Tower Cranes luffing self-ascending QTZ80(5513)
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
QTZ80(5513) Description
Feature: Tower Crane Condition: New
Application: urban construction Rated Loading Capacity: 1T
Rated Lifting Moment:400KN.M Max. Lifting Load: 6T
Max. Lifting Height:160M Span: 55M
Model Number: QTZ80(5513)
Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate
Colour: Orange/ Yellow
After-sales Service Provided: Overseas third-party support available
QTZ80(5513) Features
1.Ten years of experience in supplying new self-erecting tower crane with Taiwo Brand.
2. Export to more than 20 countries with CE/ISO/GOST Certificates.
3. Stationary/Travelling, external/ internal climbing tower crane
4. Impeller blasting/rust protection paint
5. Advanced painting process
6. Potain masts designed with dismountable panels, making teansport easier and cheaper.
7. New designed mast, can be used to Internal and external climbing tower crane
8. Engineers available to service machinery overseas.
QTZ80(5513) Specification
QTZ80(5513) Pictures
QTZ80(5513) FAQ
Q: What is the building hoist main purpose?
A: Building hoist equipped with double or single cabin to transport the materials and labors up and down. It's the ideal construction equipment for vertical transportation in the field of construction.
Q: What is the function of the monitor?
A: Monitor, namely inspection system (like black box), which could store 10000 tower crane operation reports, and it is recommended to be installed in big cranes more than 16t.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q: If a friend folded a thousand paper cranes for you what would you think?
- That they have too much time on their hands.
- Q: How can you tell the difference between a mosquito and a crane fly?
- Crane flies are about an inch long, sometimes larger - just the body, not including the legs.
- Q: I am NCCCO certified here in the US and would like to know how to be able to work as an operator in France.
- Me too(NCCCO) how long for you? What do you run? I run a Terrex/demag a/c 140, Grove TMS 870, and a little national 40 ton. Anyway, sorry I don't have an answer but the other day just for kicks I was looking around to see what's going on and searching crane operator+job and there's a huge worldwide company, slips my mind but they kept coming up all over hiring operators all over the world. Give that a try, if I was single I'd be going everywhere, and getting PAID to do it but my wife and kids mean too much to be away. Try this.... search crane service+france email some crane outfits and ask around, it can't hurt.
- Q: I have a vessel 40 feet off the ground in a platform, and the crane can get to within 30 feet of it (from the side). I'm more curious of the process for sizing them though.
- As you won't be building your own crane (that would be stupid since you would be fully liable). Call a crane vending/renting company. They'll be more than eager to provide you with technical council. How you pick a crane? What do you need to do with it - type of crane for instance -Moving stuff around in a warehouse, yard,.. always at the same places = overhead crane -Lifting heavy stuff once (for instance another crane) or for a short period - mobile crane -lifting stuff for a longer period but not permanent (construction) = tower crane How much do you need to lift, what can it cost? ... It's al pretty simple
- Q: Well I folded 100 or so cranes from cheap origami paper (red, yellow, green and blue) before I decided that I could fold 1000 cranes a reality. My dilemma is, do I keep the 100 cranes I did and fold 900 of them to fulfill my wish? Or if I discard the 100 cranes and fold 1000, will my wish be granted on the 900th crane? The reason I want to discard the 100 cranes is because it's for my wedding and the color placement of the old cranes isn't fitting at all.Yes I'm aware it's not scientific or realistic, but it's more of faith, I'm not dumb.
- Consider what you would like your 100 cranes to mean. Attach strings to your 100 cranes and then hang them in a tree etc so that the wind may carry your prayers where they need to go. Then start again to create the 1000 paper cranes you want for your wedding. PS: The making of the paper cranes involves an act of faith, not the right colour to match your wedding plans. In Japan, the crane represents peace and healing. When we consider the famous Japanese art-form of paper folding (origami) the crane comes to mind before all else. Sadako and the Thousand Paper Cranes (1977), a non-fiction children’s book written by American author Eleanor Coerr, tells the story of young Sadako Sasaki who lived in Hiroshima at the time of the atomic bombing. Sadako developed leukaemia as a consequence, and lived out the remainder of her short life in a nursing home desperately trying to create one thousand paper cranes. Supposedly, if someone could make a thousand paper cranes his/her wish would come true. Sadako wanted to live. Sadly, she only managed to fold 644 cranes. After her death, friends and family folded the remainder, and buried her with the one thousand paper birds. Today, a statue of Sadako holding an enormous golden origami crane stands in the Hiroshima Peace Park. People regularly leave paper cranes. The plaque on the statue reads “This is our cry. This is our prayer. Peace on Earth.”
- Q: WHAT IS A WADDLE CRANE?
- A Bird
- Q: my father has his forklift and crane license. he needs to know how long they're vaild for
- should be good ror 3 years from the date he got it i just got mine new one last month for a sit down fork lift and crane/ trolly and its good till march 2010
- Q: if the crane starts out at ground level and the skyscraper is being built next to it, how does the crane get moved to the top of the building once the skyscraper has been built to the level of the top of the crane? (eg: the crane can reach a height of 30 stories but the building being const. is 100 stories)
- it takes two cranes
- Q: River? Please give me links. I have seen some videos on youtube about the plane getting lifted out, but none of the crane which is what I was wanting to see.
- The best link I can find is this first one, the second may create more jobs tho...
- Q: I want to make a sculpture out of 1,000 paper cranes. I have sometime to work on it, but not months. Has anyone ever known someone to do this, or done this themselves? How much time should I allow for such a project?
- Do one and time it, then multiply by 1000. Subtract some time because you will get faster from experience.
Send your message to us
Tower Cranes luffing self-ascending QTZ80(5513)
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords