction, such like bridge.
2) How long can we receive the product after purchase?
Lead time is about 30days after getting the signed PI and deposit
- Q: Please help me in building professional people (scaffolding)
- Door type scaffolding when used in general decoration, that thing is a direct product, a simple spell on the line, who rent who fightBowl buckle scaffold is also finished steel pipe, but there is no fastener, his fastener is a kind of fixed in the steel pipe instead of the demolition of the scaffolding is more convenient than ordinaryRent depends on the specific market
- Q: Mobile scaffolding accessories prices
- The price of each region is different, are you renting or buying?
- Q: How to set up the temporary structure of the external structure of the balcony on the two structure
- Foundation engineering:Square - hole excavation pile - pile - reinforced concrete beam - based backfill. Pile by manual drilling, artificial trolley, concentrated heap of residual soil, automobile Sinotrans earthwork project, the allowable deviation of hole diameter of pile are as follows: 800cm, vertical aperture offset, 10cm < 1%, along the axis, vertical axis direction 7cm.
- Q: I want to get something pierced. My mom wont let me get anything on my face pierced but she will allow ear and body piercings. I thought about a belly ring but everyone has one amd i'm very skinny and scared it'd rip out. so i've been looking at ear piercings and really like a Targus piercing or a scaffold. But i don't know anything about them really. If you could which one is more painful, problems with them etc. please help, thank you
- If you want to be different AND have something that looks really cute, get a micro dermal. Either on your collar bone, or lower back dimples if you have cute ones! Good luck hun!
- Q: If you have two workers say standing on a scaffolding, their are downward forces from the weight of the workers along with the weight of the scaffold, and upward forces from tension suspending the scaffolding in place. The opposite forces add to zero and thus the scaffolding remains at rest.My question has to do with what would occur if more/less workers were on the scaffolding. It appears to me that the scaffolding would always remain at rest. Would there always be a ΣF=0 regardless of the amount of workers? As the decreases in weight from removing a worker would also cause the tension force to be weaker? And vice versa if there were more workers?I
- You are correct so long as the scaffolding is not allowed to move. I.e. the cables suspending it are locked and not unwinding from their spools as more workers get on. More weight added would necessarily increase the tension in this type of case. However, if, when another worker got on and the tension could not increase for what ever reason, a downward acceleration would take place that is proportional to the worker's weight. Hope that clears things up.
- Q: by scaffolding ?
- It's a rhetorical question, maybe the girl is held up so well that it could have been something else holding her up there
- Q: I sincerely ask you to help me, door scaffolding, build 30 meters high, without any reinforcement points of the construction program. Thanks, high marks!
- This specification is applicable to the design, construction and use of the floor (bottom) door type steel pipe scaffold used in industrial and civil construction. The door type steel pipe scaffold for other purposes (such as chimneys, water towers, etc.) can be carried out in accordance with the principles of this specification.
- Q: improper design of formwork and scaffolding, not adequate braces and supports, improper handling, corrosion of material is several factor of formwork and scaffolding failure. it is estimated that more than 3000 accidents involving falls from scaffolds and 30 fatalities
- Well, it seems you came close to answering your question. But are falls a scaffolding failure? For me failure means that the scaffolding sagged or fell - which may result in injuries with or without falling as when the failing scaffolding falls on a worker on the ground. I would think that major causes of failure as I defined it would be inadequate or failed attachments to the building and failure of ground support for the structure. Question needs to be improved to define what you need in answer and avoid conflict between question and detail.
- Q: i am getting my industrial (scaffold) pierced on one ear and i want my cartilage on the other ear, how long do i have to wait between them? What are pros and cons for industrial (scaffold)? what are risks and stuff and how much is it? i want to get it so any information or anything i should know would be great thanks especially for industrial:)
- You can have both done in the same day if you can handle the pain and shock. Get the industrial done first, and if you still feel OK afterwords, you can get your other ear done by the same piercer. Talk to him/her and let them know what you want to do before you start. If you feel like you need to wait after the industrial, wait at least a day before getting the second piercing. It's all about what you can handle.
- Q: scaffolding business?
- scaffold /, -f(@)ld/ · n. 1 a raised wooden platform used formerly for public executions. 2 a structure made using scaffolding. · v. attach scaffolding to. – DERIVATIVES scaffolder n. – ORIGIN ME: from Anglo-Norman Fr., from OFr. (e)schaffaut, from the base of catafalque.
Send your message to us
Cup Lock Scaffolding for Construction in Painted
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 kg/m²
- Supply Capability:
- 10000 kg/m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords