Tower Crane TC7050 Construction Equipment Wholesaler
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Tower Crane TC7050 Details:
Minimum Order Quantity: 1unit Unit: unit Loading Port: China main Port
Supply Capability: 5unit/month Payment Terms: T/T or L/C
Tower Crane TC7050 Description:
1.CMAX Tower Crane TC7050 is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2. Tower Crane TC7050 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.
3. Tower Crane TC7050 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4.Tower Crane TC7050 has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on.
5.Tower Crane TC7050 has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.
Tower Crane TC7050 Parameter:
Max. working range 70m, tip lifting weight 5T and Max. lifting weight 20T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 50
Max height with attachment (m) 200
Working range can be adjusted (m) 50、55、60、65、70
Min working range (m) 2.5
Max lifting capacity (t) 20
Tip load @ 50m (t) 5
Tower Crane TC7050 Packaging & Delivery:
40HQ container
20~25days after deposit
Tower Crane TC7050 Diagram:
Tower Crane TC7050 Technical Sheet:
Tower Crane TC7050 FAQ:
1.What is tower crane?
Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.
2. What is the meaning of the tower crane’s code?
Take Tower Crane TC7050 for example, the first two letters “TC” means Tower Crane, “70”means jib length is 70 meter, and the last two letter “50” means the tip load is :5 ton.
3. What is the principal to quote the right tower crane to the client?
First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.
- Q:i just ordered a new JG 614 crane stock and do not know how to use the crane stock i would like to learn before it arrives can i have a link to a video or explanation please
- Try reposting in the 'toys' or 'airsoft' section. This section is for men with real guns.
- Q:why are siberian cranes endangered?
- The traditional migratory and wintering habitats of this species are under constant pressure from the demands of the growing human population. These include: agricultural development, wetland drainage, oil exploration, hunting, and water development projects. The western population is primarily threatened by hunting whereas the eastern population is at risk from loss of wetland habitat.
- Q:The earthing resistance of tower crane shall not be greater than that of the tower crane
- Three. Technical specification for temporary power safety on construction site JGJ 46-20055.4.2 within the construction site crane, derrick and Longmen machinery equipment, metal structure and steel scaffolding and under construction in construction projects, when lightning protection devices in adjacent buildings, structures and other facilities outside the protect zone of lightning arrester, lightning protection device should be installed in accordance with the provisions of.5.4.7 lightning protection electrical equipment machinery, connected to the PE line must repeat grounding at the same time, with a repeat of the mechanical and electrical equipment grounding and lightning protection grounding machines can share the same grounding body, but should be consistent with the repeated grounding resistance of grounding resistance requirements.The electrical equipment of 9.2.1 tower crane shall comply with the requirements of the current national standard "safety regulations for tower cranes" GB5144.9.2.2 tower cranes shall be subjected to repeated earthing and lightning protection grounding as specified in Clause 5.4.7 of this code. The earthing device of the track type tower crane shall comply with the following requirements:L the two ends of the rail are respectively provided with a grounding device;The joint of the 2 track is electrically connected, and the ends of the two tracks are electrically connected in the loop;3 long track every is not more than 30m and a grounding device.
- Q:Captain Kirk, TJ Hooker or Denny Crane?
- Captain Kirk.
- Q:A. Designated operatorsB. All construction site personnelC. InspectorsD. All of the above
- Crane are extremely dangerous and complicated machinery , the operators need intensive education and training , they have to pass the required tests to be certified . Now even the signal guy on the ground who helps the crane operator needs to be certified . So your answer is A.
- Q:Are the creators of the Karate Kid movies apologetic about the white crane defensive stance?
- The movie was not a documentary, nor was it a how-to. As a result, the writers are given what's called poetic license to portray movements in any manner they wish, whether or not the techniques, philosophy, or theories behind them are accurate. I have never heard of anyone being apologetic about the movies or any of the techniques therein. But, I don't think they ought to be. The movies on both sides of the generation gap that separates them are equally entertaining.
- Q:What is a TQ80 tower crane?
- A full swing jib crane with a tower type structure, a crane that can travel along the track and is equipped with a full swing arm.
- Q:What is the present status of large Boom Tower Crane?
- Large boom crane arm depicts one and another new history. New York's World Trade Center towers is the skyscraper that is the highest and has the most floor in New York City .Its main building is steel and concrete composite structures,using steel 78 thousand tons.The Building started in 1966 and lasted seven years, with 110 layers, 411 meter in height as a giant skyscraper it is writed in history. During in Construction
- Q:What kind of personnel should be installed for the tower crane installation and disassembly?
- According to GB specifications:2.0.3 the installation and disassembly of tower cranes shall be provided with the following personnel:1. The project and the safety supervisor and the mechanical management personnel who have the safety inspection certificate;2, with special construction operation qualification certificate of construction, lifting machinery, installation, demolition workers, lifting signal workers, lifting drivers, cable operators and other special operations personnel.And an electrician.
- Q:Examples of filling and acceptance forms for tower cranes and examples of filling in.
- 4 data filled in the requirements of the project, in addition to fill in the above sign, but also need to fill in the corresponding data. Data that needs to be filled in should be separated by "/" or "," and, if necessary, distinguished by text or graphic.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Tower Crane TC7050 Construction Equipment Wholesaler
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords