• Waterseal Mastic Resistant to Corrosion, Chemicals and Salt Water System 1
  • Waterseal Mastic Resistant to Corrosion, Chemicals and Salt Water System 2
Waterseal Mastic Resistant to Corrosion, Chemicals and Salt Water

Waterseal Mastic Resistant to Corrosion, Chemicals and Salt Water

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1000 roll
Supply Capability:
500000 roll/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Waterseal Mastic Resistant to Corrosion, Chemicals and Salt Water

Description of KC86 Tape

• KC 86 is a self-amalgamating mastic tape used for moisture sealing on all types of telecommunications and solid dielectric power cable splices and connections.

• It is a tacky, temperature stable mastic with excellent conformability and adhesion to metal and all types of cable insulations and jackets.
• It is put up on a white release coat separator in roll form without any core.
• Once applied, KC 86 mastic should be overwrapped with a vinyl or rubber tape which will encapsulate it and, throug centripetal force, make it into every crevice and indentation in a cable jacket thereby giving a superior moisture seal in a splice or aroun any connection.
• The tape is also RoHS compliant, resistant to corrosion, chemicals and salt water and has no adverse effect on cable insulations.
• Its 2.5mm thickness facilitates rapid protection build-up.

• Use in conjunction with KC 63 premium vinyl electrical tape for optimal performance.

Dimensions of KC86 Tape
2.5” x .1” x 23.6”
63mm(width) x 2.5mm(Thickness) x 0.6m(length)
Consult us for other sizes

Specifications of KC86 Tape

Waterseal Mastic Resistant to Corrosion, Chemicals and Salt Water

Applications of KC86 Tape

• Moisture seal and insulation in power cable through 600 volts

• Moisture seal and insulation of telecommunication cable connections in base stations, antennas and aerial feeders

• Other moisture sealing applications

Waterseal Mastic Resistant to Corrosion, Chemicals and Salt Water

FAQ

1.Before placing order, can we make sample firstly?
Sample can be arranged to send to you to test before placing order.
Sometimes sample is free ,sometimes sample charge should be included if more than 3 pcs with material .
But we are afraid freight charge will be paid by yourself.
Certainly, we will adjust additional sample and freight charges into your bulk order.

2.How can I get your sample?
Of course, we can send you some samples. Most samples are free, but sometimes we will take small sample fees.
Maybe you also send us your DHL or EMS/UPS/TNT etc account ,so you can pay for air freight to your carrier company directly.

3.Whether we can print our logo or need our color or size or not?
Yes, because we have our own factory and R&D team, so we can make products as your demands.
We can print your logo, we also can make as your size and print it as your color.

4.How many kinds of payment terms you can accept?
About payment terms, we would like 100%TT if less than $1000.00
Usually for bulk order , would like can be paid pay 30%- 50% advanced payment and the rest should be paid before dispatch.
We hope this information will be helpful to you, if you have any question, please feel free to contact us, we are always at your service.



Q:What material waterproofing can be mixed with cement sand
Construction can be made with the waterproofing agent and cement made of waterproof mortar. The ratio of cement to sand is 2: 3, and the amount of waterproofing agent is 1% of the cement.
Q:Oriental rain rain waterproof how to
Oriental rain rain waterproof paint is not good to say it, but real to do it, rely on the quality of their own business for the relentless pursuit and practice. Oriental rain rain waterproof coating from the selection to the production to the final product testing are as much as possible meticulous.
Q:Waterproof mortar expensive or dry mortar expensive
Dry mortar is usually called hydraulic cement mixed mortar, refers to the dry sieve treatment of aggregate (such as quartz sand), inorganic cementing materials (such as cement) and additives (such as polymers) and so on a certain proportion of physical mixing Into a granular or powdered, in the form of bags or bulk transported to the site, add water, mix directly after the use of materials.
Q:Villa roof leakage what general reasons, what materials to remedy
Second, if the roof is only the original did not do waterproof, only need to remove the leaky parts of 2 ~ 3cm deep after cleaning, you use asphalt irrigation, and now there is finished asphalt coating, such as sunny day when the treatment will basically not Leaked out. If there is a waterproof layer is too much trouble, to be around a range of waterproof tick, re-do waterproof, do when the attention and the original waterproof junction to do reinforcement layer. There are many ways to deal with leak detection, or to find some professional leak-proof companies to deal with this problem.
Q:What material is used for waterproofing of tarpaulin
Polypropylene Coil is only suitable for use in the top, waterproofing membrane is mainly used for building walls, roof, and tunnels, highways, landfills, etc., to resist the external rain, if it is home improvement Waterproof with this is not good, with tar ingredients, pollution of the environment.
Q:How does the finished ventilator manufacturer waterproof?
In the latest country set JJCJ33 clearly stipulates that the structure to be waterproof, refers to the internal ventilation of all nodes and ventilators and roof all the nodes,
Q:What is the price of a waterproof window cover?
2, the bottom liner Composite sets of most of the finished use of the bottom liner and decorative panels. Market sales of the bottom liner and decorative panels are 1220 * 2440 mm specifications, the bottom liner thickness of 18,15,12 mm three, the production of doors and windows or cabinet liner thickness of the use of 18 mm. Bottom liner according to the different materials, is divided into blockboard, MDF, particleboard, melamine board. Commonly used for blockboard and MDF.
Q:Waterproof material water leakage construction should pay attention to what
3, do the closed water test After the waterproof construction is completed, the water storage test. Will be blocked all the toilet outlet, the door at a pound of about 200mm high barrier, and then poured in the bathroom about 20mm ~ 30mm deep water, and 24 hours after the inspection of the walls and the ground around the leakage phenomenon , Waterproof test is to ensure the quality of the bathroom waterproofing the key, we must do. Such as after 24 hours without leakage as qualified. If you find a leak, you should immediately stop the water storage test, re-waterproof layer to improve the treatment, after passing the water test.
Q:Roof for the insulation, Master roof, using two waterproof construction program
Third, security measures 1, firmly establish the "safety first, prevention first" safety production policy. Before the operation, the site management personnel must be to the operation team to carry out security technology to the end, and actively carry out pre-class security activities, security personnel check, supervise. 2, the roof around the poles outside the scaffolding (protective railings), roof construction is strictly prohibited removal. 3, roof construction, debris and other materials is strictly prohibited from the roof directly down throwing. 4, storage of coils and adhesives warehouse or site to prohibit the fireworks, for the use of fire, there must be fire prevention measures, and should set a certain number of fire extinguishers and sand bags. 5, oil drums should be flat, not two carrying, in the transport process, pay attention to balance, the spirit to focus, to prevent accidental fall caused harm. 6, transported to the roof of the material, should be scattered on average, with the use of transport, not concentrated stacking. 7, the use of torch, you should clear the surrounding flammable items, must be away from the base of oil, is strictly prohibited in the brush base oil area using the torch. Torch petrol should not be over full, cheer should not be too much, in the fire site must be equipped with fire equipment.
Q:How to do waterproof bathroom, construction process is what
4, closed water test. Closed water test, the highest point of the ground water can not be less than 2 cm, save at least 24 hours, observe the phenomenon of no leakage after the operator. If there is leakage, need to redo, and can not neglect.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords