• Tower Cranes Model Self Raising Electric in high capacity QTZ40 System 1
  • Tower Cranes Model Self Raising Electric in high capacity QTZ40 System 2
  • Tower Cranes Model Self Raising Electric in high capacity QTZ40 System 3
Tower Cranes Model Self Raising Electric in high capacity QTZ40

Tower Cranes Model Self Raising Electric in high capacity QTZ40

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

QTZ40  Description

Feature: Tower Crane                  Condition: New 

Application: urban construction    Rated Loading Capacity:4T 

Rated Lifting Moment:400KN.M    Max. Lifting Load: 4T 

Max. Lifting Height:120M              Span: 3-48M 

Model Number:QTZ40

Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate 

Colour: Orange/ Yellow 

After-sales Service Provided: Overseas third-party support available 

QTZ40 Features

1.Ten years of experience in supplying new self-erecting tower crane with Taiwo Brand.

2. Export to more than 20 countries with CE/ISO/GOST Certificates.

3. Stationary/Travelling, external/ internal climbing tower crane 

4. Impeller blasting/rust protection paint

5. Advanced painting process

6. Potain masts designed with dismountable panels, making teansport easier and cheaper. 

7. New designed mast, can be used to Internal and external climbing tower crane

8. Engineers available to service machinery overseas.   

QTZ40 Specification

Tower Cranes Model Self Raising Electric in high capacity QTZ40

QTZ40 Pictures

Tower Cranes Model Self Raising Electric in high capacity QTZ40

Tower Cranes Model Self Raising Electric in high capacity QTZ40

Tower Cranes Model Self Raising Electric in high capacity QTZ40

QTZ40 FAQ

Q: How many meters of the steel wire rope?

A: For normal model, the length of the rope is 100 meters. But we could produce the length according to the customer’s request. 


Q: What is the function of the monitor?

A: Monitor, namely inspection system (like black box), which could store 10000 tower crane operation reports, and it is recommended to be installed in big cranes more than 16t.


Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.





Q:Why are there extra placards attached to the tower crane tower?
Because the span of the base is short, the tower is efficient, and the billboard is easy to cause the tower to overturn or bend.
Q:What is an attached tower crane?
Attached tower craneAttached tower crane is arranged close to the building, the tower by themselves to rise up with the increase of buildings and roof, tower, every 20m with attachment support device, the tower body is fixed on the building, in order to maintain stability. Figure 11 is a QT4 - 10 self - elevating four - tower crane (attachable, stationary, walkable, and climbing).
Q:What are the requirements for the use of an anti-two block device on a lattice boom crane used as a drill?
Any modifications to a crane or other hoisting device should be checked with the manufacturer or designed by an Engineer schooled in the proper discipline IE: not an electrical or nuclear engineer.
Q:Do they have to be taken apart... if so, how are they taken apart... by another crane? - but how did that one get there etc etc
Big cranes do have to be disassembled into truck sized pieces for transport, and then reassembled on site. Usually, this is done by smaller cranes, which are mobile. Sometimes a big crane can be assembled on the ground with small cranes, and then lift itself into the air. Sometimes smaller cranes are assembled by bigger cranes on the site. Some of the biggest cranes are tower cranes, which sit on tob of a skinny tower and rotate around. These are assembled on the ground and then lift themselves into the air by building the tower under themselves. Look at the attached link to see how this is done.
Q:vehicle's like car's,truck's etc.need's paper's or document's for regestration or license to used it.what if i mounted or install a crane on it,do i need some paper's or document for regestration or license for the crane?
I am not sure, but you probably do not need one for a crane perse. Although if you do that, you are basically modifying your current vehicle and you may need documentation for that. To be sure, ask the Land Transportation Office. or visit their site: www.lto .ph/
Q:when high rise buildings are built a crane is erected to lift iron and cement up. How do they erect these cranes?
Construction cranes are erected on site. They are usually assembled on the ground with small cranes, then lift themselves up. The erection sequence is carefully figured, so minimal other equipment is needed. For conventional cranes that are permanent and thus only assembled once, portable cranes are used to erect them. Still, generally pretty much on the ground. Some have counterbalances that are permanently fixed, others have a rail type mechanism that moves in and out.
Q:The arm of a crane at a construction site is 12.1 m long, and it makes an angle of 30° with the horizontal. Assume that the maximum load the crane can handle is limited by the amount of torque the load produces at the base of the arm. (a) What is the magnitude of the maximum torque the crane can withstand if the maximum load the crane can handle is 500 N?(b) What is the maximum load for this crane at an angle of 35° with the horizontal?
(a) What is the magnitude of the maximum torque the crane can withstand if the maximum load the crane can handle is 500 N? τ = FL τ = 500(12.1cos30) τ = 5239.45 τ = 5240 Ν?m (b) What is the maximum load for this crane at an angle of 35° with the horizontal? τ = FL F = τ / L F = 5239.45 / 12.1cos35 F = 528.6109... F = 529 N I hope this helped. Please remember to vote a Best Answer from among your results. It's good karma as it keeps things in balanced exchange.
Q:I want to know how to make the best and easyist paper crane with origami.
How okorder /
Q:I don't really believe that the wish will be granted.Anyways I've really been into Origami and I remember reading in my Heroes book (slash the show) that a certain number of cranes means a wish. But before I start making all these cranes, I want to know if it's 100 or 1,000.So if you haven't gotten it in your head yet the question is:Is it 100 or 1,000 cranes to get a wish
1000 Cranes Wish
Q:In the Legend of Sleepy Hollow Ichabod Crane has come from?
In 1799, young constable Ichabod Crane is sent from New York City, New York to the fledgling settlement of Sleepy Hollow to investigate a series of ghoulish murders.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords