• WHOLE ALUMINUM FORMWORK SYSTEMS for BEAM CONSTRUCTION System 1
  • WHOLE ALUMINUM FORMWORK SYSTEMS for BEAM CONSTRUCTION System 2
  • WHOLE ALUMINUM FORMWORK SYSTEMS for BEAM CONSTRUCTION System 3
WHOLE ALUMINUM FORMWORK SYSTEMS for BEAM CONSTRUCTION

WHOLE ALUMINUM FORMWORK SYSTEMS for BEAM CONSTRUCTION

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
120 m²
Supply Capability:
10000000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Introduction :

Aluminum Formwork System 
*Monolithic pouring 
*Concrete rate:4 days/floor 
*Easy to handle 
*Eco-friendly

 

Aluminum Formwork VS Timber Formwork

 

Item

Unit

Aluminum Formwork

Timber Formwork


cycle times

Times

150--300

6--8


Template sets

Set

1

3--4


Unit price(including spare parts)

RMB/Sq.M

1380--1500

100


Cost of labor for installation

23--25

25


Cost of auxiliary machinery

/

2


Residual value of formwork

300--400

/


High-rise of a building (30 floors)

34--38

43


High-rise of a building (40 floors)

26--29

43


High-rise of a building (50 floors)

21--23

43


Same house type for two buildings (30 floors)

17--19

43


Same house type for three buildings (30 floors)

11--13

43


Remarks:

1. It will be different ,due to its different price of   commodities and cost of labor in the locality .

2.Aluminum Formwork System contains all supporting,   waling,release agent etc which must be used under construction.



 

Advantage

1. Light weight, high strength

The data has proved that the flexural strength of aluminum is triple higher than ordinary steel.With weight of 20-25KG/M2. Aluminum formwork is the lightest formwork for construction,which makes for easy handling.

 

2. Various sizes, high accuracy

The construction drawing is designed with strict structure, with little measurement error and high accuracy,which is very suitable for high rise buildings.

 

3. Safe and convenient construction

High loading capacity requires less use of props, reducing lost in material and labor. Workers can independently operate after simple training. 

 

4. Long time used

With the lowest average lost, aluminum formworks can be used up to 300 times.

 

5. Wide range used

The precise-designed formwork system applies to all kinds of building elements, such as the main wall, column, beams, stairs and balconies.

 

6. Excellent quality

The concrete surface is very smooth, so it can saved the swing cost and shorten the construction period.

 

7. High efficiency

According to different climatic conditions, the formworks can be removed in 18-36 hours.

 

8. Recyclable value

The used aluminum material is of greater recyclable value,several times higher than steel.

 

9. Independent support system

The gap between the formwork support is totally enough for passing, moving and pulling.

 

10. Dependable safety, environmental

The construction process is totally safe. Full aluminum structure leads to no galvanization and thus minimizes the pollution to our earth.


WHOLE ALUMINUM FORMWORK SYSTEMS for BEAM CONSTRUCTION

WHOLE ALUMINUM FORMWORK SYSTEMS for BEAM CONSTRUCTION

WHOLE ALUMINUM FORMWORK SYSTEMS for BEAM CONSTRUCTION

WHOLE ALUMINUM FORMWORK SYSTEMS for BEAM CONSTRUCTION


Q: Case Study of Aluminum Alloy Formwork
For example: the beam section of the project is larger, the design of the beam at the end of the support with double column support, pole spacing 1200mm, beam at the end of the plate, the beam at the end of support aluminum beam 125mm wide, arranged on both sides of the beam at the end. Aluminum sheet 4mm thick.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords