Whole Aluminum Formwork for Slab Formwork
- Loading Port:
- Tianjin
- Payment Terms:
- TT or LC
- Min Order Qty:
- 500 m³
- Supply Capability:
- 50000 m³/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Structure of Whole Aluminum Slab Formwork
One of the most important component formwork for whole aluminum formwork is slab formwork. Because it is made with very standardized sizes, it is widely used in wall, table column and other parts.
2. Main Features of Whole Aluminum Slab Formwork
-Standardized plates
-Work with early prop head
-No need tower crane
-Light weight
-Manual human work
3. Whole Aluminum Slab Formwork Images
4. Whole Aluminum Slab Formwork Specifications
The regular size of slab formwork normally is 400mm*1200mm
And wall regular size should be 400mm*2700mm. It weighs 28-29Kg per square meter of aluminum formwork. One 40HQ container includes 500 square meters.
5. FAQ of Whole Aluminum Slab Formwork
1) What can we do for you?
.We can ensure the quality of the whole aluminum slab formwork and avoid extra expenses for customers.
.We can provide you the professional technical team.
.We can provide professional building proposal for your projects.
2) What promises can be done by us?
. If interested in this kind of early prop head formwork, please feel free to write us for any QUOTE.
. If need any technical and building assistance, we could provide on-site professional staff for instruction.
. Please DO check goods when courier knocks your door and contact us asap if any issues.
3) What about of our after-sale services?
. Response will be carried out in 24hours after receiving any complain or request.
. Any formwork cost can be refund after order is confirmed.
. If the products are not based on the requirements, there will be the relevant compensations made for you.
4) What about the package and shipping time?
.Packing: wood package and adhesive tape
.Shipping: by sea
Shipping time: Normally small orders, it just1week business days to arrive your hand; When comes to the customs declaration, it may need 2weeks.
- Q: What is the development prospect of aluminum template design?
- Easy to disassemble, high construction efficiency: aluminum alloy template for the existing metal template in the lightest, single can be free to move, install, remove and transfer, the workers can easily assembled. Each template, components are in the same location on each floor, the workers only need a simple training, a short period of time can be proficient in the construction process. And the installation and removal process, just human, no other machinery, simple operation, easy construction.
- Q: In the Sheng-aluminum template installation workers, how to develop prospects
- Sheng Tong on my feeling is the same as prison, in addition to front-line staff (prisoners), what is the leadership (guards), every day is the workshop, dormitory, dinner time is only half an hour, the company provides working hours if 12 hours, The time to stay in the workshop every day in more than 13 hours, especially hard to force, can not stand the tube, temper a little irritable advice do not go, afraid you can not control their own K
- Q: What is the change in the aluminum template?
- Advantages of aluminum alloy template: 1. Construction period is short: aluminum alloy building template system for the quick-release mold system, a set of normal construction of the template can reach four or five days a layer, greatly saving the construction unit management costs (currently under construction project in Macau - TN27 public housing construction up to Three days a layer). (6063-T6 or 6061-T6), a set of template specifications can be used to reverse the use of 300-500 times the use of aluminum alloy profiles, the use of aluminum, Above, the average use of low cost. Easy construction, high efficiency: aluminum alloy building template system assembly is simple, convenient, the average weight of 30KG / m2, completely by the artificial assembly, do not need any mechanical equipment assistance (workers usually only need a wrench or a small hammer, convenient ), Skilled installation workers can install 20-30 square meters per person per day (compared with the wooden mold: aluminum mold installation workers only need to install wood workers 70-80%, and do not need skilled workers, just before the installation of the construction Personnel can carry out simple training). Good stability, high bearing capacity: aluminum alloy building template system all parts are made of aluminum alloy plate assembly, the system assembled to complete the formation of a whole frame, the stability is very good; bearing capacity can reach 60KN per square meter.
- Q: Now the domestic use of aluminum template project more?
- Construction of aluminum alloy template construction advantages are: 1, the construction period is short, four to five days can be a layer; 2, re-use more than 200 times, effectively reduce costs; 3, artificial reduction of 30%, construction convenience, high efficiency; The template 2 times the bearing capacity, good stability, high bearing capacity;
- Q: Whether a shear wall aluminum template and wood template can be mixed
- The high strength and stability of the aluminum template are good, and the surface roughness of the concrete is high and the precision is high, which can be removed from the surface. The fixed method is simple and quick,
- Q: Aluminum template of the aluminum template advantage characteristics
- Good stability, high bearing capacity. Most of the aluminum template system bearing capacity of up to 60KN per square meter, enough to meet the majority of residential buildings supporting capacity of the support capacity. Wide range of applications. Aluminum template for wall, horizontal floor, pillars, beams, stairs, windowsill, floating plate and other locations of the use of the ring beam, structural columns, anti-kan and other secondary structure model is still useful. Patchwork less, high precision, demoulding concrete surface effect is good. After the demolition of aluminum construction template, the concrete surface quality is smooth and smooth, basically can meet the requirements of finishes and water concrete, without the need for batch, can save the bulk of the cost.
Send your message to us
Whole Aluminum Formwork for Slab Formwork
- Loading Port:
- Tianjin
- Payment Terms:
- TT or LC
- Min Order Qty:
- 500 m³
- Supply Capability:
- 50000 m³/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords