Tower Cranes self climbing grove QTZ63(5010)
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
QTZ63(5010) Description
Feature: Tower Crane Condition: New
Application: urban construction Rated Loading Capacity: 1.0T
Rated Lifting Moment:500KN.M Max. Lifting Load: 5T
Max. Lifting Height:30M Span: 50M
Model Number: QTZ63(5010)
Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate
Colour: Orange/ Yellow
After-sales Service Provided: Overseas third-party support available
QTZ63(5010) Features
1.Ten years of experience in supplying new self-erecting tower crane with Taiwo Brand.
2. Export to more than 20 countries with CE/ISO/GOST Certificates.
3. Stationary/Travelling, external/ internal climbing tower crane
4. Impeller blasting/rust protection paint
5. Advanced painting process
6. Potain masts designed with dismountable panels, making teansport easier and cheaper.
7. New designed mast, can be used to Internal and external climbing tower crane
8. Engineers available to service machinery overseas.
QTZ63(5010) Specification
QTZ63(5010) Pictures
QTZ63(5013) FAQ
Q: What about our tower crane's warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
Q: What is 3 main mechanism of the tower crane?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
- Q: A man said to the universe:“Sir, I exist!“However,” replied the universe,“The fact has not created in meA sense of obligation.”
- Crane was a wonderful poet and author; I have that poem written in one of my journals from long ago. I think he was pointing out that we seek answers and protection from the world outside our bodies when we shouldn't bother with that. The universe is only a backdrop in our play, and we are the ones with power.
- Q: what type of hydraulic oil does a 2007 liebherr LTM 1160 5.1 crane take?
- You're telling me you've been entrusted the control of a crane capable of reaching 565 feet up an you don't know what hydraulic oil it takes?? Jesus Christ mighty... First off, it's in the owners manual, second off it's probably on the resivoir cap.... If you couldn't figure that out you shouldn't be allowed near the damn thing...
- Q: Calculate the work the crane performs.
- Crane work = weight to be lifted x 6.95 m Weight to be lifted = 2.75x10^3 N + 1.20 m^3 (2.00 x 10^3 kg/m^3) (9.8) = 2750 + 23520 = 26270 Therefore, Crane work = 26270 x 6.95 = 182576.5 J
- Q: I need to draw an injured crane (the bird) with an arrow in its wing, lying on the ground...preferably with a splayed wing.How do I draw this? Sketches would help.Thanks.
- Why do you want to draw an animal that is suffering? Draw something that is positive.
- Q: what is the crane track base ?
- Mechanical or birds?
- Q: Is it through the rails? if so, then how? or is it by another method?
- Hot rails running along side the beams Hot shoes on the crane make contact with the hot rails and slide along the hot rails. Hot rails mounted to the beams by insulating bells. The hot rails can be anywhere in size from trolley wires to rails the size of railroad track rails. AC cranes are usually 3 phase so they will have 3 hot rails. DC cranes will usually have just 2 hot rails. Main disconnect/lock out feeds hot rails. It is usually fused but can also be just a disconnect switch. The same arrangement also is used on the crane's trolley. But in the case of the trolley one set of hot rails feeds the trolley motor. One set of hot rails feeds the main hook {big hook} motor: One set of hot rails feeds the auxiliary hook motor {little hook} motor. If the crane is also used as a Mag crane {Electro magnetic can be used} it will also have a set of hot rails going to the trolley for the magnetic
- Q: The question is: A crane has a power of 500watts, and is pulling a 142kg. What is the velocity of the pulling of the crane?Please help and thanks!
- I don't remember ever doing a problem like this, but I will try to solve it. P = W/Δt, P = Fd/Δt P = Fv Force required to lift the 142 kg object; F = 142 * 9.8 F = 1391.6 N Therefore; P = Fv 500 = 1391.6*v v = 0.359 m/s So velocity of the crane is 0.359 m/s. Is that right?
- Q: Why are there extra placards attached to the tower crane tower?
- 2. after adding the placard, it will increase the windward area of the tower crane and increase the wind load of the tower crane, so that it will deviate from the calculation load when the tower crane is designed, and will affect the safe use of tower crane.
- Q: how to calculate load capacity of crane?
- must be sble to left one in half times weight
- Q: What are the types of cranes?
- Two, crane according to the structure is divided into bridge crane and jib crane two categories. (1) traffic, metallurgy specialcrane and Longmen crane, cable crane is a crane (2) portal crane, tower crane, truck crane, crawler cranes, truck cranes, cantilever crane is a crane arm.
Send your message to us
Tower Cranes self climbing grove QTZ63(5010)
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords