WHOLE ALUMINUM FORMWORK SYSTEM FOR BUILDING CONSTRUCTIONs
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m²
- Supply Capability:
- 10000000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Structure of Whole Aluminum Formwork
Whole Aluminum Formwork is invented because of its light weight and one time casting and makes it possible to save cost when it comes to pouring of concrete in construction site. It consists of very standardized forms and multiple sizes of wall, beam and column types.
2. Main Features of Whole Aluminum Formwork
◆ Lighter weight but high bearing capacity.
◆Manual transportation can be achieved, greatly reduces the aggregate cost.
◆Perfect design, excellent produce and well welding make sure the flatness of concrete surface.
◆It is with the advantages of standard design, excellent applicability and interchangeable.
◆Simple, safe and fast.
◆No rust corrosion, easy maintenance, and high turnover rate.
◆The formwork series are a complete system with a full set of accessories, and can be set up flexibly according to project.
3. Whole Aluminum Formwork
4. Whole Aluminum Formwork Specifications
5. FAQ of Whole Aluminum Formwork
1) What can we do for you?
.We can ensure the quality of the Whole Aluminum Formwork and avoid extra expenses for customers.
.We can provide you the professional technical team.
.We can provide professional building proposal for your projects.
2) What promises can be done by us?
. If interested in this kind of Whole Aluminum Formwork, please feel free to write us for any QUOTE.
. If need any technical and building assistance, we could provide on-site professional staff for instruction.
. Please DO check goods when courier knocks your door and contact us asap if any issueS.
3) What about of our after-sale services?
. Response will be carried out in 24hours after receiving any complain or request.
. Any formwork cost can be refund after order is confirmed.
. If the products are not based on the requirements, there will be the relevant compensations made for you.
4) What about the package and shipping time?
.Packing: wood package and adhesive tape
.Shipping: by sea
Shipping time: Normally small orders, it just1week business days to arrive your hand; When comes to the customs declaration, it may need 2weeks.
- Q:Case Study of Aluminum Alloy Formwork
- Aluminum alloy template lighter than the steel template, the use of fast assembly and disassembly system, moving components, lightweight and flexible, greatly reducing the amount of artificial, easy construction management. Aluminum alloy template is one of the most advanced templates, the construction company image is good. Design advanced early demolition system, to speed up the construction progress.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
WHOLE ALUMINUM FORMWORK SYSTEM FOR BUILDING CONSTRUCTIONs
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m²
- Supply Capability:
- 10000000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches