Whole Aluminum Formwork System with Supporting System
- Loading Port:
- Tianjin
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 m²
- Supply Capability:
- 10000000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Structure of Whole Aluminum Wall Formwork
Wall formwork is one of the most important panles used in whole aluminum formwork. It is a necessary part when assembling and disassembling formwork system. Wall formwork works with standardized sizes and easily install with manual effort. It weighs lightly and save human and machine cost. With clean surface of concrete, wall formwork beautifully and neatly make construction perfectly.
2. Main Features of Whole Aluminum Wall Formwork
-panles are standardized
-early prop head used together
- tower crane not necessary
-Weight is light
-human work is ok
3. Whole Aluminum wall Formwork Images
4. Whole Aluminum Wall Formwork Specifications
The standardized regular size of whole aluminum wall formwork is 400mm*2700mm and works with beam and slab formwork together. Whole aluminum formwork weighs 28-29KG per meter and each 40HQ container could include 500 meters and more. The width of wall formwork normally is between 400mm-600mm and height is 2.4-2.7meter. Wall formwork is widely used in various project like hotel, office and public sites.
5. FAQ of Whole Aluminum Wall Formwork
1) What can we do for you?
.We can ensure the quality of the whole aluminum wall formwork and avoid extra expenses for customers.
.We can provide you the professional technical team.
.We can provide professional building proposal for your projects.
2) What about of our after-sale services?
. Response will be carried out in 24hours after receiving any complain or request.
. Any formwork cost can be refund after order is confirmed.
. If the products are not based on the requirements, there will be the relevant compensations made for you.
3) What about the package and shipping time?
.Packing: wood package and adhesive tape
.Shipping: by sea
Shipping time: Normally small orders, it just1week business days to arrive your hand; When comes to the customs declaration, it may need 2weeks.
- Q:Case Study of Aluminum Alloy Formwork
- Aluminum alloy template lighter than the steel template, the use of fast assembly and disassembly system, moving components, lightweight and flexible, greatly reducing the amount of artificial, easy construction management. Aluminum alloy template is one of the most advanced templates, the construction company image is good. Design advanced early demolition system, to speed up the construction progress.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Whole Aluminum Formwork System with Supporting System
- Loading Port:
- Tianjin
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 m²
- Supply Capability:
- 10000000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords