Two-section long-reach boom excavtor long rech boom and arm komatsu 350
- Loading Port:
- Guangzhou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 10 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Excavator big and small booms include standard boom and lengthening boom, wherein the lengthening boom can be classified into two-piece lengthening boom, three-piece lengthening boom, slipping telescopic lengthening boom and barreled telescopic lengthening boom. Moreover, we can design and produce all kinds of standard booms and lengthening booms for other brands of excavators, and have ability to ensure structural strength, use performance and quality of product by stress analysis, selection of materials, technology and process, design and making by virtue of advanced computer-aided design system, diversified processing equipment, well-trained staff and actual application and experiences. An internal buffer board inside the boom can bear tension loading and further the service life of excavator.
Weight of Building Machine | 12T | 20T | 22T | 30T | 35T | 40T | 45T |
Parameters | |||||||
Total Length of Boom and Bucket Arm(mm) | 13000 | 15380 | 15380 | 18000 | 2000 | 2200 | 24000 |
Working Weight(Kg) | 3000 | 4000 | 4200 | 5200 | 6000 | 6500 | 7000 |
Bucket Capacity(m3) | 0.3 | 0.4 | 0.4 | 0.4 | 0.5 | 0.6 | 0.6 |
Maximum Excavation Height(mm) | 11300 | 12510 | 12610 | 13720 | 14920 | 16100 | 17300 |
Maximum Extension Range(mm) | 12500 | 15100 | 15100 | 17600 | 19600 | 21600 | 23600 |
Maximum Excavation Depth(mm) | 9000 | 11340 | 11370 | 13000 | 15000 | 16500 | 18000 |
Total Height(mm) | 2900 | 2980 | 3040 | 3210 | 3210 | 3400 | 3400 |
Additional Balance Weight(Kg) | - | - | - | - | 2000 | 2500 | 3000 |
- Q: Okay so I just got 3 fiddler crabs, 1 male and 2 females.I just bought a 10 gallon tank to keep them in, and I put sand in the tank on the land side and gravel on the water side, I started pouring water in and now the water is brown because of the sand.It's ZooMed Excavator clay burrowing substrate.I have 2 filters running in it right now to try and clear out the murkiness, but I want to know if it's okay to put the crabs in now, or if I should wait until the water is completely clear?I have a small pool with clear water in it that they can use but I am afraid of putting them in the tank because I don't know if they can swim in murky water.HELP PLEASE!
- Firstly, Crabs have poor vision, and even if they cant see for a few hours while the tank clears, they will be fine. you might want to turn the lights off so that they dont stress, and turn them on when the water is clear. other than that, i would assume they would be fine. if the pool u have has chlorine in it, then obviously dont put them in it, but if it has decholrinated water that is safe for the crabs, then it might be a temporary setup. hope that helped
- Q: has anyone actually used it? would you recommend it for a leopard gecko?
- For a leopard gecko I would not recommend anything but paper towels. But thats me. The adults can live on any surface as long as its not to hot or cold. They are not really going to dig in the clay so its a waste of time but it will not hurt them. Thanks for answering my question also.
- Q: It's about 10 x 15 feet and also includes a wooden deck.
- I run a penal complex in VA and we had an same problem with a clean outdoors freezer that change into laid in part in the floor on a concrete base. It rose 14 inches till contractors got here across out we laid it on precise on an undrground move. i desire that is not your case; we had to desert the unit at it is modern-day placement and ended up growing to be a drainge pond there. there is a few thing causing the pool to enhance upwards, concrete doesn't flow in that way except it is helped. seem into that theory for a lengthy time period. Godspped and sturdy success.
- Q: I was wondering what other states call their Underground Utility Locator Service. By the way, JULIE=Joint Utility Locating Information for Excavators
- we call manitoba hydro
- Q: Is/are there specific formula/s?
- If you wanted to calculate the volume with some accuracy, you would graph the shape of the bucket and using calculus, find the area under the curve(s). Then just multiply by the length of the bucket. Or a quick and dirty estimate would be to multiply the length by the average width times the height of product carried in the bucket. Or, using what I call the Thomas Edison method, ram the bucket into a big pile of sand, dump it out on a surface and shovel it all into buckets of known size. Add 'em all up and you've got your volume.
- Q: Please I'm getting a bearded dragon juvenile pretty soon from the Petco and I'm getting some Zoo Med Excavator Clay Burrowing Substrate for my tank.How could it harm my beardie?Give me a number out of 1-100 percent of how much it can hurt my beardie and gimme some info of using it and is it hard to clean feces out of the cage give me a example of how to clean it out (what to use too) and is it safe?
- The best things you can use as substrate are paper towels and reptile carpet. Sand, of any sort, poses the risk of impaction. If you want to provide a sand box for your bearded dragon most reccomend common playsand that you can get cheap at Home Depot etc.
- Q: What kind of excavator is trong?
- Usually with tracks or wheels. Because of its special appearance, in the various titles, such as backhoes, backhoe digging machine, etc..
- Q: NEW ORLEANS - Thieves hauled off $100,000 worth of heavy equipment that was being used to help build a Lower Ninth Ward memorial to the victims of Hurricane Katrina. A Bobcat excavator and a Bobcat T300 Skid Steer Loader, both of which require trailers or flatbed trucks to transport, were removed from the site sometime between midnight and 6:30 a.m. Saturday, construction company officials said.In the neighborhood that remains nearly pitch black at night almost a year after the levees failed, the equipment didn't last three days at the site.Can you really blame them???? Almost a year and no fucin homes put up and some assholes are tryin to build a memorial for the dead people (no disrespect) and sayin fuc the ones that are alive, I would have stole the equipment too. Why the hell are they even building a memorial in a town where anyone that its quot;SUPPOSEDquot; to be for isnt even there to see it because they are out of a home and jobs, what the fucs the purpose????
- It became likely an same ones shown on television who were hauling off everythng they could get their hands on. fairly, in a city without eelectricity, no operating water, no nutrition why do you want to thieve 20 packing bins of Nike shoes? I said that on nattional television very last 3 hundred and sixty 5 days. i might want to were stealing nutrition. yet i'd not were stupid adequate no to evacuate at the same time as a category 4 became heading my way.
- Q: I took a traineeship in hospitality very hastily and I have realised I HATE it, the 5.30am starts (I don't mind getting up at 5.00am but not starting work then I don't like) I was looking at looking for an Electrician Apprenticeship or getting in to Heavy Vehicle Operating (Bobcats, Front-end loaders, Excavators etc.) but other than doing the TAFE courses I'm not sure how I would go about getting to it as a job.I'm after PROS and CONS from people who know what they are talking aboutRegards
- If you don't like it your not gonna last, do something you like to do. If you want to work on Heavy Vehicles talk to you counciler they can usually point you in the right direction. I can give you pros and cons, but my oppinion might be differnt from your or the next person. Hope this helps you out
- Q: 1) what type of lever is the bucket on the dragline excavator attached to? where is its fulcrum?2) identify any pulley systems in dragline excavator. What are their functions3) the bucket of a power shovel is smaller than that on a dragline excavator. Why?4)what types of levers can you see in the power shovel? where are their fulcrums?5) since the load in the bucket requires so much engine power, why don't the engineers include many more pulleys? (Hint: consider the force acting between each cable and the surface of each pulley).6)
- Here okorder /
Send your message to us
Two-section long-reach boom excavtor long rech boom and arm komatsu 350
- Loading Port:
- Guangzhou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 10 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords