• Whole Aluminum Formwork System-Slab Formwork System 1
  • Whole Aluminum Formwork System-Slab Formwork System 2
  • Whole Aluminum Formwork System-Slab Formwork System 3
Whole Aluminum Formwork System-Slab Formwork

Whole Aluminum Formwork System-Slab Formwork

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
100 m²
Supply Capability:
10000000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. Structure of Whole Aluminum Slab Formwork

One of the most important component formwork for whole aluminum formwork is beam formwork. It bears high capacity for the whole aluminum formwork and support very heavily. Beam formwork works with early prop head and works very fast and efficiently. With Beam formwork, the whole formwork will be constructed very tightly.


2. Main Features of Whole Aluminum Slab Formwork

-Standardized plates

-Work with early prop head

-No need tower crane

-Light weight

3. Whole Aluminum Slab Formwork Images                                           

 

 

4. Whole Aluminum Slab Formwork Specifications

The regular size of slab formwork normally is 400mm*1200mm

And wall regular size should be 400mm*2700mm. It weighs 28-29Kg per square meter of aluminum formwork. One 40HQ container includes 500 square meters.


5. FAQ of Whole Aluminum Slab Formwork

1) What can we do for you? 

    .We can ensure the quality of the whole aluminum slab formwork and avoid extra expenses for customers.

    .We can provide you the professional technical team.    

    .We can provide professional building proposal for your projects.        

 

2) What promises can be done by us?

   . If interested in this kind of early prop head formwork, please feel free to write us for any QUOTE.

   . If need any technical and building assistance, we could provide on-site professional staff for instruction.

   . Please DO check goods when courier knocks your door and contact us asap if any issueS.

 

 3) What about the package and shipping time?

    .Packing: wood package and adhesive tape

    .Shipping: by sea

     Shipping time: Normally small orders, it just1week business days to arrive your hand; When comes to the customs declaration, it may need 2weeks

Q: Case Study of Aluminum Alloy Formwork
Aluminum alloy template lighter than the steel template, the use of fast assembly and disassembly system, moving components, lightweight and flexible, greatly reducing the amount of artificial, easy construction management. Aluminum alloy template is one of the most advanced templates, the construction company image is good. Design advanced early demolition system, to speed up the construction progress.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords