WHOLE ALUMINUM FORMWORK SYSTEMS and SCAFFOLDINGS FOR COLUMN CONSTRUCTION
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 150 m²
- Supply Capability:
- 10000000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Introduction :
Aluminum Formwork System
*Monolithic pouring
*Concrete rate:4 days/floor
*Easy to handle
*Eco-friendly
Aluminum Formwork VS Timber Formwork
Item | Unit | Aluminum Formwork | Timber Formwork | |
cycle times | Times | 150--300 | 6--8 | |
Template sets | Set | 1 | 3--4 | |
Unit price(including spare parts) | RMB/Sq.M | 1380--1500 | 100 | |
Cost of labor for installation | 23--25 | 25 | ||
Cost of auxiliary machinery | / | 2 | ||
Residual value of formwork | 300--400 | / | ||
High-rise of a building (30 floors) | 34--38 | 43 | ||
High-rise of a building (40 floors) | 26--29 | 43 | ||
High-rise of a building (50 floors) | 21--23 | 43 | ||
Same house type for two buildings (30 floors) | 17--19 | 43 | ||
Same house type for three buildings (30 floors) | 11--13 | 43 | ||
Remarks: 1. It will be different ,due to its different price of commodities and cost of labor in the locality . 2.Aluminum Formwork System contains all supporting, waling,release agent etc which must be used under construction. | ||||
Advantage
1. Light weight, high strength
The data has proved that the flexural strength of aluminum is triple higher than ordinary steel.With weight of 20-25KG/M2. Aluminum formwork is the lightest formwork for construction,which makes for easy handling.
2. Various sizes, high accuracy
The construction drawing is designed with strict structure, with little measurement error and high accuracy,which is very suitable for high rise buildings.
3. Safe and convenient construction
High loading capacity requires less use of props, reducing lost in material and labor. Workers can independently operate after simple training.
4. Long time used
With the lowest average lost, aluminum formworks can be used up to 300 times.
5. Wide range used
The precise-designed formwork system applies to all kinds of building elements, such as the main wall, column, beams, stairs and balconies.
6. Excellent quality
The concrete surface is very smooth, so it can saved the swing cost and shorten the construction period.
7. High efficiency
According to different climatic conditions, the formworks can be removed in 18-36 hours.
8. Recyclable value
The used aluminum material is of greater recyclable value,several times higher than steel.
9. Independent support system
The gap between the formwork support is totally enough for passing, moving and pulling.
10. Dependable safety, environmental
The construction process is totally safe. Full aluminum structure leads to no galvanization and thus minimizes the pollution to our earth.
- Q: Case Study of Aluminum Alloy Formwork
- Engineering aluminum alloy template design program case: 1, all using stereotypes design, factory production, template engineering quality excellent. 2, safe and civilized construction, people-oriented, scientific development. 3, because the scene almost no production process, reduce the construction noise, energy saving, power in the future.
Send your message to us
WHOLE ALUMINUM FORMWORK SYSTEMS and SCAFFOLDINGS FOR COLUMN CONSTRUCTION
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 150 m²
- Supply Capability:
- 10000000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords