1. Structure of Whole Aluminum Slab Formwork
One of the most important component formwork for whole aluminum formwork is slab formwork. Because it is made with very standardized sizes, it is widely used in wall, table column and other parts.It is with the advantages of Standard Design ,excellent applicability and interchangeable.No rust corrsion,easy maintenance,and high turnover rate.
2. Main Features of Whole Aluminum Slab Formwork
-Standardized plates
-Work with early prop head
-No need tower crane
-Light weight
-Manual human work
-Simple,safe and fast
-No rust corrision
3. Whole Aluminum Slab Formwork Images
4. Whole Aluminum Slab Formwork Specifications
The regular size of slab formwork normally is 400mm*1200mm
And wall regular size should be 400mm*2700mm. It weighs 28-29Kg per square meter of aluminum formwork. One 40HQ container includes 500 square meters.
Economical, Versatile&hi-speed formwork system,comes with a permissible slab thickness of 400mm
5. FAQ of Whole Aluminum Slab Formwork
1) What can we do for you?
.We can ensure the quality of the whole aluminum slab formwork and avoid extra expenses for customers.
.We can provide you the professional technical team.
.We can provide professional building proposal for your projects.
2) What about of our after-sale services?
. Response will be carried out in 24hours after receiving any complain or request.
. Any formwork cost can be refund after order is confirmed.
. If the products are not based on the requirements, there will be the relevant compensations made for you.
3) What about the package and shipping time?
.Packing: wood package and adhesive tape
.Shipping: by sea
Shipping time: Normally small orders, it just1week business days to arrive your hand; When comes to the customs declaration, it may need 2weeks.
- Q: Case Study of Aluminum Alloy Formwork
- For example: the beam section of the project is larger, the design of the beam at the end of the support with double column support, pole spacing 1200mm, beam at the end of the plate, the beam at the end of support aluminum beam 125mm wide, arranged on both sides of the beam at the end. Aluminum sheet 4mm thick.
Send your message to us
Whole Aluminum Formwork System and Scaffoldings in Building Industry
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 100 m²
- Supply Capability:
- 10000000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches